POWER TECHNICIAN
Globacom Nigeria Limited
Total years of experience :15 years, 4 Months
SUPERVISION OF MAINTENANCE AND REPAIRE OF POWER GENERATOR.(RAGING FROM 1500KVA -10KVA)
INSTALLATION AND MAINTENANCE OF RECTIFIER PLANT.
MAINTENANACE OF EXTRAL LOW & MIDIUM VOLTAGES AC/DC POWER CONTROLS PANEL.
GENERATE REPORT FOR GENERATOR NEXT SERVICING & FUELING SCHEDULE.
TO ENSURE THAT POWER EQUIPMENT PANELS ARE NOT OVER UTILIZED./OVERLOAD.
TO ENSURE THAT APPROPRIATE SIZE GENERATOR ARE USED TO AVOID UNDERUTILITY/OVERUTILITY OF POWER GENERATOR.
TO ENSURE THAT POWER EQUIPMENT ARE ADEQUATELY EARTHED.
MAKING SURE ALL THE TELECOME EQUIPMENTS ARE ADEQUATELY BAKING UP BY ENSURING MONTHLY BATTERY DRAIN TEST.
ABILITY TO TERMINATE AND MONITOR EXTERNAL ALARMS
REPAIR OF ANY GEN CONTROL PANEL
Higher National Diploma in Electrical/Electronics Engineering. (Power Option)
Ordinary National Diploma in Industrial Maintenance Engineering. (Studying of Thermodynamics,Fluid mechnics,Welding Technilogy,Electrcal, Electronics Engineerig Practice)