Electrical Trainee Engineer
Rohri cement factory pvt limited
Total years of experience :3 years, 7 Months
• Testing of power transformers
• Work on different instruments ( ie. Capacitance and dissipation factor C&DF, Megger IR TEST, Transformer turn ratio TTR and Transformer resistance Test e.t.c.
• Relays testing With secondary injection current.
• Work on new installations of electrical equipment ie ( CT AND isolator) and also their test with primary injection current instrument.
• Electrical Power Control & Protective Devices
1.Work on Distribution system .
2.Grid station system and All knowledge about
equipments of grid station .
Thesis on hydro power plant in pakistan