Anub Pillai, Senior MEP Project Manager

Anub Pillai

Senior MEP Project Manager

BIC Contracting LLC (Previously known as Habtoor Leighton Group

Location
United Arab Emirates
Education
Higher diploma, LEED Green Associate
Experience
29 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :29 years, 0 Months

Senior MEP Project Manager at BIC Contracting LLC (Previously known as Habtoor Leighton Group
  • United Arab Emirates - Dubai
  • My current job since April 2007

• Well versed with handling of all site construction management for MEP services.
• Preparation of Work Break down Structure (WBS) and Scheduling the work Activities as per WBS.
• Risk Identification and Preparation of RBS.
• Attending site progress meeting with client & project managers.
• Responsibilities include Manage and supervise complete MEP package, including Solar system, Fuel oil system, Fire protection system, NOVEC system, BMS, ELV system, Fuel oil System, SNG/LPG system, Water Purification System, Elevators and escalator Contractors, Special Systems Contractors, Nominated Contractors, Project coordinators, project engineers, setting time limit to subcontractors & in-house project engineers as per construction programme.
• Arranging internal meetings with MEP contractor, Project coordinators, project engineers, design engineers and sort out all site related issues across the table/Site.
• Monitoring site progress of all above mentioned systems with respect to approved construction programme.
• Managing Authorities approvals from DEWA, Dubai Civil Defence (DCD), ADDC, ADWEA, Abu Dhabi civil defence (ADCD), Civil Aviation etc..
• Checking design drawings for all above mentioned system and issue the same for construction.
• Advising Consultant with Proposal for Technical issues.
• Verify quantity surveyor’s quantity take off and variation claims by MEP contractor.
• Preparing, checking and approving all shop drawings and coordination drawings related to all above mentioned trades and issue the coordinated layout to site.
• Preparing, checking and approving hydraulics calculation for pumps and equipment.
• Preparing, checking and approving all material submittals related to MEP works
• Ensure ordered materials and equipment’s are reaching at site as per construction programme.
• Closely monitor and record the delays caused by sub-contractors
• Arranging and preparing all project closure documents including lessons learned.

ON-GOING PROJECT
Jewel Of the Creek (JOC) Development, Dubai. Package 8 (April -2018 to till this date)

JOC project package 8 is mixed use development consists of 5 hospitality buildings named A1 to A5, 4 floors of common basement, Marina, Ball room and external works with Separate District cooling plant which forms an essential part of the Contract Works which include the construction, completion, testing and commissioning, handing-over and carryout the periodic and preventative maintenance during the Defects Liability Period.

Client : M/s. Dubai International Real Estate (DIRE)
Lead Consultants : M/s. Kling Consult Kieferle & Partner (KCKP)
MEP Consultant : M/s. Kling Consult
Total Work value : AED. 2.5 Billion.

COMPLETED PROJECTS WITH BIC CONTRACTING (HABTOOR LEIGHTON)

i) Sharjah City Centre (SCC) Expansion and Refurbishment project, Sharjah (August -2016 to April 2018)
Client : M/s. MAF
MEP Consultant : M/s. WSP
Total Work value : AED. 250 Million.

ii) Sheikh Shakhbut Medical city. 745 Bed General Hospital (New Mafraq Hospital) (June -2011 to August -2016)
Client : Musanada / SEHA
Total Work value : AED. 4.0 Billion.

iii) Sweihan Air Base for Ministry of Defense, (January -2011 to June-2011)
Total Work value : AED. 2.5 Billion.

iv) Al- Bustan Mixed Use Development, Abu Dhabi (October -2009 to January 2011)
Total Work value : AED. 2.5 Billion.

v) Al-Jazira Club Towers, Abu Dhabi (October-2008 to December 2009)
Total Work value : AED. 500 Million.

vi) Olgana & Hilliana Towers, Dubai (April-2008 to November -2008)
Total Work value : AED. 700 Million.

April 2007 to April 2008 with Leighton Asia, Chennai, India
Designation: Manager Mechanical

i) Motorola Manufacturing Facility, Chennai (April-2007 to April 2008)
Project is a challenging EPC contract.
Client : M/s Motorola India electronics pvt. Ltd
Total Work value : Inr. 1674 Million.

Sr.Construction Manager at ETA ASCON GROUP
  • United Arab Emirates - Dubai
  • June 1999 to March 2007

• Well versed with handling of all site construction management and Engineering Management for MEP services.
• Attending site progress meeting with client, project managers, consultant and main contractor.
• Responsibilities include Manage Complete MEP services including Fire protection system, ELV system, Fuel oil system, ELV, Fire Suppression system, LPG system etc..
• Manage and supervise Construction Managers, project engineers, allot proper work & time to project engineers & site engineers as per construction programme. Arranging internal meeting with project engineers, design engineers, site engineers & site supervisors and sort out all site related issues across the table or at site.
• Monitoring site progress with respect to construction programme.
• Checking design drawings for complete MEP services and notify the design issues to consultants.
• Managing Authority Approvals for Firefighting system, Plumbing and Drainage, Electrical system, Fire alarm system, LPG, Fuel oil system.
• Verify quantity surveyors quantity take off and variation claims.
• Checking and correcting all shop drawings related to fire fighting, plumbing & drainage.
• Responsible for doing Pump head calculation for all types of pumps and take approval for the same from consultant.
• Responsible for all material submittal and approval from consultant.
• Verify material quantity take off and order the materials and equipment as per project requirement.
• Ensure ordered materials and equipment are reaching at site as per construction programme.
• Closely monitor and record the delays caused by main contractors, sub-contractors and consultants.
• Claim extension of project completion date if any delays caused by consultant& main contractors.

MAJOR PROJECTS COMPLETED IN DUBAI WITH ETA ASCON

i) Dubai Marina Mall, Hotel & Hotel Apartments
Dubai marina mall, hotel & hotel apartments for EMAAR properties at Jumeirah in Dubai comprising of 7 floors of shopping mall and car park, from 8th floor to 40th floors having hotel and hotel apartments with a separate gourmet tower.
Client: M/s EMAAR Properties
Project Managers: M/s Hill International.
Consultant: M/s Meinhardt
Main Contractor : M/s Al jabber engg. & contractor
MEP Work value : Dhs. 410 Million.

ii) Jumeirah Beach Residence - Sector 5 (JBR-5)

Client : M/s TECOM
Project Managers : M/s MACE.
Consultant : M/s W.S Atkins
Main Contractor : M/s Al Ahmedia Contracting
MEP Work value : Dhs. 280 Million.

iii) Deira City Centre Refurbishment job for IKEA & Food Court.
Client : M/s MAF
Project Managers : M/s MACE.
Consultant : M/s Mott MacDonald
MEP Work value : Dhs.160 Million.

iv) Mall of Emirates - Snow Centre (SKI Dubai)
Client : M/s.Majid Al Futtaim Investments
Project Manager: M/s. MACE
Consultant : M/S. Roberts and partners (R&P)
Main Contractor : M/s. Al-Nabootha. Co.
MEP Work Value : Dhs. 80 Million

v) T8 - Residential Building for EMMAR properties at Greens:
Client : M/s EMAAR Properties
Consultant : M/s. Al-Hashmi
Main Contractor : M/s. UNEC
MEP value: Dhs. 60 Million

vi. Dubai Convention Center:
Client :Dubai World Trade Centre, Dubai Municipality
Consultants : M/s. Roberts Mathew Johnson Marshall (RMJM)
Main Contractor : M/s. Khansaheb Civil Engineering
MEP value : Dhs. 220 million

vii) Al Ghuriar Centre Cinema & Supermarket Expansion:
Client : Al Ghurair Centre
Consultant : M/s. Robert Matthew, Johnson-Marshall (RMJM)
Main Contractor : M/s. Khansaheb Civil Engineering LLC
MEP value : Dhs. 40 million

viii) AL GHURAIR CITY, DUBAI
Client : Al Ghurair Centre
Project Manager : M/s. Turner Steiner Int’l S.A.
Consultant : M/s. Norr Group Consultants
Main Contractor : M/s NASA Multiplex
MEP value : Dhs.190 Million

Sr.Project Engineer at National Constructions & Trading
  • Oman - Muscat
  • June 1995 to May 1999

Project Completed in Oman with National Constructions.

i. Commercial and Residential building for Mr.Majid al-kuimi
ii. Sky Hanger Facilities for M.O.D at Izki.
iii. Commercial building for M/s Safe way
iv. Tank Hanger Facilities for M.O.D at Shafa
v. Royal Oman Police Headquarters at Sur
vi. Border post for R.O.P at Meazuna.
vii. Land Rover car showroom at Azaiba, Muscat

Education

Higher diploma, LEED Green Associate
  • at USGBC
  • January 2012
Higher diploma, PMP
  • at PMI
  • July 2011
Master's degree, MBA
  • at Manipal University
  • March 2007
Diploma, Mechanical Engineering
  • at Board of Technical education, Govt. Of TamilNadu
  • April 1995
Diploma, Pre-Degree in Science & Mathamatics
  • at Kerala University
  • March 1992

Specialties & Skills

Management
Building Services
Construction & Property
Project Management
Project Management
Mixed Development Projects
Hospitals
Building Services
Construction management
Project Coordination
MEP Management
Mechanical
Plumbing and Drainage
High rise Buildings
Shopping malls
Fire fighting
Electrical Engineering

Languages

English
Expert
Hindi
Expert
Malayalam
Expert
Tamil
Expert
Arabic
Beginner

Memberships

PMI
  • Member with Voting Rights
  • June 2010
NFPA
  • Member with Voting Rights
  • January 2010
ASHRAE
  • Member
  • March 2011

Training and Certifications

Primavera Project Planning (Training)
Training Institute:
Oscar Institute, Dubai
LEED Training (Training)
Training Institute:
In house
Duration:
40 hours
Project Management (Training)
Training Institute:
Zabeel Institute
Duration:
35 hours
NFPA Workshop (Training)
Training Institute:
NFPA
Duration:
8 hours