WORK SUMMARY
• Preparation of daily progress report and weekly progress report of installations for tracking the pending
installations and their respective installation inspection.
• Responsible for QA/QC documents of the complete project including certificates of calibration, test result.
inpection results, inspection requests, non-compliance reports and site instruction/observations, material
delivered/used etc.
• Preparation of method statement(MS), Inspection Test Plans(ITP), Checklist, IRE’S and MIR’S.
• Preparation of civil obstruction reports for the pending installations on site.
• Raising NCR’S for materials and installation that doesn’t follow quality standards.
• Review on construction details, product data, material samples, inspection plans, method statement,
delivery schedules to conform compliance with the requirements of the project.
• Site progress checking and quality supervision and instruction as per company standards.
• Mobilizing man power, materials at site and preparing daily reports.
• Coordinate MEP drawings to ensure all systems work within space constraints and code and keep current and
accurate drawings of construction changes to ensure that ‘as built ‘documents are provided by the company and
our sub contractors to clients.
• Preparation of work schedule, monitoring and technical assistance over the activities carried on site.
• Assisted procurement team for the purchase of the materials according to the Project Quality Plan.
• Understand, support and adhere to the company’s health and safety policies, programes and procedures by
communicating and promoting Health &Safety awareness to coworkers and subordinates

QA/QC Engineer في CONCORD ELECTRICAL AND CONTRACTING
  • قطر - الدوحة
  • مايو 2018 إلى يناير 2020

• Worked in the ELV and Mechanical systems testing and Commissioning in Lusail LRT Project of QATAR RAIL.
• Preparation of ITR and MIR for the materials received and for the installation of devices done on site.
• Mechanical Installation and inspections for the Ticket Vending Machine and the SCADA furniture systems.
• Testing and commissioning of the power cables by proceeding Insulation resistance test and continuity check prior to the termination.
• Technical support and Site in charge for ELV system installations under the QC department.
• Analysing the QA/QC documents of the entire project including certificates, calibration, test results, inspection requests, non-compliance reports and site instruction/observations and another QA/QC document
• Inspection of material’s or equipment received on site are according to the material standards provided by the Contractor specifications.
• Worked in Power Distribution Panel (PDB) testing and termination for the At Graded and UG stations
• Assisted in the Digital Transmission system (DTS cabinets) termination and the final inspections.
• Worked in the site execution for the AFC, PIS and COMTV device locations.
• Providing technical assistance and operational procedures of the equipments installed on site.
• Troubleshooting of devices or equipments and Electrical loops rectification before inspection under the QC department and during the final commissioning of the project.
• Review the installation drawings provided by the client and ensure that the installations are done according the design standards and drawing specifications.
• Undergone CCRM Level 3 and RKH Training for railway operations and commissioning.
• Updation of revised drawings and locations to the site supervisors for the device installation.
• Coordinating CCTV installations and camera allocations prior to final installation inspection.
• Worked in Access control and Intrusion detection system devices testing and termination.
• Designed and detailed mechanical parts and cable assemblies for the Light Rail Transit network.
• Preparation of the red line mark-ups for the device installations and Cable routing for the ccs systems.
• Undergone inspections for the 12 C and 24 C FO cables slicing in the DTS cabinets and slicing boxes.

QA/QC Engineer في UTI –ZITRON
  • قطر - الدوحة
  • يونيو 2015 إلى مايو 2018

• Works in Tunnel Ventilation system of Doha Metro Project under QATAR RAIL.
• Assisted in the projects client commissioning team during the final stage of station handover.
• Scheduling and coordinating work and test procedures during the initial and final phase of the project according to the method statement provided.
• Preparation of IRE’S and MIR’S for the materials received and for the installation of devices done on site.
• Issual of Non Conformity Report (NCR) for materials and installation that doesn’t follow quality standards.
• Preparation of Inspection Test Plans for the TVS equipment and Air handling units of the metro stations under Qatar Rail Green line project.
• Preparation of daily progress report and weekly progress report of installations for tracking the pending installations and their respective installation inspection
• Carried out installation of four block carrier Air Handling unit for the tunnel ventilation system of the Green Line metro stations under QA/QC Department.
• Coordinate with the representatives and site in charge for inspection and meeting about quality problem including the closure of Non-Compliance Report.
• Develop inspection test plan and check list based on the specification of project.
• Carried out Internal audit at the site as scheduled in the Project Quality Plan(PQP)
• Handled the installation of motorized smoke fire dampers(MSFD) inside the station and over the track area.
• Undergone positioning and installation of Axial fans with Silencer inside the station.
• Assisted and supervised the duct and the piping installations of the Air Handling Unit
• Preparation of daily progress report and weekly progress report of installations for tracking the pending installations and their respective installation inspection.
• Inspection on drawings provided by the client to match with the material dimensions and the designs...
• Snag rectification and punch list clearance during the project final stage.
• Undergone CRO-001 and CRO-003 training under construction Railway Operations and obtained PIC license to work in track.
• Personal in charge for the equipment installations under the platform level and over the track.

MEP Engineer في SR Contracting Solutions
  • الهند - بنغالورو
  • يونيو 2013 إلى أبريل 2015

WORK SUMMARY
• Preparing work packages, inspecting and identifying required material and equipment for performing
construction work.
• Carry out inspection and checking for all quality related procedures in the site and ensures activity at the site as
per the approved method statement and inspection plan.
• Direct the purchase, modification, installation, maintenance and operation of fire protection systems.
• Carried out installation of Jockey Pump and Diesel Pump for fire fighting system.
• Assisted in installation of sprinklers and Fire Hose Cabinets with Fire Pump System.
• Supervise coordinate and execute construction activities along with electrical department for all aspects of
work including cable pulling, installing instruments, conduits, , trunking, tray, ladder rack, confine space entry,
small power and lighting and termination..
• Diagnose malfunctioning systems, equipment, and electrical parts using test equipment to identify the cause of
breakdown; fix the problems and connect the components within designated schedules.
• Actively Involved in Procuring the Control &Instrumentation (Cables, Cable Gland, JunctionBox, tubing, etc.),
Building Control & Instrumentation(Cables, CCTV, PA, Card Access, EVC, Junction Box, etc.) items.
• Coordinate with the representatives and Site-In-Charge for Inspection and meeting about quality problem
including the closure of Non-Compliance Report.
• Control and monitor all activities related to Quality Management System.
• Ensures Quality standards in Pipe lines and other structural components using quality methods

Operations and Maintenance Engineer في Kerala Tubes Ltd
  • الهند
  • مايو 2012 إلى يونيو 2013

WORK SUMMARY
• Execution of the Operations and maintenance activities of the production unit.
• Assisted in erection work and production in manufacturing of GI/MS Pipes.
• Material planning and inspection of the material available for the manufacturing process.
• Planning and scheduling of the finished product availability according to customer’s needs and requirements.
• Rostering of the transport operations for the material movement to the customer’s site.
• Preparation of inventory notes for the customers.
• Assisted in the Procurement of the materials required for the production process.
• Accounting of the traded units and units available in production yard.
• Proposing improvement on maintenance modification, recommending material & tools & necessary actions
enabling carrying out properly of the instrumentation duties.
• Projects and implementation of automatic scrap punching machine.

الخلفية التعليمية

ماجستير, OPERATIONS MANAGEMENT
  • في Sikkim Manipal University
  • يونيو 2016

بكالوريوس, Mechanical Engineering(Aeronautics)
  • في Anna University – Anna University Of Technology Chennai
  • أبريل 2012

Specialties & Skills

INSTRUCTION
MATERIALS MANAGEMENT
PROCUREMENT
QUALITY
QUALITY CONTROL
SCHEDULING
TECHNICAL SUPPORT
ACCOUNTANCY
CABLING