Lead Engineer
Saudi Aramco
Total des années d'expérience :16 years, 9 Mois
- Design Review and Approval
•Review of and Response to Contractor submittals (Technical Queries, Payment Request, Progress Reports, project schedule, etc.)
•Project control and monitoring
•Preparation and negotiation of change orders
•Supervision and coordination between discipline engineers
•Interface with Client and Contractor
•Preparation of scope of work and specifications
•Verification of code compliance
•Labor camp, Site and safety inspections
•Preparation of Reports, Letters and Presentations
Notable Projects:
•JEC Reverse Osmosis and Sewage Treatment Plant - $400 MM
•National Guard Family Compound - $350 MM
•Thuwal Sewage Treatment Plant - $60 MM
Project estimation and bidding
•HVAC and plumbing detailed design
•Fabrication and Procurement of materials
•Planning and creating project schedule
•Site supervision and management
•Preparation of shop and red-line drawings
•Project control and monitoring
•Preparation and negotiation of change orders
•Verification of code compliance
•Preparation of Reports, Letters and Presentations
Notable Proejcts:
•Prestige Residence
•Makassed Hospital Renovation
Cooling and Heating Loads calculation
•Ventilation requirements calculation
•Duct Sizing
•Fan, Pump and Tank Sizing
•Pressure Drop and Head Loss calculation
•Pressure and Gravity Pipe sizing
•Preparation of Layouts and Detailed Drawings
•Surge Analysis, Life Cycle Cost Analysis, Pipe Stress Analysis
•Preparation of Project specifications and Datasheets
•Material equipment selection
•Coordination with other disciplines
Notable Projects
Project estimation and bidding
•HVAC and plumbing detailed design review
•Fabrication and Procurement of materials
•Planning and creating project schedule
•Site supervision and management
•Preparation of shop and red-line drawings
•Project control and monitoring
•Preparation and negotiation of change orders
•Verification of code compliance
•Preparation of Reports, Letters and Presentations
Notable Projects:
•MLK Transit Center
•Brea School District Air Conditioning Replacement
•Palm Desert High School
•Santana High School
•Santiago Hills College
- Project Estimation
- HVAC and plumbing detailed design review
•Fabrication and Procurement of materials
•Site supervision
•Preparation of shop and red-line drawings
•Verification of code compliance