Senior Electrical Designer (FRELANCE)
Technip Energies
Total years of experience :18 years, 4 Months
Eurenco project (pyrotechnic factory in Sorgues): modeling of cable trays and cablowires on Revit MEP 2021. Design and make layout thanks to various input data (cable lists, instruments, PID...) Pertamina project (manufacturing factory of plastic in Indonesia): production of layout plans for substations, lightning studies on AutoCAD and Revit 2022. ASTRAZENECA Dunkerque project (manufacturing plant): production of layout plans for terminals (Sockets and supplies), earth and lightning networks, MTO, single-line update. Making 3D Model with Revit MEP 2022 including all Electrical components and cables trays
OL Arena project and PBA low place Part Dieu. Implantation of terminals in the 3D model on Revit MEP. Realization of lighting calculation notes on Dialux EVO.
Realization of 3D model on Revit MEP. Modeling of cable trays, installation of terminals and production of execution plans and mock-ups for the site. Expansion project of the Paris metro line for the 2024 Olympic Games.
Project in Lyon (43 floors high-rise building, 5-star hotel) on Revit MEP. Installation of electrical and firefighting equipment, routing of electrical and firefighting cables, and fire safety cables trays. Coordination meetings participation
Making a 3D model on Revit MEP for the CIRI project: Extension of a laboratory. Modeling of cable trays, installation of terminals. Repeats following synthesis.
Making cabling layouts for the BOBST project (office building in Lyon) on Autocad. Implementation of terminals on EKLAA project (Lyon) on Revit MEP 2019, Making Revit families (Lighting fixtures, BMS automation systems, detectors, etc.)
Creation of electrical cabinet plans for tertiary projects, such as a retirement home and housing. (CHU St Laurent Dupont) Creation of a 3D Low Current Model on REVIT MEP for a DATACENTER project for the city of Marseille (MRS3 Interxion).
FIL (France Italy Link) project for the HT connection between France and Italy. Creation of power assessments, calculation notes on Caneco BT 2017, electrical diagrams, layout plans on Autocad and 3D paths on Revit 2017 in CFO (power outlets, lighting, etc.)
Projetc Strasbourg Hospital:
Studies of electrical power supply and control cabinets for Air Handling Units. Creation of diagrams on See Electrical Expert from list of GTB points, air flow diagrams and power balance. Creation of probe installation plans, junction boxes on Autocad, and calculation notes on Caneco.
Design all cable trays of a big clinic with Revit MEP software in 2D, and 3D
Drawing High voltage substations with AUTOCAD: electrical and civil drawings based to 3D scanning and drafts layouts. Realize layouts and sectional drawings. Making wiring diagrams between cubicles and cable list.
Making the synthesis of electricity, HVAC, plumb networks for Les Galets’s Tower.Lead meetings.
Design all cable trays of Lyon airport extension with Revit MEP software in 2D, and 3D.
Update civil shop drawings for water-treatment plan
Control MCC Panel drawings and follow-up the manufacture.
Draw High voltage substations with AUTOCAD: electrical and civil drawings based to 3D scanning and drafts layouts. Realize layouts and sectional drawings.
Control electrical diagrams, schemes, and electrical calculation notes, mechanical and civil documents for High Speed Train High Voltage Substations of Tours-Bordeaux.
➢ August to june 2013: ALSTOM GRID, AIX LES BAINS, France
SECOND ELECTRICAL MANAGER (FREELANCE)
Design electrical drawing for LCC of the Gas Insulated Switchgear for Arabic projects: Petrokemya (Saudi), Sonelgaz (SEEG) (Algeria)
Command of electrical devices. Follow-up manufacturing and equipment installation.
➢ March 2012 to June 2012: CNIM, LA SEINE SUR MER, France
ELECTRICAL DESIGNER (FREELANCE)
Design LCC diagrams and cable lists for waste incinerator for Lincoln (England) . Control electrical routing and cable tray of HV and LV electrical diagrams made by SCHNEIDER.
➢ May 2011 to February 2012: INEO GDF-SUEZ, PIERRELATTE, France
ELECTRICAL DESIGNER (FREELANCE)
Design electrical routing and cable tray for nuclear plant.
Design layout diagrams for cubicle implantation.
➢ October 2010 to January 2011: SNC LAVALIN, FONTENAY, France
SUPERVISOR
Electrical inspection in a power plant gas. Control of High Voltage installation
90KV/20KV. Control of all installations in LV DC/AC equipment's, HVAC, remote alarm
➢ June 2009 to December 2009: CEGELEC, CADARACHE, France
ELECTRICAL DESIGNER
Design of electrical routing and cable tray for nuclear installation. Follow-up of the manufacturing.
➢ May 2008 to October 2008: INEO, VILLEURBANNE, France
HV DESIGNER
Design of HV Substation (400KV, 225KV) for HS Train supply. Design of layout and sectional drawing.
➢ June 2007 to April 2008: CHLORIDE, LYON, France
ELECTRICAL DESIGNER
Electrical design and wiring diagrams of UPS Systems for chemical and petrochemical industries.
➢ December 2005 to May 2007: IESA, VIENNE, France
ELECTRICAL DESIGNER
Design of LCC, wiring diagrams, layouts of chemical and manufacturing plants. Check I/O list and creation of cable lists.
➢ December 2004 to May 2005: AREVA, VILLEURBANNE, France
HV DESIGNER
Design electrical drawings for DCS of Gas Insulated Switchgear for French project: RATP (Paris)
➢ April to 2004 to July 2004: IESA, VIENNE, France
ELECTRICAL DESIGNER
Design of LCC, wiring diagrams and layouts of chemical and manufacturing plants. Check I/O list and creation of cable lists.
➢ October 2002 to April 2003: CEGELEC, ST MAURICE DE BEYNOST, France
ELECTRICAL DESIGNER
Design of LCC, wiring diagrams, layouts of chemical and manufacturing plants.
➢ December 1998 to July 2000: IRIS BUS (RVI), ANNONAY
AUTOMOTIVE ELECTRICAL DESIGNER
Design of wiring harness in Bus (circuit routing, layouts, product follow-up)
ELECTRICAL BACHELOR
➢ Sep 1996 - Jun 1998: LET de VIENNE ISERE, France ELECTRICAL LEVEL A
➢ Sep 1994 - Jun 1996: LET DE VIENNE ISERE, France BACCALAUREAT