Senior Electrical Engineer
GMAMCO
Total years of experience :1 years, 11 Months
Gmamco builds luxury villas in Emirates hills, Arabian ranches, Dubailand, etc. Also takes up demolishing and maintenance projects.
Job Profile contains the following:
• Preparation of Electrical Drawings - Lighting, Power, Telephone & Data, etc.
• Preparation of Load schedule
• Dewa Submissions
• Site visits and client meetings
Assisted in the Primary Design Team & Secondary Design Team working for DEWA projects
During my training I was exposed to the various aspects of designing a substation.
• Prepared the Bill of Quantity (BOQ) for systems.
• Prepared Single Line and End to End diagrams for 132kV GIS as per specification
• Prepared CT/VT Parameters for 132/11kV Substation
• Prepared Protection Relay list, Relay Accessories list, Fault Recorder List for 132kV System
• Reviewed Schematic Drawings
• Prepared O & M Manuals
• Prepared Daily Submittals to DEWA/Client
• Prepared Tender Documents
Al Ghouta has executed MEP Projects
Projects in Sheikha Mariyam Palace & Zabeel Palace. Projects in the commercial shops in The Dubai Mall, Deira City Centre, Chicago Beach Hotel, Twin Towers Shopping Mall, Wafi Shopping Mall, Palm Strip Shopping Mall, BurJuman Centre, etc
• Preparation of Electrical Drawing Such as Lighting, Power,
• Single Line Diagram Layout, etc
• Site Visits
• Preparing Load Schedule Calculation for electrical Consumption.
• Submits electrical plan layouts on line to DEWA for approval, e.g. lighting, power, site setting, single line diagram, and load distribution.
I am awarded with the Bachelor of engineering in Electrical and Electronic Engineering with Honours of the second Class Upper Division Projects 4th YEAR HONOURS – • Final year thesis paper on design and graphical analysis of stability and frequency measurements of electromechanical systems through PID tuning using Matlab and Simulink. Aced the three course project. 3rd YEAR OF BEng:- • Group leader for a coin sorter design. Individually obtained the second highest mark, also the project was ranked as the best coin sorter model. • Team member for the construction of a Class AB Amplifier. 2ND YEAR OF BEng:- • Group member for the feasibility study on a theoretical company involved in the recycling of white goods in U.A.E. Aced the project. 1ST YEAR OF BEng:- • Built an FM radio • Programmed a buggy using C-programming