assistant civil engineer
ABC group
Total des années d'expérience :18 years, 7 Mois
plemented a commercial tower of 16 floors, conducting isolation, piles, posttension slabs, infrastructure, exterior and interior decoration, and landscape with an
average of 300 workers.
● Spearheaded the introduction of modern vibrating trusses for car inspection facilities,
enhancing the efficiency and accuracy of vehicle inspections.
● Managed the General Traffic Directorate Project in Basrah, from inception to
completion, leading a multidisciplinary team of 1000.
Supervised the construction of a 24-floor commercial tower, ensuring compliance
with safety regulations, quality standards, and project timelines.
● Oversaw the implementation of various construction techniques, including piles, posttension slabs, isolation systems, landscape, exterior and interior decoration and
finishing for high-rise buildings.
● Led and coordinated a team of up to 250 construction workers, including skilled
trades, labores, and subcontractors, to ensure smooth project execution.
performing the structural works of the palace
performing the thermal and water insulation works
performing the interior and exterior decoration works
● Supervised the completion of a central region gas pipeline project within the
stipulated timeline, through collaborating with 1200 workers.
● Improved pumping station efficiency through the optimization of equipment
maintenance schedules and troubleshooting procedures.
● Oversaw the production and placement of concrete stabilization blocks, meeting
industry standards and project specifications.
● Managed a team of 25 maintenance technicians in conducting repairs to grain silos,
resulting in a 20% reduction in downtime and a significant increase in storage.
● Implemented a comprehensive concrete crack restoration program using epoxybased solutions, successfully addressing structural issues in different locations.
● Conducted regular inspections and audits of repair work, maintaining detailed
records to demonstrate compliance with safety standards.
Executed Porto Hotel project leading 1500 workers and implementing land
reclamation for sea, piles, structural, cladding, isolation, and decoration.
● Led a team of 1500 workers to complete the first phase of structural work for the 3
Atlantes Towers project, including “conducting isolation, piles, post-tension slabs,
and infrastructure”.
● Developed project schedules, monitored progress, and adjusted plans as necessary
to meet project goals.
● Executed structural frame, marine piles, isolation, and decorations works for 2
projects "Blue Beach Hotel" in Latakia and "As'Saboura Palace" in Damascus.
● Collaborated closely with 1500 workers in 2 projects including architects, engineers,
and subcontractors to streamline communication and project coordination.
● Ensured project timelines were strictly followed, resulting in a 95% on-time project
completion rate, improving project predictability and client trust.
implementation of the construction works for the palace
isolation works
interior and exterior works
● Maintained a 98% compliance rate with local building codes and safety regulations
throughout the hotel construction, resulting in zero regulatory violations.
● led a team of 250 workers in implementing construction and architectural diagrams
for a 245-room hotel project, ensuring adherence to strict timelines.
● Conducted regular quality inspections, identifying and resolving issues promptly,
resulting in a reduction in rework and cost savings.