Mechanical Engineer
Galfar Al Misnad Engineering Contracting WLL
Total years of experience :10 years, 2 Months
Qatar Energy chemical plant shutdown 2022. Maintenance of heat exchangers including bundle pull out cleaning and re insertion boxup and hydrotest.
For their execution of Borough 1 plant shutdown Ethelene Cracker(EU1), Poly Ethelene (PE1&PE2), Butane and Utility under Ruwais Refinery, ADNOC
Replacement of 3 phase production seperators internals at Fahahil sector during Project Dukhan Production Fascility Upgradation (DPFU) at Qatar Petroleum under DOPET.
Good knowledge in the field of mechanical piping activities and read and draw the isometric, general arrangement and P&ID
•Essential knowledge in the field of maintenance of static equipment like heat exchanger, vessel, column, reactor, etc. in the refineries.
•Preparation of Isometric Drawing as per site modification.
•Erection of spools at various elevations
•Process & utility piping execution.
•Coordination with clients/consultants/subcontractors for execution of works.
•Resources availability for better execution.
•Mechanical Clearance of the systems
•Scaffolding Plan as per Execution.
•Making daily, weekly and monthly plan for achieving target.
•Knowledge in pre commissioning activities and preparing the test packs
•Knowledge of hydrotesting in piping and static equipment and box up/system clearance.
•Completed the foundation course of Primavera P6, AutoCAD, Solid works and Pro E.
•NDT level 2 certification.
•Extended ability to complete tasks with high quality.
•Excellent Communication, listening and motivating skills.
CAREERSUMMARY:
TOTAL EXPERIENCE IN OIL AND GAS INDUSTY FIELD:
9.0YEARS
DECEMBER
•Responsibilities:
•Supervision, monitoring and coordinating of all shutdown activities which include maintenance, inspection and testing of static equipment.
• Coordination and liaising with client for shutdown preparation and activities.
• Close supervision, coordinating and Extraction of U Tube and straight tube bundles of exchangers, using Bundle puller and crane.
•Inspection of U tube bundles for corrosion and witness NDT examination where required.
•Overhaul, servicing and inspection of Static Equipment by coordinate with QC and clients.
•Maintenance of all major static equipment like heat exchangers, fin fan coolers, columns, and pressure vessels
•Hydro testing for high pressure vessels and shell and tube heat Exchangers.
•Supervision of scaffolding erection safe for use
•Final handover of shutdown activities and documents.
•Staff management
JANUARY
•Responsibilities:
•Responsible for all kind of Mechanical and Piping activities in construction industry. Responsibility includes providing general assistance in construction such as project planning, project management, fabrication & erection follow up with sub-contractors and bulk piping material control. Preparation of activity schedule for site works and arranging for execution production
in