Arshad Zareen, inspector

Arshad Zareen

inspector

Pakistan Hydro Consultants

Location
Pakistan
Experience
23 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :23 years, 6 Months

inspector at Pakistan Hydro Consultants
  • September 2002 to June 2014

A) From Jan 1 2014 till To date
Employer; Associated Consulting Engineers ( ACE) Pvt Ltd
Location; Munda Headworks Charsadda ( Barrage Project)
Position Held; Junior Engineer
Client; Irrigation Deptt;
As a Junior engineer my duties and responsibilities are as under
➢ To follow up the construction activities of flood protection works along Khiali River i-e apron, stone pitching and embankment protection.
➢ To check the measurements for IPC on site
➢ To check the various activities of bridge i-e piling, stressing and launching
➢ To check the barrage activities i-e glacis repair, cell beam level gates
➢ To check all the road and colony activities according to drawings
➢ To plan the site activities according the schedule.


B) From June 27, 2011 To March 31, 2014
Employer; Venco Imtiaz Construction Company ( VICC)
Location; KHPP Durai Helmand, Afghanistan
Position Held; Construction Manager
Client; USAID ( B&V Prime contractor)
As a Construction Manager my duties and responsibilities are as under
➢ To follow up construction activities of mobilization camp for site staff
➢ To attend meetings with client in B&V camp and preparation of minutes of meeting.
➢ To follow up design issues of Switch Yard and control Building with the design team
➢ To coordinate with central office in Kabul and updating of site progress
➢ To check and verify IPC (invoices) of sub-contractor.
➢ To plan the site activities according the schedule.


C) From Nov 20, 2010 to June 26, 2011
Employer; engineering and logistic Areebel
Location; Maywand Kandahar, Afghanistan
Position Held; Construction Manager
Client; US army
As a Construction Manager my duties and responsibilities are as under
➢ To follow up construction activities of mobilization camp for site staff
➢ To attend meetings with client in KAF (Kandahar air field) and preparation of minutes of meeting.
➢ To follow up design issues of Fire Station & Waste Management in Maywand FOB
➢ To coordinate with central office in Kabul and head office in America.
➢ To supervise the steel structure building i-e waste water management plant.
➢ Supervise the fuel station.

D) From August 10, 2009 To Oct 31, 2011
Employer; ASK (JV)
Location; Bamian Province, Afghanistan

Junior Engineer at Associated Consulting Engineers
  • United Arab Emirates
  • January 2014 to June 2014

A) From Jan 1 2014 till To date
Employer; Associated Consulting Engineers ( ACE) Pvt Ltd
Location; Munda Headworks Charsadda ( Barrage Project)

Munda Head Works at Charsadda
  • January 2014 to June 2014

1 Munda Head Works Charsadda 2014 J.E Construction supervision continue

at KHPP Durai Helmand, Afghanistan
  • January 2011 to June 2014

2 KHPP Durai Helmand, Afghanistan Afghanistan 2011-14 C.M supervision 21 months

Construction Manager at Venco Imtiaz Construction Company
  • June 2011 to March 2014

B) From June 27, 2011 To March 31, 2014
Employer; Venco Imtiaz Construction Company ( VICC)
Location; KHPP Durai Helmand, Afghanistan
Position Held; Construction Manager
Client; USAID ( B&V Prime contractor)
As a Construction Manager my duties and responsibilities are as under
➢ To follow up construction activities of mobilization camp for site staff
➢ To attend meetings with client in B&V camp and preparation of minutes of meeting.
➢ To follow up design issues of Switch Yard and control Building with the design team
➢ To coordinate with central office in Kabul and updating of site progress
➢ To check and verify IPC (invoices) of sub-contractor.
➢ To plan the site activities according the schedule.

at Maywand FOB
  • January 2011 to December 2011

3 FS & WM project Maywand FOB 2011 C.M Construction supervision 6 months

Project Manager (ROAD Project) at ASK
  • Afghanistan
  • August 2009 to October 2011

D) From August 10, 2009 To Oct 31, 2011
Employer; ASK (JV)
Location; Bamian Province, Afghanistan
Position Held; Project Manager (ROAD Project)
Client; PRT US army

As a project Manager my duties and responsibilities are as under ➢ To manage cut fill according to design and coordinate with client.
➢ Meeting with client, preparation of meeting agenda and preparation of minutes of meeting.
➢ Preparation of invoices of work done and to pursue all issues regarding invoices
➢ Checking of sub contractor IPC (interim payment certificate)
➢ To execute work according to schedule and manage all machinery where required.
➢ Checking all activities i-e earth work, sub base, base coarse, culverts, bridges causeway and retaining walls.

Construction Manager at engineering and logistic Areebel
  • Afghanistan
  • November 2010 to June 2011

A) From Jan 1 2014 till To date
Employer; Associated Consulting Engineers ( ACE) Pvt Ltd
Location; Munda Headworks Charsadda ( Barrage Project)

Project manager at Bamian
  • January 2009 to January 2011

4 PRT road project Bamian 2009-2011 Project manager Supervision 15 months

at Ghazi Barotha Power Channel
  • January 2010 to December 2010

10 Ghazi Barotha Power Channel Ghazi Barotha 2002 -Do- -Do- 1 Year 10 Months

at ANA Base Mazar Afghanistan
  • January 2009 to December 2009

5 ANA Base Mazar Afghanistan Mazar-e-Sharif 2009 C.Manager Full Supervision 6 Month

Construction Manager at BKBMC
  • January 2009 to July 2009

E) From jan 15, 2009 to July 31, 2009
Employer: BKBMC (Pvt.) Ltd.
Location: Mazare sharief, Afghanistan
Position Held Construction Manager

As a construction manager my duties and responsibilities are as under
➢ Lay out and excavation of all buildings i.e. DFAC, vehicle maintenance building FSD buildings, Medical Barracks & Fuel Stations etc.
➢ Preparation of bar bending schedule and concrete arrangement etc.
➢ Preparation of IPC (invoices) for different buildings and checking of invoices of sub contractors.
➢ Supervision of steel structure building i-e vehicle maintenance building.
➢ Arrangement for roof trusses, GI corrugated sheets etc.

approval for concrete and other activities from consultant at Taking
  • April 2008 to January 2009
Allama Iqbal Faculty of Arts at Kabul
  • January 2008 to December 2008

6 Allama Iqbal Faculty of Arts Kabul 2008 Site Inspector -Do- 1 Year

Junior Officer at Askari Cement Limited
  • Pakistan
  • August 2005 to April 2008

G) From August 2005 to April 09, 2008
Employer: Askari Cement Limited, Wah.
Location: Askari Cement Limited, Wah.
Position Held: Junior Officer

➢ Refractory lining work and cast able work at rotary Kiln and preheated tower (inlet chamber, down pipes, cooler burner gun, nose ring plates, kiln hood, cyclones, riser pipes and hot air duct)
➢ Repair and maintenance of housing colony and work area.
➢ Painting of housing colony and ancillary buildings.
➢ Monthly stock-taking of material.
➢ Repair work bituminous roads inside & outside plant area.
➢ Construction of fuel station.
➢ Construction and supervision of new building which are approved in capital budget.
➢ Preparing of tender documents, contracts, specification and technical estimate sheets.
➢ Checking of contractor bills, working at site.

at Askari Cement Ltd
  • Pakistan
  • January 2005 to January 2008

7 Askari Cement Ltd, Wah Wah, Rawalpindi 2005-2008 JO Civil -Do- 3 Year

Site Inspector at NESPAK
  • Oman
  • March 2004 to July 2005

H) From March 2004 to July 2005
Employer: NESPAK (Pvt.) Ltd.
Location: Sharki Dam Project, Distt Karak
Position Held: Site Inspector


DESCRIPTION OF DUTIES:
As a Site Inspector, I was responsible for the construction supervision of main dam, spillway, irrigation channel and all related structures of the project. I was also responsible for the concrete supervision and its related tests. I have close coordination with Resident Engineer and discuss the site problems on daily basis. I was also responsible to help the Resident Engineer while verification of IPC and preparation of Monthly Progress Report.

Site Inspector at Sharki Dam
  • January 2004 to January 2005

8 Sharki Dam Karak 2004-2005 Site Inspector -Do- 1 Year 4 Months

Site Inspector at NESPAK
  • Oman
  • September 2002 to February 2004

I) September 2002 to Feb, 2004
Employer: NESPAK (Pvt.) Ltd.
Location: Ghazi Brotha Hydro Power Project, Power Channel
Position Held: Site Inspector

at Ghazi Barotha Power Channel
  • January 2002 to January 2004

9 Ghazi Barotha Power Channel Ghazi Barotha 2002-2004 -Do- -Do- 1 Year 6 Months

Site Inspector at NESPAK
  • Oman
  • November 2000 to August 2002

J) November 2000 to August 2002
Employer: NESPAK (Pvt.) Ltd.
Location: Ghazi Barotha Hydropower Project
Power Complex Barotha
Position Held: Site Inspector

As Site Inspector supervised the construction of concrete structures i.e. Tail regulator, North Sill, South Sill and Switch Yard. Responsibilities include.

➢ Supervision of construction of foundations, piers, abutments & deck slabs.
➢ Construction of pre-cast girder slabs.
➢ Pre-tensioning and post tensioning of girder and slabs.
➢ Construction of tower foundations for switch yard.
➢ Construction of cable trenches for control building.

at Rural Access Roads Project
  • Pakistan
  • January 1998 to December 2000

11 Rural Access Roads Project Peshawar 1998-2000 -Do- -Do- 2 Year 7 Months

Site Inspector at NESPAK
  • Pakistan
  • April 1998 to October 2000

K) April 1998 to October 2000
Employer: NESPAK (Pvt.) Ltd.
Location: Rural Access Roads Project Peshawar
Position Held: Site Inspector

As a Site Inspector supervised the construction of roads. Responsibilities included the supervision of:
➢ Preparation of sub grades.
➢ Construction of roads and asphalt works.
➢ Construction of culverts, causeways and retaining walls.
➢ Testing of road material.
➢ Verification of IPC's submitted by contractor.
➢ Construction of bridge foundations such as piling.
➢ Pre-stressing of girders.
➢ Launching of girders.

Site Inspector at NESPAK
  • Pakistan
  • December 1997 to March 1998

L) December 1997 to March 1998
Employer: NESPAK (Pvt.) Ltd.
Location: MCL Road Project Lahore
Position Held: Site Inspector

As a Site Inspector supervised the construction of MCL road projects in Lahore. Responsibilities included the supervision of following activities.

➢ Widening of roads.
➢ Asphalt work and construction of drainage and sewerage works.
➢ Verification of Contractor's bills.

at MCL Roads Project
  • Pakistan
  • January 1997 to January 1998

12 MCL Roads Project Lahore 1997-1998 -Do- -Do- 4 Months

Site Inspector at NESPAK
  • Oman
  • August 1996 to November 1997

A) From Jan 1 2014 till To date
Employer; Associated Consulting Engineers ( ACE) Pvt Ltd
Location; Munda Headworks Charsadda ( Barrage Project)
Position Held; Junior Engineer
Client; Irrigation Deptt;
As a Junior engineer my duties and responsibilities are as under
➢ To follow up the construction activities of flood protection works along Khiali River i-e apron, stone pitching and embankment protection.
➢ To check the measurements for IPC on site
➢ To check the various activities of bridge i-e piling, stressing and launching
➢ To check the barrage activities i-e glacis repair, cell beam level gates
➢ To check all the road and colony activities according to drawings
➢ To plan the site activities according the schedule.


B) From June 27, 2011 To March 31, 2014
Employer; Venco Imtiaz Construction Company ( VICC)
Location; KHPP Durai Helmand, Afghanistan
Position Held; Construction Manager
Client; USAID ( B&V Prime contractor)
As a Construction Manager my duties and responsibilities are as under
➢ To follow up construction activities of mobilization camp for site staff
➢ To attend meetings with client in B&V camp and preparation of minutes of meeting.
➢ To follow up design issues of Switch Yard and control Building with the design team
➢ To coordinate with central office in Kabul and updating of site progress
➢ To check and verify IPC (invoices) of sub-contractor.
➢ To plan the site activities according the schedule.


C) From Nov 20, 2010 to June 26, 2011
Employer; engineering and logistic Areebel
Location; Maywand Kandahar, Afghanistan
Position Held; Construction Manager
Client; US army
As a Construction Manager my duties and responsibilities are as under
➢ To follow up construction activities of mobilization camp for site staff
➢ To attend meetings with client in KAF (Kandahar air field) and preparation of minutes of meeting.
➢ To follow up design issues of Fire Station & Waste Management in Maywand FOB
➢ To coordinate with central office in Kabul and head office in America.
➢ To supervise the steel structure building i-e waste water management plant.
➢ Supervise the fuel station.

D) From August 10, 2009 To Oct 31, 2011
Employer; ASK (JV)
Location; Bamian Province, Afghanistan

at D.G.Khan
  • January 1996 to January 1997

13 N 70 Bridge Project D.G.Khan 1996-1997 -Do- -Do- 1 Year 4 Months

Site Inspector at NESPAK (Pvt.) Ltd
  • June 1995 to July 1996

N) June 16, 1995 to July, 1996
Employer: NESPAK (Pvt.) Ltd.
Location: Mohmand Area Development Project for roads.
Position Held: Site Inspector

As a Site Inspector supervised the construction of various road projects in Mohmand Agency Areas. Supervised the following activities.

➢ Cleaning & Grubbing
➢ Preparation of embankments layers.
➢ Preparation of sub grades for roads.
➢ Construction of road involving placing of sub base, aggregate base course and asphalt works.
➢ Testing of road material for quality control.
➢ Construction of drainage structures such as culverts and causeways.

Mohmand Area Development Project for Roads at Mohmand Agency
  • January 1995 to January 1996

14 Mohmand Area Development Project for Roads Mohmand Agency 1995-1996 -Do- -Do- 1 Year 2 Months

Site Inspector at NESPAK
  • Oman
  • October 1993 to June 1995

A) From Jan 1 2014 till To date
Employer; Associated Consulting Engineers ( ACE) Pvt Ltd
Location; Munda Headworks Charsadda ( Barrage Project)
Position Held; Junior Engineer
Client; Irrigation Deptt;
As a Junior engineer my duties and responsibilities are as under
➢ To follow up the construction activities of flood protection works along Khiali River i-e apron, stone pitching and embankment protection.
➢ To check the measurements for IPC on site
➢ To check the various activities of bridge i-e piling, stressing and launching
➢ To check the barrage activities i-e glacis repair, cell beam level gates
➢ To check all the road and colony activities according to drawings
➢ To plan the site activities according the schedule.


B) From June 27, 2011 To March 31, 2014
Employer; Venco Imtiaz Construction Company ( VICC)
Location; KHPP Durai Helmand, Afghanistan
Position Held; Construction Manager
Client; USAID ( B&V Prime contractor)
As a Construction Manager my duties and responsibilities are as under
➢ To follow up construction activities of mobilization camp for site staff
➢ To attend meetings with client in B&V camp and preparation of minutes of meeting.
➢ To follow up design issues of Switch Yard and control Building with the design team
➢ To coordinate with central office in Kabul and updating of site progress
➢ To check and verify IPC (invoices) of sub-contractor.
➢ To plan the site activities according the schedule.


C) From Nov 20, 2010 to June 26, 2011
Employer; engineering and logistic Areebel
Location; Maywand Kandahar, Afghanistan
Position Held; Construction Manager
Client; US army
As a Construction Manager my duties and responsibilities are as under
➢ To follow up construction activities of mobilization camp for site staff
➢ To attend meetings with client in KAF (Kandahar air field) and preparation of minutes of meeting.
➢ To follow up design issues of Fire Station & Waste Management in Maywand FOB
➢ To coordinate with central office in Kabul and head office in America.
➢ To supervise the steel structure building i-e waste water management plant.
➢ Supervise the fuel station.

D) From August 10, 2009 To Oct 31, 2011
Employer; ASK (JV)
Location; Bamian Province, Afghanistan

at Form to Market Roads Project
  • January 1993 to January 1995

15 Form to Market Roads Project Swat 1993-1995 -Do- -Do- 1 Year 9 Months

Site Supervisor at MMB
  • December 1992 to June 1993

P) December 1992 to June 1993
Employer: MMB (Pvt.) Ltd.
Location: Construction of Harro Bridge
Position Held: Site Supervisor

As Site Supervisor, supervised the construction of Harro Bridge involving the following activities.

➢ Launching of Girders.
➢ Construction of deck slab and diaphragm.
➢ Construction of Walkways, Parapet Wall.

at GT Road Larnespur
  • January 1992 to January 1993

16 Haro Bridge GT Road Larnespur 1992-1993 -Do- -Do- 7 Months

Site Supervisor at M/S Gammon Pakistan Ltd
  • Pakistan
  • June 1991 to November 1992

Q) June 1991 to November 1992
Employer: M/S Gammon Pakistan Ltd.
Location: Extension of AC Wah Factory
Position Held: Site Supervisor

As Site Supevisor, supervised the extension works of Wah Cement Factory. Activities involved.

➢ Construction of pre-heating building and clinker building.
➢ Construction of clay crusher building and its conveyor belt foundations.
➢ Installation of Conveyor Belt.
➢ Construction of RCC Works.

at Extension of AC Wah Cement Factory
  • Pakistan
  • January 1991 to January 1992

17 Extension of AC Wah Cement Factory Wah, Rawalpindi 1991-1992 -Do- -Do- 1 Year 6 Months

at Power Reactor Project
  • January 1991 to December 1991

18 Power Reactor Project Khushab (Joharabad) 1991 -Do- -Do- 5 Months

Site Supervisor at Power Reactor Building
  • January 1991 to May 1991

R) January 1991 to May 1991
Employer: M/S NCL.
Location: PR-100 (Power Reactor Building)
Position Held: Site Supervisor

As Site Supevisor, supervised the construction of Power Reactor Building (PR-100 Project) . Activities involved.

➢ Construction of RCC Works.
➢ Finishing works such as flouring brick masonry and plastering etc.
DETAILED TASKS ASSIGNED
S/No Project Name Location Year Position Held. Duties Rendered Time Spent

Junior Engineer at Irrigation Deptt
  • to

Position Held; Junior Engineer
Client; Irrigation Deptt;
As a Junior engineer my duties and responsibilities are as under
➢ To follow up the construction activities of flood protection works along Khiali River i-e apron, stone pitching and embankment protection.
➢ To check the measurements for IPC on site
➢ To check the various activities of bridge i-e piling, stressing and launching
➢ To check the barrage activities i-e glacis repair, cell beam level gates
➢ To check all the road and colony activities according to drawings
➢ To plan the site activities according the schedule.

Junior Engineer at US army
  • Kuwait
  • to

Position Held; Junior Engineer
Client; Irrigation Deptt;
As a Junior engineer my duties and responsibilities are as under
➢ To follow up the construction activities of flood protection works along Khiali River i-e apron, stone pitching and embankment protection.
➢ To check the measurements for IPC on site
➢ To check the various activities of bridge i-e piling, stressing and launching
➢ To check the barrage activities i-e glacis repair, cell beam level gates
➢ To check all the road and colony activities according to drawings
➢ To plan the site activities according the schedule.


B) From June 27, 2011 To March 31, 2014
Employer; Venco Imtiaz Construction Company ( VICC)
Location; KHPP Durai Helmand, Afghanistan
Position Held; Construction Manager
Client; USAID ( B&V Prime contractor)
As a Construction Manager my duties and responsibilities are as under
➢ To follow up construction activities of mobilization camp for site staff
➢ To attend meetings with client in B&V camp and preparation of minutes of meeting.
➢ To follow up design issues of Switch Yard and control Building with the design team
➢ To coordinate with central office in Kabul and updating of site progress
➢ To check and verify IPC (invoices) of sub-contractor.
➢ To plan the site activities according the schedule.


C) From Nov 20, 2010 to June 26, 2011
Employer; engineering and logistic Areebel
Location; Maywand Kandahar, Afghanistan
Position Held; Construction Manager
Client; US army
As a Construction Manager my duties and responsibilities are as under
➢ To follow up construction activities of mobilization camp for site staff
➢ To attend meetings with client in KAF (Kandahar air field) and preparation of minutes of meeting.
➢ To follow up design issues of Fire Station & Waste Management in Maywand FOB
➢ To coordinate with central office in Kabul and head office in America.
➢ To supervise the steel structure building i-e waste water management plant.
➢ Supervise the fuel station.

Project Manager (ROAD Project) at Railway Bridge
  • India
  • to

Position Held; Project Manager (ROAD Project)
Client; PRT US army

As a project Manager my duties and responsibilities are as under ➢ To manage cut fill according to design and coordinate with client.
➢ Meeting with client, preparation of meeting agenda and preparation of minutes of meeting.
➢ Preparation of invoices of work done and to pursue all issues regarding invoices
➢ Checking of sub contractor IPC (interim payment certificate)
➢ To execute work according to schedule and manage all machinery where required.
➢ Checking all activities i-e earth work, sub base, base coarse, culverts, bridges causeway and retaining walls.
E) From jan 15, 2009 to July 31, 2009
Employer: BKBMC (Pvt.) Ltd.
Location: Mazare sharief, Afghanistan
Position Held Construction Manager

As a construction manager my duties and responsibilities are as under
➢ Lay out and excavation of all buildings i.e. DFAC, vehicle maintenance building FSD buildings, Medical Barracks & Fuel Stations etc.
➢ Preparation of bar bending schedule and concrete arrangement etc.
➢ Preparation of IPC (invoices) for different buildings and checking of invoices of sub contractors.
➢ Supervision of steel structure building i-e vehicle maintenance building.
➢ Arrangement for roof trusses, GI corrugated sheets etc.
➢ Taking approval for concrete and other activities from consultant VIAP.
F) From April 12, 2008 to Jan 12, 2009
Employer: NESPAK (Pvt.) Ltd.
Location: Kabul, Afghanistan
Position Held: Site Inspector
As Site Inspector supervised the construction of Allama Iqbal Faculty of Arts at Kabul University, Afghanistan. Responsibilities include.

➢ To check the layout of building according to drawings
➢ Supervision and control of building structures like R.C.C columns, beams and slabs etc
➢ Checking of bars bending schedule
➢ Supervision and control of Formwork, steel work, Brick Masonry and Plaster etc.
➢ Checking and supervision of all finishing items i.e. Terrazzo floors, Marble, Dado skirting, paint work and external Texture coating etc.
➢ Supervision of water proofing items of building top slab surfaces.
➢ Checking of Contractor's Interim Payment Certificates for payment against work done at site.
➢ Preparation of daily progress reports In coordination with Regional Manager Discussion of site activities and correspondences with contractor's representative.

G) From August 2005 to April 09, 2008
Employer: Askari Cement Limited, Wah.
Location: Askari Cement Limited, Wah.
Position Held: Junior Officer

➢ Refractory lining work and cast able work at rotary Kiln and preheated tower (inlet chamber, down pipes, cooler burner gun, nose ring plates, kiln hood, cyclones, riser pipes and hot air duct)
➢ Repair and maintenance of housing colony and work area.
➢ Painting of housing colony and ancillary buildings.
➢ Monthly stock-taking of material.
➢ Repair work bituminous roads inside & outside plant area.
➢ Construction of fuel station.
➢ Construction and supervision of new building which are approved in capital budget.
➢ Preparing of tender documents, contracts, specification and technical estimate sheets.
➢ Checking of contractor bills, working at site.
H) From March 2004 to July 2005
Employer: NESPAK (Pvt.) Ltd.
Location: Sharki Dam Project, Distt Karak
Position Held: Site Inspector


DESCRIPTION OF DUTIES:
As a Site Inspector, I was responsible for the construction supervision of main dam, spillway, irrigation channel and all related structures of the project. I was also responsible for the concrete supervision and its related tests. I have close coordination with Resident Engineer and discuss the site problems on daily basis. I was also responsible to help the Resident Engineer while verification of IPC and preparation of Monthly Progress Report.


I) September 2002 to Feb, 2004
Employer: NESPAK (Pvt.) Ltd.
Location: Ghazi Brotha Hydro Power Project, Power Channel
Position Held: Site Inspector

Since September 2002 is working on secondment with Pakistan Hydro Consultants (PHC) a consortium of Pakistan and International Consultants i.e. NESPAK, ACE, HARZA (USA) Bennie & Partners (UK) and Ewbank Prece (USA) responsible for the design and supervision of $ 2.50 Billion, 1450 MW Ghazi Barotha Hydropower Project (GHBP), comprising a Barrage a 52 Km long RCC lined power channel and power complex, As inspector Civil is responsible for the construction of super passages, road bridges, culverts, inlets, escapes, railway bridge, repair works 52 Km long concrete lining.

Responsibilities include:
➢ Construction of Super passages, Road Bridges, Culverts, Inlet, Escapes and Railway Bridge.
➢ Casting of Bridge beams, of 33.0 m length. Their post tensioning by latest technology of Tensacciai, grouting and finally launching on the bridges.
➢ The match casting of the pre-cast super passage segments, their launching with high technical and sophisticated STAC system, post tensioning with, Tensacciai technology and finally their grouting.
➢ Maintaining the quality of concrete from its batching to its placing into the forms. After placing, it's curing with approved specified methods up till the required time.
➢ The quality control on steel right from its physical and chemical testing to its proper fixing at site.
➢ Solution of different technical problems occurring at site.
➢ Calculation of pre-stressing results obtained during the post tensioning of the bridge beams, deck slabs and super passage flume.
➢ The verification of IPC submitted by the contractor for payment.
➢ Coordination between the site and the office.
➢ Construction of Crumb Weir and Labyrinth type escape structures for excess discharge for the channel.
➢ Supervision of repair works for 52Km long time of the Power Channel.
➢ Supervision of steel structure Railway Bridge at km 47.
➢ As team member supervised the monitoring of vertical & inclined pezometres for ground water level.
➢ Monitored the discharges and velocity of flows into the channel.
➢ Regular reading of staff gauges installed at different locations of the Power Channel.

Project Manager (ROAD Project) at D.G. Khan to Loralai
  • India
  • to

Position Held; Project Manager (ROAD Project)
Client; PRT US army

As a project Manager my duties and responsibilities are as under ➢ To manage cut fill according to design and coordinate with client.
➢ Meeting with client, preparation of meeting agenda and preparation of minutes of meeting.
➢ Preparation of invoices of work done and to pursue all issues regarding invoices
➢ Checking of sub contractor IPC (interim payment certificate)
➢ To execute work according to schedule and manage all machinery where required.
➢ Checking all activities i-e earth work, sub base, base coarse, culverts, bridges causeway and retaining walls.
E) From jan 15, 2009 to July 31, 2009
Employer: BKBMC (Pvt.) Ltd.
Location: Mazare sharief, Afghanistan
Position Held Construction Manager

As a construction manager my duties and responsibilities are as under
➢ Lay out and excavation of all buildings i.e. DFAC, vehicle maintenance building FSD buildings, Medical Barracks & Fuel Stations etc.
➢ Preparation of bar bending schedule and concrete arrangement etc.
➢ Preparation of IPC (invoices) for different buildings and checking of invoices of sub contractors.
➢ Supervision of steel structure building i-e vehicle maintenance building.
➢ Arrangement for roof trusses, GI corrugated sheets etc.
➢ Taking approval for concrete and other activities from consultant VIAP.
F) From April 12, 2008 to Jan 12, 2009
Employer: NESPAK (Pvt.) Ltd.
Location: Kabul, Afghanistan
Position Held: Site Inspector
As Site Inspector supervised the construction of Allama Iqbal Faculty of Arts at Kabul University, Afghanistan. Responsibilities include.

➢ To check the layout of building according to drawings
➢ Supervision and control of building structures like R.C.C columns, beams and slabs etc
➢ Checking of bars bending schedule
➢ Supervision and control of Formwork, steel work, Brick Masonry and Plaster etc.
➢ Checking and supervision of all finishing items i.e. Terrazzo floors, Marble, Dado skirting, paint work and external Texture coating etc.
➢ Supervision of water proofing items of building top slab surfaces.
➢ Checking of Contractor's Interim Payment Certificates for payment against work done at site.
➢ Preparation of daily progress reports In coordination with Regional Manager Discussion of site activities and correspondences with contractor's representative.

G) From August 2005 to April 09, 2008
Employer: Askari Cement Limited, Wah.
Location: Askari Cement Limited, Wah.
Position Held: Junior Officer

➢ Refractory lining work and cast able work at rotary Kiln and preheated tower (inlet chamber, down pipes, cooler burner gun, nose ring plates, kiln hood, cyclones, riser pipes and hot air duct)
➢ Repair and maintenance of housing colony and work area.
➢ Painting of housing colony and ancillary buildings.
➢ Monthly stock-taking of material.
➢ Repair work bituminous roads inside & outside plant area.
➢ Construction of fuel station.
➢ Construction and supervision of new building which are approved in capital budget.
➢ Preparing of tender documents, contracts, specification and technical estimate sheets.
➢ Checking of contractor bills, working at site.
H) From March 2004 to July 2005
Employer: NESPAK (Pvt.) Ltd.
Location: Sharki Dam Project, Distt Karak
Position Held: Site Inspector


DESCRIPTION OF DUTIES:
As a Site Inspector, I was responsible for the construction supervision of main dam, spillway, irrigation channel and all related structures of the project. I was also responsible for the concrete supervision and its related tests. I have close coordination with Resident Engineer and discuss the site problems on daily basis. I was also responsible to help the Resident Engineer while verification of IPC and preparation of Monthly Progress Report.


I) September 2002 to Feb, 2004
Employer: NESPAK (Pvt.) Ltd.
Location: Ghazi Brotha Hydro Power Project, Power Channel
Position Held: Site Inspector

Since September 2002 is working on secondment with Pakistan Hydro Consultants (PHC) a consortium of Pakistan and International Consultants i.e. NESPAK, ACE, HARZA (USA) Bennie & Partners (UK) and Ewbank Prece (USA) responsible for the design and supervision of $ 2.50 Billion, 1450 MW Ghazi Barotha Hydropower Project (GHBP), comprising a Barrage a 52 Km long RCC lined power channel and power complex, As inspector Civil is responsible for the construction of super passages, road bridges, culverts, inlets, escapes, railway bridge, repair works 52 Km long concrete lining.

Responsibilities include:
➢ Construction of Super passages, Road Bridges, Culverts, Inlet, Escapes and Railway Bridge.
➢ Casting of Bridge beams, of 33.0 m length. Their post tensioning by latest technology of Tensacciai, grouting and finally launching on the bridges.
➢ The match casting of the pre-cast super passage segments, their launching with high technical and sophisticated STAC system, post tensioning with, Tensacciai technology and finally their grouting.
➢ Maintaining the quality of concrete from its batching to its placing into the forms. After placing, it's curing with approved specified methods up till the required time.
➢ The quality control on steel right from its physical and chemical testing to its proper fixing at site.
➢ Solution of different technical problems occurring at site.
➢ Calculation of pre-stressing results obtained during the post tensioning of the bridge beams, deck slabs and super passage flume.
➢ The verification of IPC submitted by the contractor for payment.
➢ Coordination between the site and the office.
➢ Construction of Crumb Weir and Labyrinth type escape structures for excess discharge for the channel.
➢ Supervision of repair works for 52Km long time of the Power Channel.
➢ Supervision of steel structure Railway Bridge at km 47.
➢ As team member supervised the monitoring of vertical & inclined pezometres for ground water level.
➢ Monitored the discharges and velocity of flows into the channel.
➢ Regular reading of staff gauges installed at different locations of the Power Channel.

J) November 2000 to August 2002
Employer: NESPAK (Pvt.) Ltd.
Location: Ghazi Barotha Hydropower Project
Power Complex Barotha
Position Held: Site Inspector

As Site Inspector supervised the construction of concrete structures i.e. Tail regulator, North Sill, South Sill and Switch Yard. Responsibilities include.

➢ Supervision of construction of foundations, piers, abutments & deck slabs.
➢ Construction of pre-cast girder slabs.
➢ Pre-tensioning and post tensioning of girder and slabs.
➢ Construction of tower foundations for switch yard.
➢ Construction of cable trenches for control building.


K) April 1998 to October 2000
Employer: NESPAK (Pvt.) Ltd.
Location: Rural Access Roads Project Peshawar
Position Held: Site Inspector

As a Site Inspector supervised the construction of roads. Responsibilities included the supervision of:
➢ Preparation of sub grades.
➢ Construction of roads and asphalt works.
➢ Construction of culverts, causeways and retaining walls.
➢ Testing of road material.
➢ Verification of IPC's submitted by contractor.
➢ Construction of bridge foundations such as piling.
➢ Pre-stressing of girders.
➢ Launching of girders.


L) December 1997 to March 1998
Employer: NESPAK (Pvt.) Ltd.
Location: MCL Road Project Lahore
Position Held: Site Inspector

As a Site Inspector supervised the construction of MCL road projects in Lahore. Responsibilities included the supervision of following activities.

➢ Widening of roads.
➢ Asphalt work and construction of drainage and sewerage works.
➢ Verification of Contractor's bills.

M) August 1996 to November 1997
Employer: NESPAK (Pvt.) Ltd.
Location: N 70 Bridges Project D.G.Khan
Position Held: Site Inspector

As a Site Inspector supervised the construction of bridges at D.G. Khan to Loralai road project. Responsibilities included the supervision of following activities.

➢ Construction of piles.
➢ Construction of pre-stress girders.
➢ Stressing of girders.
➢ Launching of girders.
➢ Construction of deck slab.
➢ Construction of Access roads to bridges.
➢ Construction of Box Culverts.

Project Manager (ROAD Project) at Market Roads in Swat
  • India
  • to

Position Held; Project Manager (ROAD Project)
Client; PRT US army

As a project Manager my duties and responsibilities are as under ➢ To manage cut fill according to design and coordinate with client.
➢ Meeting with client, preparation of meeting agenda and preparation of minutes of meeting.
➢ Preparation of invoices of work done and to pursue all issues regarding invoices
➢ Checking of sub contractor IPC (interim payment certificate)
➢ To execute work according to schedule and manage all machinery where required.
➢ Checking all activities i-e earth work, sub base, base coarse, culverts, bridges causeway and retaining walls.
E) From jan 15, 2009 to July 31, 2009
Employer: BKBMC (Pvt.) Ltd.
Location: Mazare sharief, Afghanistan
Position Held Construction Manager

As a construction manager my duties and responsibilities are as under
➢ Lay out and excavation of all buildings i.e. DFAC, vehicle maintenance building FSD buildings, Medical Barracks & Fuel Stations etc.
➢ Preparation of bar bending schedule and concrete arrangement etc.
➢ Preparation of IPC (invoices) for different buildings and checking of invoices of sub contractors.
➢ Supervision of steel structure building i-e vehicle maintenance building.
➢ Arrangement for roof trusses, GI corrugated sheets etc.
➢ Taking approval for concrete and other activities from consultant VIAP.
F) From April 12, 2008 to Jan 12, 2009
Employer: NESPAK (Pvt.) Ltd.
Location: Kabul, Afghanistan
Position Held: Site Inspector
As Site Inspector supervised the construction of Allama Iqbal Faculty of Arts at Kabul University, Afghanistan. Responsibilities include.

➢ To check the layout of building according to drawings
➢ Supervision and control of building structures like R.C.C columns, beams and slabs etc
➢ Checking of bars bending schedule
➢ Supervision and control of Formwork, steel work, Brick Masonry and Plaster etc.
➢ Checking and supervision of all finishing items i.e. Terrazzo floors, Marble, Dado skirting, paint work and external Texture coating etc.
➢ Supervision of water proofing items of building top slab surfaces.
➢ Checking of Contractor's Interim Payment Certificates for payment against work done at site.
➢ Preparation of daily progress reports In coordination with Regional Manager Discussion of site activities and correspondences with contractor's representative.

G) From August 2005 to April 09, 2008
Employer: Askari Cement Limited, Wah.
Location: Askari Cement Limited, Wah.
Position Held: Junior Officer

➢ Refractory lining work and cast able work at rotary Kiln and preheated tower (inlet chamber, down pipes, cooler burner gun, nose ring plates, kiln hood, cyclones, riser pipes and hot air duct)
➢ Repair and maintenance of housing colony and work area.
➢ Painting of housing colony and ancillary buildings.
➢ Monthly stock-taking of material.
➢ Repair work bituminous roads inside & outside plant area.
➢ Construction of fuel station.
➢ Construction and supervision of new building which are approved in capital budget.
➢ Preparing of tender documents, contracts, specification and technical estimate sheets.
➢ Checking of contractor bills, working at site.
H) From March 2004 to July 2005
Employer: NESPAK (Pvt.) Ltd.
Location: Sharki Dam Project, Distt Karak
Position Held: Site Inspector


DESCRIPTION OF DUTIES:
As a Site Inspector, I was responsible for the construction supervision of main dam, spillway, irrigation channel and all related structures of the project. I was also responsible for the concrete supervision and its related tests. I have close coordination with Resident Engineer and discuss the site problems on daily basis. I was also responsible to help the Resident Engineer while verification of IPC and preparation of Monthly Progress Report.


I) September 2002 to Feb, 2004
Employer: NESPAK (Pvt.) Ltd.
Location: Ghazi Brotha Hydro Power Project, Power Channel
Position Held: Site Inspector

Since September 2002 is working on secondment with Pakistan Hydro Consultants (PHC) a consortium of Pakistan and International Consultants i.e. NESPAK, ACE, HARZA (USA) Bennie & Partners (UK) and Ewbank Prece (USA) responsible for the design and supervision of $ 2.50 Billion, 1450 MW Ghazi Barotha Hydropower Project (GHBP), comprising a Barrage a 52 Km long RCC lined power channel and power complex, As inspector Civil is responsible for the construction of super passages, road bridges, culverts, inlets, escapes, railway bridge, repair works 52 Km long concrete lining.

Responsibilities include:
➢ Construction of Super passages, Road Bridges, Culverts, Inlet, Escapes and Railway Bridge.
➢ Casting of Bridge beams, of 33.0 m length. Their post tensioning by latest technology of Tensacciai, grouting and finally launching on the bridges.
➢ The match casting of the pre-cast super passage segments, their launching with high technical and sophisticated STAC system, post tensioning with, Tensacciai technology and finally their grouting.
➢ Maintaining the quality of concrete from its batching to its placing into the forms. After placing, it's curing with approved specified methods up till the required time.
➢ The quality control on steel right from its physical and chemical testing to its proper fixing at site.
➢ Solution of different technical problems occurring at site.
➢ Calculation of pre-stressing results obtained during the post tensioning of the bridge beams, deck slabs and super passage flume.
➢ The verification of IPC submitted by the contractor for payment.
➢ Coordination between the site and the office.
➢ Construction of Crumb Weir and Labyrinth type escape structures for excess discharge for the channel.
➢ Supervision of repair works for 52Km long time of the Power Channel.
➢ Supervision of steel structure Railway Bridge at km 47.
➢ As team member supervised the monitoring of vertical & inclined pezometres for ground water level.
➢ Monitored the discharges and velocity of flows into the channel.
➢ Regular reading of staff gauges installed at different locations of the Power Channel.

J) November 2000 to August 2002
Employer: NESPAK (Pvt.) Ltd.
Location: Ghazi Barotha Hydropower Project
Power Complex Barotha
Position Held: Site Inspector

As Site Inspector supervised the construction of concrete structures i.e. Tail regulator, North Sill, South Sill and Switch Yard. Responsibilities include.

➢ Supervision of construction of foundations, piers, abutments & deck slabs.
➢ Construction of pre-cast girder slabs.
➢ Pre-tensioning and post tensioning of girder and slabs.
➢ Construction of tower foundations for switch yard.
➢ Construction of cable trenches for control building.


K) April 1998 to October 2000
Employer: NESPAK (Pvt.) Ltd.
Location: Rural Access Roads Project Peshawar
Position Held: Site Inspector

As a Site Inspector supervised the construction of roads. Responsibilities included the supervision of:
➢ Preparation of sub grades.
➢ Construction of roads and asphalt works.
➢ Construction of culverts, causeways and retaining walls.
➢ Testing of road material.
➢ Verification of IPC's submitted by contractor.
➢ Construction of bridge foundations such as piling.
➢ Pre-stressing of girders.
➢ Launching of girders.


L) December 1997 to March 1998
Employer: NESPAK (Pvt.) Ltd.
Location: MCL Road Project Lahore
Position Held: Site Inspector

As a Site Inspector supervised the construction of MCL road projects in Lahore. Responsibilities included the supervision of following activities.

➢ Widening of roads.
➢ Asphalt work and construction of drainage and sewerage works.
➢ Verification of Contractor's bills.

M) August 1996 to November 1997
Employer: NESPAK (Pvt.) Ltd.
Location: N 70 Bridges Project D.G.Khan
Position Held: Site Inspector

As a Site Inspector supervised the construction of bridges at D.G. Khan to Loralai road project. Responsibilities included the supervision of following activities.

➢ Construction of piles.
➢ Construction of pre-stress girders.
➢ Stressing of girders.
➢ Launching of girders.
➢ Construction of deck slab.
➢ Construction of Access roads to bridges.
➢ Construction of Box Culverts.

N) June 16, 1995 to July, 1996
Employer: NESPAK (Pvt.) Ltd.
Location: Mohmand Area Development Project for roads.
Position Held: Site Inspector

As a Site Inspector supervised the construction of various road projects in Mohmand Agency Areas. Supervised the following activities.

➢ Cleaning & Grubbing
➢ Preparation of embankments layers.
➢ Preparation of sub grades for roads.
➢ Construction of road involving placing of sub base, aggregate base course and asphalt works.
➢ Testing of road material for quality control.
➢ Construction of drainage structures such as culverts and causeways.

O) October 1993 to June 1995
Employer: NESPAK (Pvt.) Ltd.
Location: Farm to Market Road Swat NWFP
Position Held: Site Inspector

As Site Inspector supervised the construction of Farm to Market Roads in Swat. Responsibilities included the supervision of the following works.

➢ Cleaning & Grubbing
➢ Preparation of embankments layers.
➢ Preparation of sub grades for roads.
➢ Construction of road involving placing of sub base, aggregate base course and asphalt works.
➢ Testing of road material for quality control.
➢ Construction of drainage structures such as culverts and causeways.

Specialties & Skills