AMR FARID, Healthcare Projects  Architect

AMR FARID

Healthcare Projects Architect

DAR AL MAJD CONSULTING ENGINEERS

Lieu
Egypte
Éducation
Baccalauréat, Architecture
Expérience
20 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :20 years, 8 Mois

Healthcare Projects Architect à DAR AL MAJD CONSULTING ENGINEERS
  • Arabie Saoudite - Riyad
  • Je travaille ici depuis novembre 2014

- Revising Shop Drawings, Modify And Adjust The Tender Drawings If Required Regarding To
Project Budget.
- Find Out The Conflicts In The Tender Documents. Make The Solutions And Options To Solve.
- Develop Project Design And Shop Drawings.
- Carry Out The Responsibility For Architectural Materials Selecting For Finishing.
- Revising Structural, Mechanical, Electrical and Medical Drawings In The Coordination Process, To
insure all disciplines are going alright.
- Site Inspection For Architectural Finish. Solve The Conflicting Architectural Problems With The
Electromechanical Systems.

Site Consultant Architect à DAR AL MAJD CONSULTING ENGINEERS
  • Arabie Saoudite - Taëf
  • janvier 2012 à octobre 2014

 Architectural finish responsibility .
 Inspecting for submitted materials .
 Revise the shop drawings, Materials for approval .
 Provide the contractor with all available creative ideas to
develop the project Aesthetic quality.
 Monitoring the architectural work process and other works
that involved with it .
 Monitoring the work flow regarding to time schedule .
 Making the work progress updating reports .
 Reviewing the as-built drawings .
 Primary and final submission process.

Architectural Designer à dar al majd cons engineers
  • Arabie Saoudite - Riyad
  • août 2010 à décembre 2011

. Create The Architectural Concepts
 Develop The Proposals, By Hand and/or Utilizing Computer Software
Preparing And Presenting Feasibility Reports And Design Proposals
to the client.
 Coordination with Mech / Elec and Medical engineers consulting
About Design.
 Producing Detailed Working Drawings And Specifications.
 Specifying The Nature And Quality Of Materials Required.
 Preparing Up Tender Documents.

Architectural Designer à Al BARRAK CONSULTING ENGINEERS
  • sa,10,0
  • janvier 2006 à juillet 2010

 Building Finish works, Site layout works
 Preparing Shop drawings, Estimating the required materials
 Negotiation with sub contractors, suppliers and owners.
 Coordinating with other tech departments to keep the Arch working flow safe in time
 Making the work process updating reports .

Junior Architect à Ali KAMEL Consulting Bureau
  • Egypte - Le Caire
  • septembre 2003 à décembre 2005

Present Design Proposals.
 Producing Tender Documents.

Éducation

Baccalauréat, Architecture
  • à faculty of engineering
  • septembre 2003
Baccalauréat, هندسة معمارية
  • à جامعة المنيا
  • mai 2003

Specialties & Skills

Coordination
Interiors
Finishing
Healthcare Projects
Architecture
photoshop
Interior Design
Architecture Design
shop drawing
projects specifications
Materials Revising
3d visualization
Autocad
Rhinoceros
Grasshopper
المنشأت الصحية

Langues

Arabe
Expert
Anglais
Expert

Adhésions

Saudi council of engineers
  • 74600
  • February 2006
EGYPTIAN ENGINEERS SYNDICATE
  • 18/04067
  • September 2003

Loisirs

  • INTERLLIGANCE GAMES
  • CHESS
  • READ THE HOLY QURAN
  • AEROBICS EXERCISES
  • PAINTING