STATION ATTENDANCE MANAGER
QDVC
Total years of experience :27 years, 7 Months
Liaise with respective station managers, including Civil Station Manager, Architectural Station Manager, MEP station Manager, CP Manager and Tunnel Construction Coordinator, for attendance services in each station.
Liaise with MSI Station and Tunnel Managers for attendance services including but not limited to access requirements, crane logistics, laydown areas allocation, generator installations, Permit to Work System coordination.
In-Charge for supervision in 05 Buildings structure work in the Project of Depot which includes Administrative Building and OCC Building, Service station, Traction Power & LPS, Stabling Building MEP Plant, Underground Water storage & PS.
In-Charge for structures in the Project of 25 KM which includes 04 wadi Bridges, 03 overpasses, 01 interchange consist of 1 Link Bridge and 02 Ramp Bridge and 86 Box Culverts consisting’s 01 cell to 27 cell.
Responsible for month wise programs and their achievements.
Month wise & daily monitoring, scheduling, management of works.
Progress meeting with consultant & Client.
Technical details coordination between design section & execution section.
In-Charge for structures in the Project of 61 KM
Responsible for month wise programs and their achievements.
Month wise & daily monitoring, scheduling, management of works.
Progress meeting with consultant & Client.
Technical details coordination between design section & execution section.
As an In-Charge for structures in the Project. (5 Major Bridge, 2 Flyover, 1 ROB, 9 Minor Bridge, 10 Underpasses and 120 culverts).
Responsible for month wise programs and their achievements.
Month wise & daily monitoring, scheduling, management of works.
Progress meeting with consultant & Client.
Technical details coordination between design section & execution section.
Elevated Viaduct (Oct 2006 to Sep 2007)
As a Section-in-Charge of a 5 Km stretch.
Responsible for month wise programs and their achievements.
Month wise & daily monitoring, scheduling, management of works.
Task includes bore hole cast-in-situ pile foundation of diameter 1400-2200, pile cap construction, pier column in-situ construction, pre cast pier cap segment erection and allied works.
Monitoring daily works of subcontractors, fixing of suppliers and subcontractors, maintaining quality of works, monitoring International Health & Safety Standards.
Precast Yard - Pier Cap (Oct 2007 to July 2009)
As a Precast-in-Charge for Pier Cap Red & Green line (54 km.) 1000 no Pier Cap
Coordination with super structure team for launching girder schedule.
Monthly, weekly & daily scheduling & monitoring for Pier cap casting, transportation and erection of Pier cap, 1st stage concrete, 2nd stage concrete & pre-stressing (Stage A, B, C)
Progress meeting with consultant & Client.
Technical details coordination between design section & execution section.
Green Line Pile Remedial works including Inter station Road works ( till November 31 2010)
As a Section-in-Charge for Green line South Section.
Coordination with super structure team for load test by launching girder.
Monthly, weekly & daily scheduling & monitoring for pile remedial works.
Progress meeting with consultant & Client.
Technical details coordination between design section & execution section.\
Construction supervision of 3 major bridges with post tensioning works.
Resource allocation, materials management & supplier fixing.
Manpower arrangements.
Interaction with the Engineers for working drawings, methodology approvals, measurement certification etc.
Setting out the monthly targets, their scheduling & achieving the targeted plans accordingly.
Responsible for day-to-day activities to achieve the month wise goals.
Execution supervision of Road and Major Bridges with Voided slabs, slab culverts & HP culverts.
Resource management, materials allocation & supplier fixing.
Manpower arrangements.
Interaction with the Engineers for working drawings, methodology approvals, measurement certification etc.
Setting out day wise planning & execution to achieve the planned quantity with quality.
Execution of cast-in-situ bored pile; shuttering, reinforcement & concreting work of deck slabs.
Pre stressing of cast-in-situ girders.
Alignment, positioning & positioning of electrometric bearings, fixing of expansion joints.
Approach road Earthwork with GSB, WBM & DBM roads.
Sector-in-charge of cross drainage works from KM 438.600 to 457.000, which involves:
Preparation of monthly work programme based on construction schedule, mile stone & monitoring on day to day basis.
Material and resources planning and allocation of work execution.
Construction of major bridge with cast in situ girder & pre-stressing with Fressinet jack, fixing of Roller cum Rocker bearing.
Construction of slab culverts, Hume pipe culvert including site layout, working drawing approval, reinforcement, shuttering and concreting.
Certification of quantity and measurement from client.
Construction supervision activities like:
Cutting edge placing.
Well caisson - Double D type 36-mtr depth.
Reinforcement, shuttering and concreting.
Pier, pier cap and substructure, reinforcement shuttering and concreting
Erection of precast/ pre stressed girder of 42 mtr by LAUNCHING GIRDER- segmental launching method.