عارف محمد, Senior Manager Engineering

عارف محمد

Senior Manager Engineering

Exide Pakistan Ltd.

البلد
باكستان - كراتشي
التعليم
ماجستير, Master of Science (Automation Engineering)
الخبرات
23 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :23 years, 11 أشهر

Senior Manager Engineering في Exide Pakistan Ltd.
  • باكستان - كراتشي
  • أشغل هذه الوظيفة منذ يناير 2014

Key Functions:
• Plan, manage, and oversee the daily functions, operations, and activities of maintenance and engineering Operation for the vertically integrated process plant.
• Develops and standardizes procedures and methods to improve the efficiency and effectiveness of engineering services, projects, and activities; identifies opportunities for improvement.
• Play a lead role with initiating all capital improvement projects/programs, including defining the project scope, identifying internal and external stakeholders, identifying a project manager, and developing a project charter;

Manager Technical/Utilities في English Biscuit Manufacturer
  • باكستان - كراتشي
  • يونيو 2012 إلى يناير 2014

Key Functions/Actions:
• Primarily responsible for managing Electrical, Mechanical, HVAC and utilities department.
• Developing, coordinating, and implementing the aims and objectives of strategies and policies to reduce production down times and energy consumption
• Lead maintenance of plant equipment with full compliance of Health, Safety and Environment standards.
• Improved over all energy utilization and improved infrastructure by initiating and completing Building management system (Schneider), Bus bar trunking for power distribution, Anti-microbial Fabric ducting for air conditioning, LED based lighting(saved around 100 KWH), Intelligent air distribution system, WWTP operation etc.
• Installed Waste Heat Recovery system on Exhaust and Jacket water of Gas power generation (which added 400 USRT in air conditioning system of 1200 USRT)
• Build a professional team comprises of 6 Professional Engineers for future leadership.
• Shifted preventive, corrective and data logging and its reporting on ERP
• Preparing specifications, drawings and tender documents for building services, improvement or plant replacement work, including obtaining statutory approvals.

Head of Project (Engineering/Utilities) في Soorty Enterprises (Pvt.) Ltd
  • باكستان - كراتشي
  • أبريل 2011 إلى يونيو 2012

Mainly responsible for engineering and project management of a new and state of the art textile manufacturing facility (Spinning Unit, 1st Phase 17, 000 spindles).
I lead a team for complete electrical power generation(4 MW on gas) and its distribution network to the machines.(Both HT/LT power), Installation of Lighting system, Reverse Osmosis Plant, a 10 MW furnace oil based power plant(backup), Fire Hydrant system, compressed air and water distribution system for the plant. Electrical distribution to staff to colony, Fibre Optic based CCTV System etc. The plant started production in record time of 11 month.

Head of Plant Engineering (Senior Manager) في Shabbir Tiles & Ceramics Ltd (ISO 9001 & 14001 Certified)
  • باكستان - كراتشي
  • يوليو 2009 إلى مارس 2011

Key Responsibilities:
1. Plan and supervise engineering activities to achieve plant maintenance and reliability targets.
2. Co ordinate, plan and implement improvement in resource utilization and energy conservation.
3. Prepare, monitor and control overall budget for expenditure for related department.
4. Ensure that adequate, competent, and trained resources are available within the department.
5. To ensure compliance to Safety Health & Environment related matters.
6. Maintain computerized maintenance database of all plant machinery, equipment and ancillaries.

Sr. Manager Projects في Shabbir Tiles & Ceramics Limited (ISO 9001 & 14001 certified company)
  • باكستان - كراتشي
  • يناير 2008 إلى يونيو 2009

Our team has built new fully automated Italian tile manufacturing Plants.(Porcelain & Wall). My responsibilities in this project were to independently look after all Electrical & Power -generation and other utility activities.


 Electrical / Electronics
o Installation of PLC s, Process Instruments & Analyzers, Centralized Energy Analysis & management Systems, MV/LV switch gears and distribution, CCTV & Fire Alarm systems.
o installation & commissioning of Continuous Ball Mills, Spray Dryers, Hydraulic Presses, Laser
guided vehicles, Roller Kilns, Polishing and automatic sorting lines
o Vendor’s supervision (ICF & Welko SPA, Siemens Pakistan, Areva T & D & Techno Ferrari spa)

 Power Generation, Co Generation & Utilities
o Feasibility, scheduling, civil work and installation of Power generation plant (9 MW) with co generation/Waste Heat Recovery using Hot water chiller (300 RT)
o Installation of air compressors, Energy efficient water & air distribution network, HVAC System
o Vendor’s supervision (Allied Engineering, AVS, KSB, Cogen consult, Alliance Engg., BEW)

Manager Electrical & Electronics في Shabbir Tiles & Ceramics Ltd ( A House of Habhi Group Company)
  • باكستان - كراتشي
  • أغسطس 2006 إلى ديسمبر 2007

1. To Plan and implement all electrical and instrumentation related functions.
2. Successfully completed a self power generation plant (4.5 MW) with 3x 3516C CAT gas Engines

Manager Electrical/Electronics في Renfro Crescent Pvt Ltd ( A Renfro Inc USA & Crescent Group joint venture)
  • باكستان - كراتشي
  • يناير 2005 إلى يوليو 2006

1. Plan, organize, execute and evaluate all electrical and utilities related activities and operations.
2. Projects lead and successfully completed include installation of Switch Gears, VFDs, 1 MW Gas engine, Gas Fired Absorption chiller and HVAC System, Air Compressors, Heat Recovery System, Lighting System, Waste Water R.O, CCTV installation, Emergency Exit system etc

Research Assistant في Assembly Assembly Lab, Institue of Production Engineering,TUT
  • فنلندا
  • يناير 2002 إلى يناير 2004

1. Electrical designing, PLC programming and HMI development of a high-speed mini storage (HSMS) for mini assembly factory.
2. Development of test applications for various parts of the mini assembly factory. (e.g. Robot Gripper, Vibratory feeder etc)

Instrumentation & Control Engineer في Disctech Media Pvt Limited
  • باكستان - كراتشي
  • أبريل 1999 إلى سبتمبر 2001

1. Installation, commissioning and maintenance of DCS based Compact disc (CD) manufacturing plants.
2. Troubleshooting of PCBs, motors and drives PLCs, pneumatic and hydraulic systems, sensors and other control instruments.

الخلفية التعليمية

ماجستير, Master of Science (Automation Engineering)
  • في Tampere University of Technology,
  • فبراير 2004
بكالوريوس, Industrial Electronics
  • في NED University of Engineering & Technology
  • ديسمبر 1998

اختبارات بيت.كوم

Management Skills Test
Score 72%

Specialties & Skills

Engineering Management
Project Management
Management
Plant Maintenance
Power Generation
Interpersonal and communication skills
Goal Setting
Organizational skills
Team Building
Project Management
Maintenance Management

اللغات

الانجليزية
متمرّس
الأوردو
متمرّس

العضويات

Pakistan Engineering Council
  • Member
  • July 1999
Alumini Tampere University of Technology,Finland
  • Member
  • March 2008

التدريب و الشهادات

• Implementation of Food Safety Management System & Food Safety Audit Method & Technique by IRNA (الشهادة)
تاريخ الدورة:
December 2012
صالحة لغاية:
January 9999
Project Management workshop for Executives, 35 PDU @ PMI (الشهادة)
تاريخ الدورة:
September 2012
صالحة لغاية:
January 9999
Mind Maps for Business by Tony Buzan (الشهادة)
تاريخ الدورة:
February 2013
صالحة لغاية:
January 9999
Leadership Grid (الشهادة)
تاريخ الدورة:
January 2009
صالحة لغاية:
January 9999
Total Productive Maintenance Facilitator from JMAC Inc, Japan (الشهادة)
تاريخ الدورة:
December 2013
صالحة لغاية:
January 9999
Seven Habits for Managers from Franklyn Covey (الشهادة)
تاريخ الدورة:
June 2013
صالحة لغاية:
January 9999

الهوايات

  • New technology and trends,sports and reading