Night DSV
Sinopec
مجموع سنوات الخبرة :10 years, 6 أشهر
July 2010 - Mar 2013
Night DSV in SINOPEC /Syria branch/: Observing all drilling operations as perfect as possible according to company policy ( direction drilling - L.O.T and Integrity test - well testing and completions running tubing casing and testing - cementing - logging - free stuck pipe - handle complete losses - etc), prepare daily drilling report to the senior drilling engineer in the head office - responsible about upload and repack materials to and from ware house - prepare material balance schedule - etc
Drilling P.hole, H.hole and PH.hole . and my responsibility include these main points:
-Prepare the site of next well.
-Rig move and rigging up including all the details about it.
-Check if the all our needs and instruments are ready in hole site.
-Hold safety meetings prior to commencing drilling any section of the well and prior critical jobs and apply safety precautions.
-Supervise drilling every section of the well including (Trips - Clean Circulating - CSG - CEM and WOC - Well head -BOP test and make up - LOT - INT test - Etc …. ).
-Dull grading bit.
-Supervise the Mud Unit - DD (including K.O.P and time drill and …) - MWD - HSE - …..
-Apply the program drilling and completion the well.
-Well cost responsibility.
-Daily paper work (DDR - COST - MUD - Contractors Company - …. ).
- ………….
Jan 2010- July 2010 Assistant DSV in SINOPEC /Syria branch/ for 6 months.
It is a training period for prepare the engineer to be DSV
Feb 2009 - Jan 2010 Trainee drilling engineer in oil field of SPC /Syrian petroleum company/.
It is a study period to prepare the engineer by operation and instruments courses of drilling industry.
Oct 2002 - Feb 2009 Engineer in SADCOP Company in SYRIA, it is the main storage petroleum company.Head of movement products department, that department is responsible to calculate of input and output petroleum products and measure the pressure and temperature of products reservoirs .
1- Certificate from China University of Petroleum " the 1st Drilling Supervisor Training Program . SIPC " in China from 15/9/2011 until 23/12/2011. This program includes: - HSE Management System. - Drilling Geology. - Well Cementing. - Casing Design. - Controlled Pressure Drilling. - Well Control. - Drilling Parameter Optimization. - Pipe Sticking Mechanism. - Fishing Tools and Fishing Operation. - Practical Training. 2- Risk Assessment Awareness .. "INTEX"
Bachelor of Petroleum Engineering, Homs University, 2002. Certificates and Courses