Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Arun Vijayakumar, Sr. Construction Engineer

Arun Vijayakumar

Sr. Construction Engineer·Offshore Abu Dhabi

India

Work experience

Total years of experience: 20 years, 6 months

Sr. Construction Engineer

March 2020 - Present

Offshore Abu Dhabi

March 2020 - Present

Project Name: Topside modification for new gas lift facilities at 4 x WHPT’s
Scope:
* Installations of Gas Lift top side facilities for the new producer wells on four WHPT’s (PW-32, PC-20, PC-75
&PC80) and upgrade existing topside facilities to meet the processing requirements for gas lifting of the new
producers
* Conversion of the existing electrical system on the WHPT’s to power via the new composite power cable from
artificial island
* Dismantling and removal of TEG
* Gas line depressurization facility with new mini vent boom, drain boot and ultrasonic flow meter
* New oil manifold chemical injection skid with storage tank
* Nitrogen pressurization lines and portable N2 bottle rack
* New MPFM on PC-80 & PW-32
* Fire water system modifications

Company industry:
Oil & Gas
Job role:
Engineering

Sr. Construction Engineer

July 2018 - January 2020

ADNOC OFFSHORE

United Arab Emirates

July 2018 - January 2020

ARZANA field de-commissioning
Scope:
The dismantling, Removal and Disposal Project of Arzanah Island Onshore & Offshore facilities is the first kind in
the region which involves sour oil and gas facilities. Flushing, Cleaning, De-Gassing and De-Contamination
comprising of Process plant, Tank Farms, Oil Storage Tanks, Separators, Crude Stabilizer Towers, Liquid Surge
Drums, Flare knock out drum and Flare Tower, Redundant cables and Pipes, Pipe Racks and Pipe Sleepers,
Firefighting facilities, Substations etc. Also included soil backfilling, soil replacement with suitable soil as per HSEIA
recommendations, site grading and cleaning all dismantled and demolished areas.
* 9 x free standing conductors with one riser each.
* 2 x Moss Structures with one riser each.
* 15 x tripod well head platforms, 1 x four legged Platform, 1 x Flare Tower, 1 x Intermediate platform, 3 x
Interconnecting bridges and 1 x six legged production platform with risers
* Boat landing, Fenders and Subsea Electrical cables.
* Subsea Pipelines, Connection Spools and Risers.

Company industry:
Oil & Gas
Job role:
Engineering

Offshore construction Engineer

March 2017 - April 2018

ADNOC OFFSHORE

United Arab Emirates

March 2017 - April 2018

UZ750 EPC-1
Scope:
Pipeline mitigation works; FCG, hydrotesting & preservation; Topside hook up

Company industry:
Oil & Gas
Job role:
Oil and Gas

Offshore construction Engineer

November 2012 - January 2017

ADNOC OFFSHORE

United Arab Emirates

November 2012 - January 2017

UZ750 EPC-1
Scope:
* Concrete sleeper installation
* Pipeline, riser, J-tube and expansion spool installation
* Mid line tie-ins
* Jacket, riser platform, flare tower and flare bridge installation
* Top side hook up and tie-ins
* FOC and CC installation
Principal Duties as a

Company industry:
Oil & Gas
Job role:
Oil and Gas

Offshore Field Engineer

July 2012 - September 2012

MOMENTUM ENGINEERING

United Arab Emirates

July 2012 - September 2012

Project Name: Zhdanov Field Development
Scope
* Pipeline, riser and spool installation campaign @ 20-60m
* Liaise between barge superintendent and project manager
* Liaise with the engineering department on installation engineering matters
* Specifies materials and produces requisitions to support procurement needs of the project

Company industry:
Oil & Gas
Job role:
Oil and Gas

Offshore Field Engineer

September 2011 - April 2012

LEIGHTON OFFSHORE

United Arab Emirates

September 2011 - April 2012

Project Name: Iraq Crude Oil Export Expansion
Scope
* Subsea spool and structure installation
* 11 x 48” Subsea spools, 3 x Subsea PLEM's, 1 x 600 MT subsea Valve Manifold and 3 x SPM's (associated
subsea and floating hoses) @ 15-35m were installed in this campaign along with some subsea cable
termination operations
* Reporting to offshore construction manager and onshore management
* Liaise with survey team onboard regarding metrology using LBL survey
* Liaise with the diving team onboard as 99% works were diving oriented

Company industry:
Oil & Gas
Job role:
Oil and Gas

Offshore Field Engineer

June 2011 - August 2011

HYDRODIVE NIGERIA LTD

Nigeria

June 2011 - August 2011

Project Name : Okwori Field Development
Scope : Disconnect flow line and umbilical pair from six depleted wells and re-lay them to newly
discovered wells. DSV Zafiro Endeavour was the vessel utilized for the operation at water depths ranging from
120m - 150m.

Company industry:
Technical Maintenance & Repair
Job role:
Oil and Gas

Offshore Field Engineer

March 2010 - May 2011

VALENTINE MARITIME GULF LIMITED

India

March 2010 - May 2011

Project Name : Mumbai High North Development (MHN)
Scope
* Pipeline, riser and spool installation campaign @ 60-100m
* Liaise between barge superintendent and project manager
* Liaise with the engineering department on installation engineering matters
* Specifies materials and produces requisitions to support procurement needs of the project
* Liaise with the survey and diving team onboard

Company industry:
Oil & Gas
Job role:
Oil and Gas

Subsea Pipeline Engineer

March 2009 - February 2010

LEIGHTON CONTRACTORS (INDIA) PVT LTD

India

March 2009 - February 2010

Pipeline Replacement Project - 2 (PRP2)

Company industry:
Oil & Gas
Job role:
Engineering

Subsea Pipeline Engineer

February 2007 - February 2009

LIKPIN LLC

India

February 2007 - February 2009

Project Name: South Sumatra - West Java Phase II
Scope :
* 163 Km long Rigid P/L (32”) @ 60m Water Depth
* Shore Approach - 2 locations
* Pipelay barge - Hyundai HD60

Company industry:
Oil & Gas
Job role:
Engineering

Graduate Engineer Trainee

June 2005 - January 2007

M.E.C ENGINEERS

India

June 2005 - January 2007

Tank repair project in Cochin Refineries LTD (KRL)
* Civil, Mechanical & Electrical works for Apollo Tires LTD
Duties:
* Assist site engineer in all activities and thereby learning to take responsibilities
* Manage worksite and planning next day's work
* Manage permits for daily work

Job role:
Engineering

Skills

CABLING
Expert
CABLING
Expert
ENGINEERING
Expert
ENGINEERING
Expert
MICROSOFT WORKS
Expert
MICROSOFT WORKS
Expert
OIL PAINTING
Expert
OIL PAINTING
Expert
CUSTOMER RELATIONS
Expert
CUSTOMER RELATIONS
Expert
APOLLO
Expert
APOLLO
Expert
APPROACH
Expert
APPROACH
Expert
BRIDGES
Expert
BRIDGES
Expert
CONVERSION
Expert
CONVERSION
Expert
JAVA
Expert
JAVA
Expert