Amro Abou Elez, Project Site Manager

Amro Abou Elez

Project Site Manager

Hassan Allam Holding

Location
Egypt
Education
Higher diploma, FE civil certified engineer
Experience
15 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 1 Months

Project Site Manager at Hassan Allam Holding
  • Egypt - Cairo
  • My current job since February 2023

Project name: Intake Mostakbal Misr
(Four Billion Project)
Project Description: The project (Infrastructure & Irrigation Project) Contains a Cover Dam, regulator, Open Channel with RipRap, Diaphram Walls, Micro Tunneling, Lift Station.
Project Client: Ministry of Water Resources and Irrigation.
Project's consultants: Hydro.
Project’s Contractor: Hassan Allam Holding
Job title: Project Site Manager.

Responsibilities:
1- Review project document (B.O.Q., technical specifications, vendor list, drawings, Cost Center, Cost matrix & Cost estimation files) & visit project site, locate with the owner the location of Public / Private waste areas.
2- Understand project scope & Establish Delivery Methodology.
3- Determine project requirements for project (organizational chart / direct & indirect cost).
4- Review contract agreement & add any necessary clause to achieve the project sucess (Cost / Time) till the signature of contract.
5- Kick off meeting /Site handing over and add any comments may affect the project time/cost, determine site entrances & exits, Storage area & location of Public / Private waste areas.
6- Start the initiation of site Mobilization & Budget zero with project team.
7- Direct Planning & cost control team to prepare and get approval of project progress sheet/ activities break down and project time/ procurement schedule (Base line).
8- Direct Technical office team to prepare material list, shopdrawing & MAR.
9- Direct QC team to get Approval of Quality Plan, method of statements for different activities & ITP.
10- Direct safety team to prepare & approve Safety plan.
11- Prepare communication plan between site and head office (Storage / procurement / administration / secretary, QC & safety).
12- Manage project internal & external daily, weekly and monthly reports.
13- Follow up project costs for direct/ indirect/ fixed & variable costs on the daily basis with all project departments (Storage / procurement / administration / secretary & PCD).
14- Follow up project construction, materials status & approval (MAR), shopdrawing status (SD), quality control (IR, NCR, MIR), letters & submittals through related logs.
15- Follow up Material arrival with head office procurement team.
16- Request for approval of daily materials & projects' equipment from head office as per company policy & procedures.
17- Request for approval of labours & making contracts with Sub contractors & 3rd party as per company policy & procedures.
18- Observe project scope & time schedule, and ensure to demand any time/ cost claims with the right procedures according with contract agreement, Fidic & international practices.
19- Coordinate with all stakeholders and other contractors, and report to client with any work damages / delays.
20- Direct project team to get any required permits.
21- Apply Value engineering to minimise project cost from our previous experience.
22- Attend weekly & Monthly meeting with client and Consultant, explain area of concern and ensure to get client satisfaction.
23- Attend monthly meeting with upper management and present project progress / challenges.
24- Give the managerial & Technical supports to project teams, and deal with unexpected problems that may occur during the project.
25- Direct project team to prepare & approve project T.O.C. and follow up the completion of client / consultant snag list.

Project Manager at Kharafi National - Egypt
  • Egypt - Cairo
  • October 2021 to January 2023

Project name: Sarai Compound
(One Billion Project)
Project Description: The project Contains a complete infrastructure
works such as Roads, Water, Waste water, Irrigation networks,
Hard & Soft Scape.
Project Client: Madinet Nasr Housing & Developments.
Project's consultants: ECG & Sites.
Project’s Contractor: Kharafi National.
Job title: Project Manager.

Responsibilities:
- Same responsibilities for current job but for commercial and residential Project
- Participate in projects tendering and cost estimation.
- Provide technical & managerial support to other projects when needed.

Project Manager at East Port Said Development
  • Egypt - Port Said
  • January 2020 to October 2021

Project name: Development of East Port Said Smart Industrial Zone (Construction & infrastructure of 16 Million Square meter)
(Multi Billion Project)
Project Description: The project Contains a complete infrastructure
works such as Roads, Water, Waste water & Irrigation networks.
Also it contains Waste Water treatment plane, Water treatment Plan, steel Factories, Steel administration building, Soil improvement & Landscape.
Project Client: East Port Said Development Company
(J.V. between Samcrete, Hassan Allam Sons & Ministry of Defence)
Project's consultants: Dar Al Handasa, AAW, A&A, Hydro & etc.
Project’s Contractor: Samcrete, Hassan Allam Sons, Menard & etc.
Job title: Technical Office Manager (Act as Project Manager).

Responsibilities:
1- Prepare and Discuss Yearly Financial Model with upper management to determine the company yearly Budget.
2- Communicate with contractors/bidders, prepare tender packages (drawings, specs., B.O.Q, contract agreements), compare bidders financial & Technical offers & negotiate with them and get best & final offer.
3- Review & approve project time schedules and ensure they comply with company goals & budget (cash in/out).
4- Monitor all contracts & ensure they are on planned time schedules, make periodically meeting with contractors & consultants to follow up projects, discuss obstacles & solutions, and report obstacles, solutions & lessons learned to upper management.
5- Advise & give technical support to company team, contractors & consultants, & attend technical meeting with all parties to make the right decisions technically & financially, attend meeting with design consultants and help to solve any obstacles .
6- Apply value engineering & cost control rules to lower company payments (cash in/out) and ensure to have the optimum quality & least maintenance cost during facility life time.
7- Review, revise & approve contractors’ payments, consultants’ invoices & all projects in progress,
also apply any delay damages as per contracts agreements.
8- Assign & Approve additional works, Variation order & report them to upper management for financial approvals, and study there effects on company financial model and budget.
9- Close out projects / contracts, & handing projects to company according project specs. & contract clauses, receive all technical data for maintenance (as built drawings, devices & equipments’ catalogs & guarantees, & etc).
10- Prepare close out report explaining project real cost, materials used, obstacles, solutions & lesson learned, and add these data to company data archive for future use / guide.
11- Communicate with contractor if any deficiencies appears in project final assurance period.
12- Manage & operate company’ properties, facilities & equipments in Port Said, approve facilities maintenance plan, procurement plan, daily bills & obstacles.
13- Ensure to apply company policies, achieve company’ goals.
14- Welcome company’ clients in Port Said, and present company land, facilities and services.
15- Attend management meeting with all company departments, to coordinate with other departments and ensure we are all in the same page to achieve company goals.

Project Manager at AL Bahaa Contracting
  • Egypt - Ismailia
  • September 2018 to August 2019

Project name: Infrastructure For East Port Said Industrial Area, Water network, Irrigation network, Forcemain & Sewer line up to 7.5m Depth & Inner Diameter up to 1800 mm, using Sheet Piles & Berlin wall as shoring.(Budget: 405 Million EGP).
Project's client: Ministry of Defence, Engineering Authority of the Armed Force.
Project's consultants: Dar Al Handasa.
Project's contractor: Al Bahaa Contracting.
Job title: Project Manager.

Project name: The Construction of Mahsama 1 lift station & Abou Sultan Prestressed Concrete (1200mm Dia.) Pipe lines ( 6.5 kilometer), Ismailia, Egypt (Budget: 350 Million EGP).
Project's client: Ministry of Defence, National Service Project Department.
Project's consultants: University of Cairo, Faculty of Engineering, Center of Water Projects ' Studies and Designs.
Project's contractor: Al Bahaa Contracting.
Job title: Construction Manager.


Responsibilities:
1- Participate in the intiation phase of the project, review project drawing & documents to determine project risks, and study site location, materials suppliers and prices, nogetiate project prices and help in beding processes till sign the contract.
2- Review and take aproval for shopdrawing, and get Consultant's Appoval for all technical documents such as TD, SD, RFI, MR, MIR, ETC…..
3- Attend meetings in company head office to develop a detailed project plan to monitor and track progress.
4- Attend weekly meeting with Dar, Army representative, and other parties to discuss project miles stones, progress of the project, & obstacles.
5- Manage changes to the project scope, project schedule and project costs using appropriate verification techniques
6- Measure project performance using appropriate tools and techniques
7- Plan the work and oversee the buying of necessary materials, hire of equipments and manage staff for the project.
8- Manage the construction site on a day-to-day basis, including supervising the labour force, monitoring subcontractors, checking materials, inspecting work and overseeing quality control.
9- Ensure the project is delivered on time and on budget by setting benchmarks, agreeing budgets and monitoring progress.
10- Check design documents with architects, surveyors and engineers.
11- Promote and maintain health and safety, including site inspections to ensure safety rules are being followed.
12- Write daily and monthly reports.
13- Coordinate with any consultants, subcontractors, supervisors, planners, quantity surveyors and others parties involved in the project.
14- Deal with any unexpected problems that may occur during the project.
15- Making of network shop drawing for Irragation 1200 mm prestressed concrete pipe (6.5 Km) in Ismalia governate.

Resident engineer at Alteraz/Kiklop consultants in Kashmir, Pakistan
  • Pakistan - Karachi
  • February 2017 to July 2018

Project name: The Construction of Muzafferabad University, Kashmir, Pakistan (Budget: 250 Million dollars).
Project's client: THE SAUDI FUND FOR DEVELOPMENTFUNDED.
Project's consultants: Alteraz/Kiklop JV. Consultants.
Project's contractor: Siyah Kalem contactor organization.
Job title: Resident Engineer of Muzafferabd University (39 buildings, infrastructure &Landscaping, on mountain area)
on Kashmir, Pakistan.
Responsibilities:
1- Overseeing/audit of all construction and infrastructure works, such as 39 college buildings, water treatment plant, waste water treatment plant, power plant, roads (including Hilly roads), water, sewer & storm water network.As well water tanks, overhead tank, septic tank and retaining walls on mountain area in Kashmir, Pakistan for King AbduAllah university in Muzafferabad.
2- Coordination &Technical support for All the office projects on Muzafferabad, Bagh, Rawlakot, Mansirah and Abotabad.
3- Ensure that all test reports are verified to meet contract requirements.
4- Ensure that the quality of materials and installation of the work is in accordance with the quality plan identified for the project.
5- Follow up time schedules, and all permits needed from contractors, and ensure that they are in accoredance with contract agreement (FIDIC Contract), specifications and codes standards.
6- Review shop drawings, RFI & RFP prior to implementation.
7- Review & issue payments & variations order for approval from client.
8- Check all materials in site before installation and all tests for them.
9- Design of roads (including Hilly roads), water network, sewer network, storm water sewerage network, water tanks, overhead tank, septic tank and retaining walls on mountain area in Kashmir, Pakistan for King AbduAllah university in Muzafferabad, District Complex Bagh and District Complex Rawlakot.
10-Technical support for All the office projects on Bagh, Rawlakot, Mansirah and Abotabad.
Freelance work:
1- Design of Force main pipe line an choose the suitable pump for a project in St. Simons Island in Glynn County, Georgia, United States.
2- Design Four huge industrial steel hangers With areas upto 5000 m2 in Albeheira, Egypt.
3- Design of Laboratory multi story steel building (Composite section slab) in California, United States.
4- Structural analysis for small industrial steel structure in Australia.
5- Draw contour maps for a project in United States.
6- Design of 8 R.C villas in Raydah, K.S.A.
7- Make time schedule for siphon pipe line in Canada.

Project Engineer at Behera Water & Drainage Company
  • Egypt - Damanhur
  • January 2011 to January 2017

Projects name: The Construction of Waste water network, lift station & WWTP in 15 villeges inAbuHommos & Kafr Aldawar & Aldalangat (Budget: 200 Million EGP).
The rehabitation of water network for over 50 villeges in Beheira (Budget: 55 Million EGP).
Projects' client: The World Bank Organization (IWSP).
Projects' management: Beheira water & drainage company (BWADC).
Projects' consultants: EGEC.
Projects' contractors: Hassan Allam & Horse construction company.
Job title: Project engineer (from2014 to 2017), Design engineer (from 2011 to 2014).
Responsibilities:
1- Execution of R.C building, steel structure, WTP, WWTP, infrastructure works and concrete tanks (under gravity sewer network to underground tanks to pressurized water pipes to the cure station & water networks) over 15 villages in AbuHommos, Kafr Aldawar & Aldalangat, and review shop drawings, RFI & RFP presented from the contractors prior to implementation (Hassan Allam & Horse construction company).
2- Ensure that all test reports are verified to meet contract requirements.
3- Ensure that the quality of materials and installation of the work is in accordance with the quality plan identified for the project.
4- Follow up time schedules, and all permits needed from contractors, and ensure that they are in accoredance with contract agreement.
5- Review shop drawings, RFI & RFP prior to implementation.
6- Review & issue payments & variations order for approval from client.
7- Check all materials in site before installation and all tests for them.
8- Design of concrete buildings, water tanks, steel structures.
9- Building up databases of water distribution network and its accessories of Behiera Governate in Egypt (Area = 9826 km2, population of 6.2 Million, the Model contains more than 50000 pipes and 18 Water pumping stations) with coordination of GIS Department and follow up the updating of these databases with the different branches of Behiera water company.
10- Development of water networks databases to be applicable with hydraulic analysis application.
11- Design carrier water pipelines in Rahmania, Kafr Aldawar, Abu Hommos, Edfina & Desones.
12- Preparing of hydraulic models and studies for the project of Mahmodia water networks (90 Km) pipe lines & water treatment Plant.
13- Preparing of hydraulic models and studies for the project of Kafr El Dawar water networks (80 Km) pipe lines.
14- Preparing of hydraulic models and studies for the project of Abo Hommos water networks (80 Km) pipe lines & water treatment Plant.
15- Preparing of hydraulic models and studies for the project of Nubaria Industrial Area networks.
16- Preparing of Sewer networks planes, Hydraulic models, pump stations and & wastrwater treatment Plant. for new sewer network projects for villages (Abu Seif & Messen) in Behiera governorate funded by Social Fund for Development.
Freelance work:
1-Design for industrial steel building in Nubaria city with bolted connections details.
2-Design of multi stories building in Damanhour City.
3- Schedule water pipe line project & hospital in K.S.A. using primavera p6 .
4- Draw shop drawings & profiles for water pipelines in K.S.A.
5- Supervision of Residential buildings in Damanhour city .
6-Design of many R.C villas, service building and steel structures in K.S.A.
7-Sewer, storm water, contours site plan and site work design and calculation of cut and fill soil quantities in Australia (kallstar pty ltd).
8- Design and supervision of Residential buildings in Damanhour city.
9- Design of 13 stories tower (on piles foundation) in Damanhour city.

Design & Supervsion engineer at Imad Aljabr consultants
  • Saudi Arabia - Alahsa
  • November 2012 to February 2014

Job responsibilities: Design/Technical office Engineer, Project consultant engineer.
Job projects:
A- Design scope :
1- Structural design for villas, water tanks &buildings.
2- Steel structural design (Toyota & Cadillac workshop, Morouj compound recreation sport center & 18 meter elevated tank)
3- Preparing of hydraulic models and studies for the project of Morouj Compound water & Sewer networks in Alehssa.
4- Technical office engineer revise electrical, plumping, h.vac, mechanical, architectural and structural drawings of projects.
5- Preparing bill of quantities and technical specification for items.
6- Design for 7 stories parking building in K.S.A.
7- Design for stadium in K.S.A.

B- Supervision scope :
8- Supervision of Aramco Morouj compound (54 villas, recreation steel building, steel tower carrying water tank, gates building and pump room).
- Concrete and steel constructions paints, ceramic, marble, electrical, plumping, fire alarm, h.vac, isolation, carpentry and aluminum works.
- Infra structure works (water, sewage and irrigation networks, low current works and electrical installations).
- Roads and landscaping (roads, interlock, planting works).
9- Supervision on execution of steel and concrete constructions in ALhasaa.
10- Ensure that all test reports are verified to meet contract requirements.
11- Ensure that the quality of materials and installation of the work is in accordance with the quality plan identified for the project.
12- Follow up time schedules, and all permits needed from contractors, and ensure that they are in accoredance with contract agreement.
13- Review shop drawings, RFI & RFP prior to implementation.
14- Review & issue payments & variations order for approval from client.
15- Check all materials in site before installation and all tests for them.

Site Engineer at Asmael general contractors organization
  • Saudi Arabia - Khobar
  • September 2008 to October 2010

Project name: Al Khobar Gate Tower (Budget: 55 Million SR).
Project's client: Ibrahim M. Nasser Al Sheikh & Abdullah M.Nasser Al Sheikh.
Project's consultants: Buruoj Engineering consultant.
Project's contractor: Asmael general contractors organization.
Job title: Project engineer.
Responsibilities:
1- Execution of Alkhobar Gate tower (37 stories) includes three basements (post tension slab)
2- Making of time schedules for all projects (monthly updated).
3- Estimate Quantites of project' materials.
4- Draw & submit shopdrawings of all civil works.
5- Locating all surveying points for the approval of consultant using Total Station.
6- Check all materials in site before installation and all tests for them.
7- Ensure that the quality of materials and installation of the work is in accordance with the quality plan identified for
the project.
8- Design footing of the steel project structure.
9- Design piles footing of the tower crane

Education

Higher diploma, FE civil certified engineer
  • at NCEES
  • April 2016

Passed the Fundamentals of Engineering (FE) exam in civil discipline, administered by the National Council of Examiners for Engineering and Surveying (NCEES).

Bachelor's degree, Civil Engineering
  • at faculty of Engineering. Alexandria University
  • January 2008

PREPARING FOR CIVIL PE STRUCTURAL DEPTH CERTIFICATE EXAM

Specialties & Skills

Civil Engineering
Structural Engineers
Pipeline Design
Steel Design
Primavera
draw with Revit archtecture
design using csi column
using Microsoft office
design using watergems
design using sewergems
design using consize beam
planning using Primavera p3&p6
design using sap2000
draw with Autocad 2014
design using Etabs
draw with revit structural
design using staadpro 2007
design using safe 12.3.1
shop drawings using AutoCAD Structural Detailing
Photoshop
3d modeling using google sketchup
Autocad Civil 3d
Autocad Advanced steel
Autocad Advanced concrete
Mathcad
Robot structure

Social Profiles

Languages

English
Expert

Memberships

Engineers Syndicate
  • 37/00233
  • October 2008

Training and Certifications

Restoration and strengthening of reinforced concrete structures (Training)
Training Institute:
National Research Centre
Date Attended:
July 2016
Duration:
35 hours
Primavera p3, sap, autocad2007& microsoft office (Training)
Training Institute:
Yat educational center
Date Attended:
July 2007
learning sap2000, primavera p3 , autcad 2007 and microsoft office (Training)
Training Institute:
Yat educational center
Date Attended:
August 2007

Hobbies

  • reading
    reading a lot of books