Senior QC Inspector
QCON
مجموع سنوات الخبرة :6 years, 5 أشهر
• Monitoring Fabrication, Welding activities of equipment’s & Structural Steel as per ASME SEC VIII & AWS D1.1.
• Inspection of Fabrication & Erection of Piping activities as per ASME B31.3 & 31.1
• Inspection of Fabrication & Erection of GRP & GRV Piping
• Review Test packages and witnessing Hydro Test (piping & equipment’s)
• Witness of Bolt Torqueing & alignment
• Co-ordinate & Witnessing the NDT activities.
• Interpretation of Radiographic films.
• To witness and review WPS /PQR for suitability to work scope.
• Preparing ITPs, method statements and welding procedures.
• Preparation of Inspection Reports and Updating History.
Dear Sir,
Greetings.. !!!
I Have an experience in the role of welding & Mechanical inspector in the Oil & Gas field . Please consider any vacancies . The detailed CV attached here.
Education Qualification : Diploma in Mechanical Engineering
Abroad Experience : 12 Year
Thanks & Regards,
Aneesh K S
MOB QATAR: +974 50170081
protection at MP 21 Gas station
Responsible for the Mechanical Equipment inspection (HeatExhanger, Vessels, Column and Air fin Cooler ) from as found stage to final Box up stage.
•Inspection Of shell, nozzle and internals of columns and Vessels.
•Leak Test Inspection of nozzle and vessels
•Weld Visual and DPT inspection for crack or Pitting Repair.
• Carried out inspection activities as per recommended Inspection Advise Ticket (IAT) for the equipment’s.
•Inspection for Demister Pad
* Carried out final Hydro Test inspectionfor Heat Exchanger, Cooler Box & pipe Spools.Review and maintain Calibration records of NDT Equipments
•Conducting fit up Inspection
•Coordinating and witnessing of UT GAUGING, RTand MPI.
•Coordinating with executive team and third-party inspectors
•Fabrication& Erection and commissioning of Gas Pipelines
• Monitoring Welding Activities & Consumable Control
•Preparation and conducting of WQT & PQR FOR weldersa
•Inspection of all type of gasket and bolt torqueing.
•Carried out Hydro testing Inspection for Valves
Fabrication, Erection and commissioning of Gas Pipe Lines.
•Review the test package Piping Systems.
•Monitoring daily Welding inspection & fit up details.
•Witness of hydro testing and pneumatic testing.
•Monitoring welding activities and Consumable Controls
•Conducting fit up inspection for pipes
• To Check Bevel, Root gap, Root face alignment as per drawing.
•Hot Tapping on Main Gas pipe Line (
Fabrication and erection of water pipe line.
•Hydro Testing and Flushing of Pipe Spools.
•Site Mobilisation for all equipment’s, tools and manpower, review the Construction drawing and specific action as per the contract.
•Attend the Meeting with Clients to discuss the progress and assign the priorities.
•Monitoring the Site activities and site supervisions.
•Ensure the Safety Precautions are implemented during the construction activities at site.
•Coordinating the Civil works for pipe line support.
Projects Handled
1) Wipro IT park Cochin
2) IBS Software Solution Trivandrum
at
at