Graduate Engineering Apprentice
Bosch Limited (Robert Bosch India)
Total years of experience :10 years, 11 Months
Undergoing Training in various departments of the Bosch Limited Jaipur Plant.
1. Manufacturing Department (Production Planning & Control) July 2013 - October 2013:
Responsible for inventory control through usage of Lean manufacturing methods (Pull System synchronized with SAP) Reduced the inventory coverage days by 2 days
2. Manufacturing Department (Process Planning) October 2013 - January 2014: Contributed in a joint study: “Capability Improvement of a Grinding machine” Designed an optimized layout for grinding wheel preparation (Improved the ergonomics with reduction in man-power and process time).
3. Manufacturing Department (Production) January 2014 - April 2014: Responsible for Manpower & Production Planning. Implemented Pull System in the production line with the internal customer
4. Customer Logistics & Procurement (Internal Warehouse) April 2014 - Present: Presently working on reducing the material issuance lead time to the production line by 120 minutes. Implementing Pull from Supplier for “A” class material (to reduce inventory cost).
Received Merit-Cum-Scholarship (50% tuition fees) Chairperson of ASET SAEIndia collegiate club, Did internship in Hindustan Zinc Limited