project lead
RELIANCE COMMUNICATION
مجموع سنوات الخبرة :17 years, 2 أشهر
Installation and commissioning of Cisco equipment for customer connectivity.
•2. Installation and commissioning of HUWAI equipment for customer connectivity.
•3. Installation and commissioning of TRANSPORT equipment for customer connectivity.
•4. Use CLEARITY to apply PA /PE.
•5. Using SAP for posting the materials and take GRN.
•6. Preparation of daily reports for team members and contractors .
•7. Weekly once visit the completed customer connectivity (HV and low) for quality checking.
•8. Instruct to FEO (FEILD EXCUITIVE ENGG) for maintain the quality of work.
•9. Co-ordination with NOC to complete the PA successfully .
•10. Preparing NDD (Nodal Design Document) and preparing other documents,
•11. Co-ordinate with O&M team to handed over completed sites.
•12. Designing BANs (Building Aggregation Node) in TN Circle
•13. Installation and commissioning of DLC for voice and data customer.
•14. . Install the electronically distribution box(EDP).
•15. . Complete the customer connectivity through PA/PE within the SLA
•16.Designing the ring route( low value, dlc and high value customer) in BAN as per customer connectivity
Under took project for laying of HDPE Duct for fiber to cell site to cell site.
Around 50 km HDPE Duct laid with in the time with face all problem, like corporations police problem.
Done the project 1.5 depth with quality.
Trained to do fiber network planning for ring Topology.
Have worked in the SDH(STM1, STM4, STM16)
Have a experience duct coupling , drum testing.
Have experience in cable blowing and cable pulling.
Fiber terminating up to FMs
Faced police and corporation problems
Done Fiber Splicing for the connectivity of Transport network using Fujikura 40 S Splicing Machine.
Under took Project work for Laying of primary and secondary copper cable 3 months in Chennai.
primary copper laid and terminated to MDF.
secondary cable laid and terminated to pillar to sub pillar..
Here, faced police and corporation problems..
Attend copper cable fault with in the MMTR time.
Very well experience in the O&M,
Attending primary and secondary copper cable fault with in the MTTR time.
8. Telephone line fault rectification (pillar to customer end)
9 .Managing 10 to 15 faults per day
10. Telephone Installation (MDF to customer end)
11 . Network Maintenance.
12. Copper cable laying
13 .Maintains of Rsu.
14.Getting ROW permit ion & police perdition
Dc transformer assembling..
2. Dc trance former coils assembling
. 3. Quality testing
Responsibilities:-
Assembling of PCB’s for the Inductive Proximity Switches,
Assembling of Mechanical Limit Switches,
Worked in Quality Control.
Date of Birth & Age
Handling fiber optic technicians to complete the target.
•Tested (OTDR AND POWER SOURCE TEST)FOC CABLE handed over to client.
•Plan weekly activity to achieve the target.
•Coordination with client .(ABB and MINISTERY )
•Make ready the FOC cable end to end for commissioning for CC camera and Ministry OF Electricity and water( MEW)
•Form FO ring to MEW
, 36 Years old
Qualifications •Passed out
Qualifications •Passed out