Maintenance Manager
RJ Group Holding
Total des années d'expérience :13 years, 0 Mois
A. RJ Holding Group (Feb 2017-Present)
Maintenance Manager for Five Hotels Chain (Lahoya Hotels) at Beirut Branch Responsible for:
• Repairing of the Diesel Motors (Volvo, Perkins, Cummins)
• Plumbing, HVAC, Fire Fighting, Electrical and Civil Problems Inspection and Solution
• Laundries Equipment maintenance (Industrial Cylinder, Mega Washing Machine)
Maintenance Consultant Manager for Sigma Gas Factory at Bekaa Responsible for:
• Hydraulic Press Maintenance
• Eccentric Press Maintenance
• Welding Machine Maintenance
• Diesel Motor Maintenance
Duties: Senior Mechanical Engineer for Aircraft Hangars-King Abdul Aziz International Airport Jeddah (Largest International Maintenance Hangars in the world)
1. Site Coordinator for the plumbing work on the site for:
• UPVC Pipe Installation, Hydraulic testing and inspection
• Cast Iron Pipe Installation, Hydraulic testing and inspection
• CPVC Pipe Installation, Pressure testing and inspection
• HDPE Pipe Installation, Pressure testing and inspection
• GRP Pipe Installation, Hydraulic testing and inspection
• Preparing Highlighted drawings for Excavation Department to start the pipe installation
• Quantity Surveying
• Material Request and Inspection
• Design Modification and As built Drawing depending on site condition
• Responsible for the Request of Inspection of Works Preparation (RIW)
• Commercial Management and preparing measurement sheets for the commercial department of the Main Contractor (TAL-JV Union of TAV, ACC, HLG & AL RAJHI Companies)
2. Site Coordinator for the firefighting work on the site for:
• Firefighting Pipe Installation, Pressure Testing and inspection
• Preparing Highlighted drawings for pipes installation as per coordination drawings to prevent pipe clutching with other electromechanical works
• Quantity Surveying
• Material Request and Inspection
• Design Modification and As built Drawing depending on site condition
• Responsible for the Request of Inspection of Works Preparation (RIW)
• Commercial Management and preparing measurement sheets for the commercial department of the Main Contractor (TAL-JV Union of TAV, ACC, HLG & AL RAJHI Companies)
I am working with the United Nation as a Team Leader of the West Bekaa region.I am responsible for the design of the Sewage systems at the Refugees Centers as well as for the food distribution in all of the West Bekaa.
This position helped me in improving my qualifications in the engineering field as well as in the management field. This is because i am responsible for 40 people with in my team.
Working at Hammoud Construction Company as a Mechanical Site Engineer in the field of HVAC plumbing system
December Sep 2011- May 2013 (2 years’ experience in the field of HVAC plumbing system)
I learned about the duct installation as well as the chillers installation and the heat load calculations
i had a group composed of 15 people, we were working in the HVAC systems
Methods and strategies used in the administration of public and private companies
Master degree in Mechanical Engineering (Lebanese International University/ Beirut Campus/ 2011-2013) Master Thesis: Design of variable admission-expansion engine - Prototype implementation. This project consists on the design of a four stroke internal combustion engine where the combustion volume is greater than the admission, compression and exhaust volumes in order to increase the engine power and efficiency taking into consideration the fuel consumption saving. The project is in collaboration with Phoenix INDEVCO R&D at North Lebanon- Jbail
i have a GPA of 3.03 and i am the first in my graduation group