Qa/qc Civil Engineer
FAISAL Electro-Mechanical Co. Ltd. (FEMCO)
Total years of experience :26 years, 8 Months
Follow-up Project Quality Control Program
Review and check Inspection Test Plan (ITP), Project/Construction Specification, Method of Statement, and approved IFC drawings for civil works.
Perform inspections and verifications during construction activities in accordance with requirements of the Inspection and Test Plans.
Preparation Technical Submittals for Material Submittal as per project specification standard
Responsible for raising inspection (RFI) and tests in the area of civil works.
Preparation of Hold Point Release (HPR) as per Civil Work
Coordinate with 3rd Party Testing /Inspection related to civil works. (Example: Soil, Sub Base, Base course / FDT, DFT, Concrete test, Concrete Compressive Result)
Verification of Material Delivery after that Preparation of Material Inspection (MERSI) submitted.
Attending of Weekly Safety / Quality site walk down with RC
Preparation of Material Selection Approval (MSA)/ Mock-UPS
Preparation of QC Daily Report, Weekly Report & QA/QC Monthly Report (CMQR)
Preparation for quality weekly inspector report submit to Quality Control Manager.
Preparation for Real Card as per RC Specification Standard.
Ensures that any measurement & testing instrument to be used related to civil works are functional and calibrated
Preparation and Maintaining RFI Log, MERSI Log, MSA Log, QAN Log, Inspection Measurement and Test Equipment (Calibration) Log, Mock Up Log & 3rd part test Report Log (Example: Soil Report, Compaction Report, Concrete comparation test Reported.)
Supervision of water pipe line work, execution of trenches and backfilling.
Supervision of sub structure and super structure activities at site.
Supervision of architecture works at site
Conduct inspection for Asphalt Road works and implement the quality control requirement as per company requirements/standards.
Attending Pre-Installation Coordination Meetings.
Co-ordinates with Consultant.
Conduct walkthrough, final walk down and generate punch list for all civil construction works.
Perform other related duties as may be required by Head of the Project.
Prepare quantity survey as per B.O.Q Item Civil Work (Example: Sub-Structure, Super Structure, Precast Work (Wall Panels, Hollow core & Double-T Slabs) and Finishing Works.
Monitor of shop drawings, Red Line drawings & As-Built Drawing Logs.
Supporting of Project Schedule Only (Using by: Primavera Project Planner 3.1.)
Preparation of Proposed Billing Schedule.