Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Mohammed AlShaikh, Project Manager

Mohammed AlShaikh

Project Manager·Philips

Saudi Arabia

Bachelor's degree, Architecture

Work experience

Total years of experience: 16 years, 6 months

Project Manager

May 2016 - Present

Philips

Khobar, Saudi Arabia

May 2016 - Present

Company industry:
Other Healthcare Services
Job role:
Management

Project Officer

April 2013 - May 2016

Philips

Khobar, Saudi Arabia

April 2013 - May 2016

Executing project from planning until closing.
(Planning / Connecting with stack holders / setting meeting / following up / Closing submitting final documents )
Accomplished Projects:
- Mammography Suite in Prince Fahd bin Sultan Hospital - Tabuk.
- X-Ray suite in Hail General Hospital.
- X-Ray suite in Al Amal Hospital - Dammam.
- CT Scan suite in ALMANA General Hospital - Al Ahsa.
- Two MRI suites in ALMANA General Hospital - Al Ahsa, Jubail.
- CT Scan Suite in ARAMCO.
- Cathlab Suite in Arrawdah Hospital - Dammam
- X-ray Department in Khafji National Hospital - Khafji.

Company industry:
Other Healthcare Services
Job role:
Management

Architect Inspector

January 2011 - March 2013

VELOSI

Riyadh, Saudi Arabia

January 2011 - March 2013

Duties and Responsibilities

• Inspection of Civil Works at ARAMCO Project (KAPSARC), including (backfill, formwork, steel rebar, concreting, curing, finishing) Ensuring that the Quality of work is complying with the Drawings, Specifications and ARAMCO standards.
• Inspection of Architectural Works at (KAPSARC), including (application of waterproofing, tiles/ Marble, Ceramic, Stone cladding, Gypsum board installation) Ensuring that Contractor is using the correct method and equipment to do the job as required.
• Reviewing: Documents, specifications, IFC Drawings and Details of (KAPSARC) Project specifically in Civil and Architectural work.
• Reviewing, Evaluating new check lists that was issued by Contractor for new kind of work, especially in architectural scope using international standards (ACI, BSI...) and project specifications.
• Weekly, Monthly Reports and Highlights along with it to my Supervisor.
• Supervision and follow-up the contractor’s through work schedule.
• RFI / LBE / NCR Process through ARAMCO network system (QMIS).
• Final punch list inspection for the units which is almost completed.

Company industry:
Business Consultancy Services
Job role:
Quality Control

Architect Engineer

September 2010 - December 2010

SAUDI OGER

United Arab Emirates

September 2010 - December 2010

Project : King Abdullaziz Centre For World Culture ( ithra )

Client : Saudi ARAMCO

Duties and Responsibilities

- Designing support facilities like carpentry, vehicle workshops, as per relevant Saudi
Aramco Engineering Standards.
- Working as Site Engineer to supervise and ensure that the design drawings are
followed.
- Perform Inspection and follow up during construction in compliance with the planned
requirements.

Company industry:
Construction & Building
Job role:
Architecture

inspection engineer

November 2009 - July 2010

AlKHODARI & SONS

Dammam, Saudi Arabia

November 2009 - July 2010

Project : Alkharsanya and Karan Plant's

Client :Saudi ARAMCO through HYUNDAI

Duties and Responsibilities

- Inspection According to ARAMCO engineering standards and check list (SAES's)
(SACI, s) specifically in Foundation work starting with :

a- Excavation: \[ SAIC-A-1004, 1005\]..
b- Formworks: checking the size's of each mold as per drawing \[SAIC-Q-1012\].
c- Steel fixing and anchor bolt setting: checking the thickness, quantity and size of
the coated reinforcing steel for footing and pedestal as per drawing.
d- Concreting: pump and concrete checking \[SAIC-Q-1004, 1006\].
e- Curing: watering the foundation.
f- Concrete Coatings: two layers of bitumen \[SAIC-H-1003, 1004\].
g- Backfilling: selected fill material test, moisture and strength test every (20 cm)
layer of backfilling material; - Preparing check lists for inspection ( SAIC's ) relevant to the type of work.
- Reviewing, adding daily schedule for (QC) civil inspection.

Company industry:
Construction & Building
Job role:
Engineering

Education

King faisal University

January 2009

January 2009

Bachelor's degree, Architecture

Saudi Arabia

GPA (point): 3 out of 5

GPA (point): 3 out of 5

Skills

AutoCAD
Expert
AutoCAD
Expert
SketchUp
Expert
SketchUp
Expert
SketchUp
Intermediate
SketchUp
Intermediate
Quality Assurance
Expert
Quality Assurance
Expert
AutoCAD
Expert
AutoCAD
Expert
Photoshop
Intermediate
Photoshop
Intermediate

Languages

Arabic

Expert

English

Expert

Training and Certifications

Certifications
Project Management Professional
Jan 2016 - Jan 2019
Certificate Of Attendance
Middle East Quality Management Professionals
Apr 2012 - Apr 2012
ISO 9001:2008 Quality management system (QMS)
VELOSI
Jan 2011 - Jan 2011
LEED 201: Core Concepts and Strategies
the U.S. Green Building Council
Apr 2012 - Apr 2012