Principal HVAC Engineer
Wood Plc
Total des années d'expérience :20 years, 0 Mois
PMC / EPCM Engg of HVAC Projects for the Refineries / LNG Teminal / Substation / Control Room / Battery Room / Cable Cellar .
Preparation of TBE, MTO, BOQ.
Reviewing of Engg Documents
KIPC & KNPC Offshore Support Building HVAC-Marine Terminal . Common Service Platform, Battery room, Electrical Room.
Modular Buildings , PSS Skids, E Houses, Sub Stations
GREEN FIELD & BROWN FIELD OIL & GAS HVAC Projects for the QATAR GAS, RAS GAS, QAFAC .
familiar with the ASHRAE, SMACNA, UPC, IMC, NFPA,
Prepares and reviews of engineering studies, design drawings/ documents, and material/ equipment specification.
Design of chilled water system, load calculations, duct sizing/layout, ventilation, etc.
capable of performing HVAC calculations both manually and electronically using HAP .
Prepare of pipe sizing/ routing, developing schematic control diagram
Dolphin Energy - June 2018 -Oct 2018(Short term )Secondment
Reporting to - Senior Manager - (Technical Services Dept.) Upstream.
Project: HVAC for the Upstream and Compression Facilities.
Onshore FEED for HVAC for Extension of Laboratory Building and Operation Administration Buildings.
Preparation of Scope of work, Material Requisition, Specification & Datasheets for HVAC
EPC - HVAC Projects.
•Extension of Lab Projects.
•HVAC Augmentation for Sub Station.
•Study the Access Control for the Fire Dampers &Gas Dampers. (Workshop, Mosque, Canteen )
4. New Board room in Operation Building.
OFFSHORE - Revamping the HVAC System OFFSHORE Platforms.
•Noise Reduction in Dolphin Platform Dol 01 & Dol 02
Reporting to - Project Manager / RCM.
Looking For IOCL Paradip Ratha Chakra Poly Propylene Project - 2200 Crores Project.
Reviewing of HVAC design, calculation, equipment specifications, data specifications, data sheets, drawings given Approval to EPC Subcontractor.
Reviews all HVAC submitted material and drawings with close follow up of HVAC site activities.
Design activities of contractors. Attends and resolves drawings and philosophies
Reviews HVAC engineering documents/drawings of EPC contractor to insure implementation of safe operation philosophy.
Participates in HVAC constructability reviews, risk assessment and integrity management.
Participates in meetings and safety audits.
Complies with the Company's HSE management system
Reporting to - Project Manager.
Project: 1. Design Consultancy Service for the Blast Proof Operators Shelters in Ruwais Refinery East and West and
2. Study for Toxic Gas Ingress System for 14 Building in Ruwais Refinery East.
Site Survey and Data Collection in Ruwais Refinery for Existing Operator Shelters.
Preparation of Concept Design for the HVAC & Toxic gas Ingress System for OPS.
Preliminary Design for the HVAC, Plumbing.
Detail Engineering for HVAC and Pressurisation of the building.
Identification of Tie -in Points for water, Fire Fighting.
Approval of Preliminary Concept Layout, Detail Engineering for the Project.
Projects Kuwait - For KNPC & KOC HVAC Projects.
Kuwait Project: Client: KNPC. 1. Ahmadi Depot Expansion, Kuwait.
Oil & Gas Refinery Projects through
HVAC - Engg Document & Drawing (Layout, AFD, DID, AFD ) preparation.
Clients: KNPC, KOC, SAIPEM, Gulf Spic General Trading & Contracting, L&T ES,
Preparation of Engineering Documents, Drawings for Approval to KNPC / EPC Contractor
Mechanical
Reporting to - Country Manager
Responsibilities.
Maintenance of HVAC Oil & Gas Platform Projects & New Projects tendering
Preparation of Tendering for the offshore Living Quarters HVAC &On Shore HVAC.
Preparation of Cost Estimation sheet.
HVAC Design Verification &Validation.
Offer the HVAC Project Quotation to the Client.
Preparation of BOQ for Chillers, AHU, Ventilation Units, and Chilled waterPump.
All the accessories for HVAC.And Floating RFQ to Vendors / Equipment Suppliers.
Arranging all the Material and Inspection of the Project materials.
Check the Materials and Tools are as per the client HSE requirement manual.
Projects:
1. ONGC - Operation and Maintenance Contract for Platform HVAC Equipment’s.
2.British Gas India ltd - Revamping and Retrofit of the HVAC Projects for Offshore Platform.
3. ONGC - Through Pipav offshore Design Engineering. (Redesign of Sagar Pragati & Sagar Laxmi Platforms HVAC)
4.Petropras - Technip through Pipav offshore Design Engineering. (Platform HVAC)
5.ONGC - Opal Project Gujarat. - Through Optical engineering house
Technical Manager
Application Estimation) (www.etaascon.com).
Reporting to - Divisional Manager.
Responsibilities.
•Preparing BOQ for Accessories for HVAC.
•Selection of HVAC Equipment’s and accessories for the Project from consultant approved suppliers.
•Material Approval from Consultants for all materials.RFI for project.
•Design the Heat Load Calculation using software - Block body 3.05.
•As per Designed load, Specify and Selection of the Air conditioners.
•Prepare the Schedule for air conditioning units.
•Duct design of the designed Projects.
•Prepare job cost Analysis for the HVAC Project.
•Knowledge of ESTIDAMA Requirements.
•Knowledge in ASHRAE, NFPA90a, and Duct work SMACNCA.
Projects involved:
•Al Reef Villas-2300 No’s and Tower Projects in Abu Dhabi
An ISO 9001:2008 Company)
(Dealers of leading Air conditioners, LG, THOSIBA, CARRIER, DAIKINand Emerson)
Designation:
Reporting to - M.D
Responsibilities:
•In charge production of Pump and Valve components.
•Dealing with subcontractors and customers.
•In charge for Foundry spares.
•ISO Management Representative for ISO implementation.
•Knowledge in Production, quality and material purchasing.
•Responsible for statistical Process control fill the R and X bar Charts.
Mechanical Engineeing
courses: Heatload Calculation 2.Refrigeration & air-condition machines Applications 86 %1stclass withhonours