Senior supervisor
Moshanik
مجموع سنوات الخبرة :19 years, 0 أشهر
Electrical installation infrastructure in Amirabad port
Special economic zone project of Imam khomeini airport
Supervising and consulting all electrical and control work in the
project
• Installation and commissioning of 30 compact substations (20 KV)
• Cabling: 24 kilometers (MV cables), 40 kilometers (LV cables), 35
kilometers (control cables)
• Fire alarm systems, CCTV, lightening arrester, 400 street lights, 10
lighting towers
• Daily and weekly progress reporting and quantities
• Reviewed the project contract and ensured that all the contract
conditions are applied and fulfilled for project set-up, project tracking
and reporting and project closeout
Project: Tehran-Shomal freeway electromechanical project (EPC)
• Management of 42 million $ EPC project with 700 engineers,
technicians and workers.
• 70 kilometers freeway with 38 tunnels (26 kilometers), 34 bridges and
6 smart tunnels, electrical power required (8 MVA)
• Installation of cable trays (140 kilometers), cable pipe ducts (80
kilometers)
• Installation and Commissioning of 28 substation (20 KV)
• Cabling: 240 kilometers (MV cables), 1100 kilometers (LV cables),
450 kilometers (fiber optic cables), 280 kilometers (control cable)
Lighting: installation and Commissioning of 700 street lights, 9000 tunnel lights, 20 lighting towers
(30 meters height)
• Firefighting systems: 18 kilometers of piping installation of 6 pump rooms. Installation of more than
1000 detectors.
• Installation and commissioning of 200 ventilator jet fans.
• Construction and commissioning of 2 control rooms.
• Installation and commissioning of 40 fireproof smart doors.
• Installation and commissioning of 200 electronic smart signs
Site and project manager of more than 12 projects about distribution power electrical system .such as:
Construction 10 kilometers cable duct bank and 30 kilometers cabling(MV cable) Amirabad Port
Electrification to far mountain villages ( 8 villages) Babol city.construction and commissing of 20
kilometers aerial 20 KV network.
Reducing of electrical power losses project.Installation and commissioning of 40 distribution
transformers(20/0.4 KV). 20 KV Cabling (12 kilometers). Renewing LV aerial network(18 kilometes)
Renewing of LV aerial networks of Babol villages (28 villages) about 42 kilometers.
Renewing of Chalus city substations(20/0.4 KV) about 30 substations.(changing transformers, panels
and cables)
Electrical, instruments and control EPC project of Mobin petrochemical company
20 million$ project of greatest intake in the middle east.
Installation and commissing of 4(60 MVA transformers)(132/11 KV), 2(28
MVA)(11/6 KV), 3 - 36 MVA autotransformers (11/9 KV), 2- 2MVA(11/0.4KV)
Cabling: 30 kilometers (MV cables), 20 kilometers(LV cables), 100 kilometes (fiber
optic and control cables)
Installation and commissioning of 28 MV electropumps.
Installation and commissing of substation with 128 MV panels and 8 LV panel