ELV Estimation engineer
Tyco Fire and Security UAE LLC
Total des années d'expérience :12 years, 11 Mois
Key responsibility includes Specifications Review, CAD Drawing Review, Preparing Network/System Architecture, Engineering Calculations & Impact Analysis for Building Access Control system, Video Surveillance system, ANPR System, Security Intercom System, Key Management Systems, Under Vehicle Surveillance Systems (UVSS), Parking Management Systems, Barriers, Road Blockers, Bollards and Design of Command Control Rooms, Active, passive network and ICT Systems.
Prepare and attend project kick-off, review, and coordination meetings with technical queries, compliance/deviations log, and risk logs. Also, record minutes of meeting in a structured way.
Cover all missing/contradicting information through accurate RFI’s (Request for Information) to get the clarifications from the customer in time so that the deadlines are not affected.
Implements customers’ standard design requirements and processes within the organization
Develops and maintains high-level relationships within Enterprise account clients.
Coordinate with sales/operations team to accurately quote materials and labor including, but not limited to the access control equipment, CCTV equipment, Network infrastructure, cabling, program management, project management, engineering support, programming, and commissioning.
Create a detailed bill of material including but not limited to Servers, Storages, Workstations, Controllers, Field Devices, Software, Integration Modules, Network equipment, Cables, and Accessories.
Prepare cost sheets according to the final BOQ, Cost comparison charts, Checklist, Technical Write-up, Block Diagram, Deviation Chart, etc.
Ensure quality assurance, defect-free deliverables, on-time deliveries, and customer satisfaction.
Escalate issues at the right time, so as not to affect the project delivery schedule; any escalations with respect to the scope devotions/assumptions must be clearly backed up with adequate documentation.
Keep operational parameters at the desired level for all assigned projects.
Material Submittal Preparation.
Le lien a été supprimé pour non-respect des conditions d'utilisation. Veuillez contacter l’équipe d'assistance pour plus d'informations.