arellano jr galdo, SUPERVISOR

arellano jr galdo

SUPERVISOR

MITSUBISHI CORPORATION

Location
Philippines
Education
Diploma, Electricity
Experience
24 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :24 years, 1 Months

SUPERVISOR at MITSUBISHI CORPORATION
  • United Arab Emirates
  • My current job since October 2016

POWER PLANT

FOREMAN at BECHTEL GLNG MODULAR
  • August 2013 to March 2013
TECHNICIAN at WATER-TUBE BOILER
  • June 2007 to December 2012
ELECTRICAL TECHNICIAN at R. I. CHEMICALS (RESINS INCORPORATED) Jasaan Misamis Oriental
  • July 2012 to August 2012
FOREMAN at EEI CORPORATION Villanueva, Misamis Oriental
  • United Arab Emirates
  • April 2014 to August 2012
QC at ATS CONSTRUCTION INTERNATIONAL, INC. Hayanggabon, Claver, Surigao Del Norte
  • January 2013 to April 2012

, Misamis Oriental

PROJECT at YOSHIMENI WATER-TUBE BOILER
  • October 2010 to August 2011
FOREMAN at SANKYU – ATS JOINT VENTURES. Jasaan Misamis Oriental
  • April 2013 to July 2010

SANKYU-ATS JV P20-3 PROJECT
•NEW BAB-HITACHI BOILER #02
•HYDROGENATION #02 EXPANSION
•INTERMEDIATE TANK YARK EXPANSION (6 TANKS)

SCOPE OF WORK:

Supervise crews engaged in Electrical/instrumentation works aspects of construction.
1. Supervise and controls skilled labor and work crews engaged in all activities concerned with the
assigned works aspects of the project. To optimize resources (manpower, equipment and
materials) to ensure efficient and timely completion of the works. Able to demonstrate good
organizational skills, following policies, procedures and work practices, and developing improvements where necessary.
2. Read, interpret and follow method statements and procedures. To read and
understand specifications, drawings, and all other discipline related project and engineering
documentation. Keeps records of all work completed and completion of “Action Lists”.
3. Commands respect of workforce, and develops excellent working relationships with all other
department personnel as well as client management.
4. Communicate. Give instructions in an efficient and effective way to
workforce. Liaises with other discipline foremen to ensure the optimum utilization of work,
with the overall objective of successful completion of the project.
5. Ensures that work crews are properly supplied with tools, equipment and materials. Prevents wastage and misuse of equipment, materials and tools. Supervises work crews to best utilize manpower and materials, exercises discipline at the work site to prevent absenteeism, unsafe work practices and idleness.
6. Supervise the maintenance and correct use of tools and equipment such as diagnostic and calibration equipment.
7. Supervise in interpreting and using blueprints, specifications, vendor data, process flow sheets, drawings and schematic diagrams. Familiar with reading circuit diagrams.
8. Supervise in installing area components, lay‐outs of job and fabricating cable tray supports.
9. Supervise in performing calibration of process instrumentation and in modifying control loops,
removes / replaces instruments, adds and deletes systems. Supervises in performing maintenance and calibration of electrical and mechanical transducers.
10. Supervise in the maintenance of machines with programmable logic control, electronic control and pneumatic systems.
11. Supervise the installation of pneumatic instruments and lines of air bellows for balancing purposes and hydraulic lines.
12. Familiarization with and enforces strict compliance with all QA/QC and Safety procedures, plus all Company rules and regulations.
SECONDARY DUTIES AND RESPONSIBILITIES:
1. To Comply with the highest level of safety during all stages of project execution to avoid any type of incidents and or accidents. Take reasonable care of own health and safety and that of others in the workplace.
2. Identifies, formulates and implements training programs for the workforce under my responsibility.

ELECTRICAL FOREMAN
  • April 2008 to March 2010

CENTRAL REFERENCE LABORATORY
•As foreman to 40-50 workers, lead and work for the electrical and the security system of the building.
•Lay-out for conduit and install pull box, boxes for electrical devices.
•Install raceways and lay-out for tapping.
•Install devices for SASS system such as cameras, motion detectors, Card/Pin readers, door locks with magnetic principle.
•Install electrical lights, outlets and tapping of motor/controls.
•Lay-out and install panels for security system, lighting, outlet, motor
and controls and voice/ data.
•Wiring and cable pulling from device to panels then tapping.
•Cad welding for electrical grounding for size 16mm/90mm grounding
Stranded cables and grounding rods.
•Installation of grounding rods from 1to 6meters deep and y/delta type
•Cad welding joint from 1 to 4cables then rod to ground cable.
•Meggering and continuity testing of cables before and after tapping.
•Wiring and cable pulling for 2AKSA GENERATOR 6.6KV from substation.
•Lay-out and tapping generator cables to each terminals by using terminal
Lugs and hydraulic crimper.
•Installation of cable trays, cable ladders and cable ducting

SENIOR ELECTRICIAN at ANEL ELECTRICAL PROJECT AND CONTRACTING TRADE INC. New Doha International Airpor
  • Qatar
  • January 2008 to April 2008
NDIA PROJECT at PK-JEMCO-PILIPINAS KAO INC. (an Oleo-chemical Plant)
  • February 2001 to June 2007

Installation, termination and restoration of electrical cables, circuit breakers, motor controls and motors.
•Lay-out and installation of any size of conduit pipes and fittings.
•Lay-out and installation of any size of pull boxes.

TECHNICIAN at MBDCI-PILIPINAS KAO INC.(an Oleo-chemical Plant)
  • to January 2004

, Misamis Oriental

TECHNICIAN at ANEL ELECTRICAL PROJECT AND CONTRACTING TRADE INC.
  • Türkiye
  • to January 2003

. No. 5, 34768 Umraniye-

TECHNICIAN at JVJ BUILDERS-PICMW INC. Nahalinan, Jasaan Misamis Oriental
  • August 1999 to March 2000

ELECTRICAL WORKS
•Installation, termination and restoration of electrical cable,
Circuit breakers, motor controls and motors.
•Fabrication and installation of any sizes of pull box and panel boards.
•Lay-out and installation of any sizes of conduit pipes and fittings; such a RMC, EMT, PVC pipes.
•INSTRUMENTATION WORKS:
•Installation of instruments and termination of signal cables.
•Lay-out of piping of air-line for instrument signal.
•Lay-out and tubing for instrument signal.
•Troubleshoot and calibrate pneumatic instrument.

FOREMAN
  • March 1994 to May 1997

Pull-out/re-installation and alignment of main engine to shafting, including
Installation of propeller and rudder of marine vessels.
•Alignment of main engine with shafting including pitch controlled propellers.
•Pull-out/repair/re-installation of motor and motor pumps.
•Reconditioning of sea valves such as glove, gate, and foot valves.
•Hydraulic and hydraulic pumps.

ELECTRICIAN at Oriental
  • India
  • February 1990 to September 1990

1. Pull-out/install and repair of generators, motors, and motor controls,
and marine vessel electrical wiring.
2. Installation of electrical wirings, motor, and motor controls of Phil-Sea
Foods Building.
3. Lay-out and installation of any sizes of conduit pipes and fittings.

FOREMAN at AG&P CONSTRUCTION Bauan
  • United Arab Emirates
  • to

Education

Diploma, Electricity
  • at Mindanao Polytechnic State CollegeJasaan Misamis Oriental
  • March 1987
High school or equivalent, Secondary
  • at St. Mary’s Academy Jasaan
  • March 1985

Specialties & Skills

CABLEADO
CARPENTRY
DISEÑO DE LA DISPOSICIÓN
ELECTRICIAN
LIGHTING
PHOTOGRAPHY
WELDING

Languages

English
Expert