Anbumani Sigamani, Manager Production & Dispatch

Anbumani Sigamani

Manager Production & Dispatch

Cooper standard automotive India pvt ltd

البلد
الهند - تشيناي
التعليم
الثانوية العامة أو ما يعادلها, Mechanical
الخبرات
23 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :23 years, 10 أشهر

Manager Production & Dispatch في Cooper standard automotive India pvt ltd
  • الهند - تشيناي
  • أشغل هذه الوظيفة منذ فبراير 2016

Heading the entire shop floor production planning and Delivery (Sequencing),
Responsible for the day to day activities in shop floor discipline & safety,
Forecasting the wage cost and controlling within target,
Daily review on Productivity and rejection, other down time on machine, material,
Motivating the team and recognize the individual performance by awarding,
Identifying and implementing continuous improvement projects - cost controlling,
Practicing 6S, 3C, KAIZEN, Star Machine, FIFO, KANBAN, TPM, VSM, Visual factory,
Monitoring the RM consumption & Purchase, Sales to control the COGS,
Process flow design and stabilization, Layout design based on VSM outputs,
Cycle time study, Process capability study,
Preparation of SOP/MOS, PFD, CP, PFMEA, Training plan, OJT, Skill Matrix & Evaluation,
Process Evaluation, SPC implementation,
Capacity planning and man machine loading & Line balancing,
Risk analysis, Contingency planning,
Problem solving by daily review with concern department-GEMBA meeting,
Ensuring the POKA YOKE, and machine parameters are in control,
Preparation, Evaluation of ISO TS 16949 & OHSAS documents review and control

Manager Production في Banco Products india ltd
  • الهند - فادودارا
  • أغسطس 2014 إلى يناير 2016

Responsible for Bike radiator, Condenser, Industrial Radiator core building and charge air cooler(Extruded tube), Oil cooler (Draw&Cup, Bar&Plate)for the generators and earth movers,
Identifying and implementing KAIZEN, Cost reduction in production & packing process,
Mentoring and guiding the team to achieve best quality and safe work environment,
Responsible for CAB brazing of all radiators and condensers, charge air coolers, oil coolers,
Handled high pressure leak test under water leak, and Helium leak test,
Coordinating with Fabrication team to get the radiator & CAC headers and tanks, welded cores,
Coordinating with the coating team to complete the powder coating over the bike radiator,
Responsible to complete the monthly schedule and achieving the sales target,
Process flow design and stabilization, Layout design based on VSM outputs,
Cycle time study, Process capability study,
Preparation of SOP/MOS, PFD, CP, PFMEA, Training plan, OJT, Skill Matrix & Evaluation,

III. Engineer في Visteon Automotive Systems India Pvt Ltd
  • الهند
  • أبريل 2007 إلى أغسطس 2014

Visteon offers climate control products and interior solutions to major automotive manufacturers, it was established in1998.

Accomplishments:
New HVAC launch for Ford Figo & Eco Sport, Hyundai Eon, i10, Grand i10,
Simple automation for circlip assembly and eliminated blower motor burns at customer end,
Productivity increased by dual test in leak testing, also double row brazing in Furnace,
Screw feeder implemented in HVAC assembly - Zero QR from the customer,
Traceability POKA YOKE & FIFO rack implemented at HVAC assembly line,
A Vision system implemented to find out the models and missing parts in HVAC assembly

Junior-Executive في Sundram Fasteners Ltd
  • الهند
  • مارس 2006 إلى مارس 2007

TPM model line implemented (See through concept implemented),
Scrap reduced by implementing tool life monitoring and 7QC tools,
Used inserts 0.4R where used in rough machining 0.8R - Rs 6.2Lacks/Yr,
Cycle time reduced in CNC turning by combining the boring and chamfering process

Junior Engineer في Showa Engineering Ltd
  • الهند
  • أكتوبر 2001 إلى فبراير 2006

Accomplishments:
Productivity improved 15% in machining by combining two operations in a single special tool.
High speed cutting tools replaced for all machining then 7% productivity improved,
Productivity improved at drilling operation by implementing auto indexing fixture - 25%,
Operator safety improved by introducing the Hardened steel chip breaking inserts CNC turning,
Rough milling eliminated by introducing a ceramic cutting insert at the CNC milling center,
Productivity improved at centerless grinding by providing material chute,
Hydraulic clamping fixture introduced at VMC and 30% piston productivity increased,

VI

Trainee – CNC machine operator في Autolec Industries
  • الهند - تشيناي
  • أغسطس 2000 إلى سبتمبر 2001

CNC machine operating/ setting (FANUC series),

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, Mechanical
  • في SRM UniversityRaja Gopal Polytechnic
  • أكتوبر 2011
بكالوريوس, Mechanical
  • في SRM UniversityRaja Gopal Polytechnic
  • أكتوبر 2011
ماجستير,
  • في Anna University

- Operations in

Specialties & Skills

Lean Manufacturing
Six Sigma
Manufacturing
Production Management
Production Planning
AUTOMATION
AUTOMOTIVE
COST CONTROL
INDEXING
LAYOUT DESIGN
MENTORING
MICROSOFT OFFICE SPECIALIST

اللغات

الانجليزية
متمرّس
الهندية
متمرّس