Project Engineer and coordinator
zte
Total des années d'expérience :12 years, 8 Mois
official management, excel work, pivot table, vlookup etc
Work Domain: 1. ULTA, FLEXI, MR BTS commissioning & maintenance.
2. NODE-B, RNC, 3g commissioning & maintenance.
3. FPR-HUB, RTN, NEC, SDH LINK and PDH links.
4. BG-20, BG-30, BG-40 eci mux.
5.OSN, MUX and routers and switches.
6. FPR RING, RTN RING, NEC RING maintenance.
7.METRO HUB ring maintenance and implementation.
8. HIGH CAPACITY BSC MAINTENANCE, TNMS WORK.
9.technical support for maintenance.
Nokia Flexi, Ultra Indoor & Outdoor BTS .
11.Nokia 1+0, 1+1 PDH, SDH M/W, HUAWIE, FPR &NEC.
FIU, PIU, SMPS.
VSWR Testing Meter, Earth Megar, POWER METER.
14. SRAN, CRFS, 4G handling.
15. FLEXI BSC, HI-CAP BSC, MCBSC nokia maintenance.
16. FIFA, FIQB, FIPA, BB2F, BIOA, RRI, E1/T1 cards handle.
17. bsc backup, cards change, trx creation, trx deletion, edap creation and bsc handling through commands
Commissioning ULTRA & FLEXI EDGE NOKIA SIEMENS BTS,
Site Installation of ULTRA & FLEXI EDGE NOKIA SIEMENS BTS,
Installation and Commissioning of NOKIA, CERAGON.
•Company Name: Worked as team lead of BSS-Network Operation in Nokia(NSN).rest
Of Bengal(ROB), looking zonal O&M in Kharagpur(GK-2)
Address: Zone (ROB-GK2) and purnia (bihar
Work Domain: 1. High Capacity PDH as ring topology using 1+0 protection.
2.nms visibility of ring 2+0 and ring 1+0 .
3. protection of rings and E1 protection.
4. Worked on ceragon IP-10, ceragon sdh.
5. Use of converter for visibility of sites.
6. Tech support online or onsite to working teams in the zone.
7. sdh ring formation, E1 protection and management.
8. CERAGON IP 20N AND IP-20C EQUIPMENT.
9. MW link 0.6/0.9/1.0/1.2/1.8 installation and commisioning.
10.TRAFFIC shifting of pdh to sdh in outage.
11. software and ip handling for visibility of ring and nodes
and bihar Airtel 3G &4G Project & idea (bihar) project
Hindustan college of science and technology, farah, Mathura.
B.tech in ECE branch from HCST, Mathura.