Ashfaq Jan, Protection And Electrical Maintenance Engineer (1450MW power plant and 500KV switchyard)

Ashfaq Jan

Protection And Electrical Maintenance Engineer (1450MW power plant and 500KV switchyard)

WAPDA,Pakistan Water And Power Development Authority

Location
Pakistan
Education
Bachelor's degree, Electrical Engineering
Experience
16 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 2 Months

Protection And Electrical Maintenance Engineer (1450MW power plant and 500KV switchyard) at WAPDA,Pakistan Water And Power Development Authority
  • Pakistan
  • My current job since August 2009

Working as Protection and Electrical Maintenance Engineer since March 2008 in 1450 MW, Ghazi Barotha power plant and 500KV Switchyard with following duties;

1. Testing and Settings of the following protective relays regarding generator, transformer and transmission lines.

 ABB REG 316, REL 512 and RET 541
 Direct Logic PLC’s
 Restricted earth fault relay 7VH 6000/6002
 Over current relays MCGG 22, 62, 82 (ALSTOM)
 Over voltage relays MVTD 12, MVTU 12
 CEWE Energy meters (Prometers) 4322 and 4363
 Sineax programmable transducers DME442

2. Relay Setting Calculations.

 Line Over voltage Relay MVTD 12 & MVTU 12.
 Shunt Reactor over current Protection MCGG 82.
 Shunt Reactor REF Protection MFAC 14 & MFAC 34.
 Installation and revision of the settings of ABB, Siemens and Dirct logic numerical relays.

3. HV System and Power Transformers

500KV switchyard and Transformer
 Oil Dielectric strength test
 Meggering
 Power and dissipation factor test
 Transformer turns ratio
 Oil dehydration
 Repair and maintenance of 500KV Bus bar and SF6 circuit breakers

4. LV and DC System

Repair and maintenance of LV Switch gears, breakers, Bus bars, MCB, disconnect Switches, UPS and Aux Transformers

5. Unit Excitation system

The static excitation system used at Barotha power complex is Unitrol-P.The system includes thyrister bridges and electronic control system. The trouble shooting includes:

 Repair and maintenance of ventilation unit.
 Replacement of defective PCB cards in converter electronics, measuring interface etc.
 Trouble shooting of field circuit breaker.


6. Operational duties during overtime

Testing and calibration of different gauges, indicators, flow switches, meters, alarm and trip system of gen. T/f and 500Kv breakers, Documentation of tests and troubleshooting results. Preparation work schedule, progress reports, fault reports, cancellation of trouble reports, fault finding with the help of schematic drawings.
Having a complete liaison with national Power control Center regarding system parameters like Load, Voltage and frequency or arranging any shutdown.

7. Equipment used

 Omicron
 C&DF
 Insulation Taster
 Megger
 Oil Tester
 Oil Purification Plant
 Various Software’s for relays through Laptop and etc

Operation Engineer at WAPDA
  • Pakistan
  • March 2008 to July 2009

Ghazi-Barotha Project Power Generation Project of Pakistan WAPDA with an installed capacity of 1450MW with the advance technology of DCS and numerical protection. The power house comprises of five generating units, 500KV and 220KV switchyard, Medium Voltage and Low Voltage switchgear, and Diesel Generator.

a) I worked as shift engineer and my duties were;

 Having a complete liaison with National Control Centre regarding the system condition, parameters like frequency, load, voltages etc and arranging any proposed or emergency shut down on lines or generating units.

 Start/stop of five numbers of units through DCS remote or hard wire or DCS local.
 Operation of 500kv, 11kv and 400v switch gears through local or remote DCS.
 Issuing P.T.Ws and S.P.Tags to the maintenance engineers for routine and emergency maintenance.
 Keeping an eye on the system parameters like frequency, system voltages, line loadings, unit loadings etc.
 Preparation of daily synopsis, calculation of energy sheets on daily basis, log sheets etc.
 Preparing trouble reports on any abnormal conditions, alarms, tripping etc.
 Restoration of system after total and partial system collapse.
 Assigning duties and regulating leaves of technical staff members.

b) In addition to operation duties trouble shooting /Maintenance of lighting system of Power House and LV system. LV System includes

 ABB 3 pole Breakers
 ABB 4 pole Breakers
 ABB 630KVA 11KV/400V Transformers
 ABB LV Auto Couplers

c) Maintenance of UPS System /Batteries

 ALSTOM Batteries 220V Set with 110 cells and 2V each cell

Education

Bachelor's degree, Electrical Engineering
  • at NWFP University of Engineering and Technology, Peshawar
  • June 2007

Placed in first division and did engineering with honours

Diploma, Pre-Engineering
  • at P.A.F Degree College Peshawar,Pakistan
  • June 2002

Placed in first division

High school or equivalent, Sciense
  • at P.A.F Degree College Peshawar,Pakistan
  • April 2000

Placed in first division

Specialties & Skills

Languages

English
Expert
Urdu
Expert
Pushto
Expert

Memberships

Pakistan Engineering Council
  • Member
  • June 2007