QA/QC ENGINEER
TEXAS OILFIELD
Total years of experience :8 years, 2 Months
Chemical Storage Terminal Project.
Laying of pipes from terminal to jetty(both above and below ground
Implementing the
Client
1 Construction of 2x660MW Super Thermal Boiler for NTPC.
Monitor and control all the welding activities with the inspection concept of before, during and after welding.
* Piping inspection including Verification of line erection according to ISO, P&ID/GA drawings.
* Monitor and control all piping activities from material receiving to final handover by inspecting Fit up, welding activities, Line walk down, Punching activities, Package review, Hydro test, Reinstatement.
* Liaising with the project planning engineer regarding construction programme
* Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools etc.
* Ensures that all works are done in accordance with approved construction drawing, contract documents, project specification and quality standards.
Mathematics, Physics, Chemistry 2008 80%