PCS Engineer
Turner International Middle East
Total years of experience :4 years, 9 Months
• Preparation and support for development of CPM schedules and precedence diagrams for design and the separate design and construction contract packages.
• Review consultants and contractor’s schedules and facilitate meetings for its finalization
• Provide recommendations when actual progress deviates from scheduled progress so that work maybe re-scheduled or accelerated to provide for on-time completion.
• Assist the Managers during the design & construction stages of the project
• Participate in coordination meetings with the Client, Consultants/Contractors on a regular basis
• Generate weekly and monthly progress reports for Client
• Prepare presentations as needed
• Prepare Correspondences when necessary
• Prepare logs and track proposed design and construction changes, Variation Orders and claims submission from the design consultants and construction contracts in coordination with the Contracts Manager
• Prepare & establish the Project set-up for all communications, documentation, tracking and monitoring, i.e. Work Flow Process & Procedures, Control Forms, Line of Communication and templates for Tracking Logs
• Assist with the facilitation of Constructware and ensures its impelementation until Project completion
Precinct Bridges
- Includes seven Steel Bridges and eleven Concrete Bridges, which connect the different precincts of the Eastern Al Raha Beach.
Utilities
- These include 8 utility networks, namely the water, power, sewer, gas, storm water, irrigation, telecom and highway crossing.
Assistant Planning Engineer
• Made short-term detailed programmes based on sequence of work, wherein look-ahead programmes, concrete forecast and labour forecast reports were also taken from and based upon.
• Updated programmes on a weekly and monthly basis and on request by the construction and management team.
• Attended weekly progress meetings for coordinating, updating and reporting. Directly reported to the Project Manager.
• As-built programmes and reports for delay analysis and early warning notices were also prepared using Microsoft Office and Primavera softwares.
• Generated weekly reports for production monitoring purposes. These include the progress, productivity, resource utilization and mark-ups.
• Made regular site visits in order to have an accurate update and to take progress photos for documentation.
• Checked drawings regularly for material take-off and for recording issue/revision dates. Had an organized and well-maintained filing system of records, mark-ups and other important documents.
Graduated in the top 6, based on GPA. Became president of the class in 1 semester during the sophomore year.