Piping Engineer
Azaran Industrial Structures Company (Steel Industry)
Total years of experience :6 years, 3 Months
• Designed and modeled UG/AG piping systems and equipment layouts for various areas such as Pump Station, Compressor room, Furnace area, Air Cooler, etc. using AutoCAD Plant 3D and E3D.
• Coordinated with mechanical and structural departments to optimize pipe rack and sleeper routing and nozzle-platform orientation.
• Verified and updated P&ID according to the latest specifications and standards such as ASME, DIN, API & ASTM.
• Performed clash detection and resolution to ensure a clash-free model.
• Prepared support drawings, single line diagrams, load plans, piping MTOs, and 2D piping GA and isometric drawings in compliance with the Company Quality Assurance system and Company drafting manual.
• Incorporated feedback from internal and client reviews and supplier information to refine the model and drawings.
• Learned AutoCAD Plant 3D and new piping design techniques.
• Utilized various software tools such as Microsoft Office, AutoCAD Plant 3D, Autodesk Inventor, Revit, AutoCAD, and Navisworks.
● Conducted research on solar panel production processes and machinery parts such as Diffusion, Texturing, Edge Isolation, etc.
● Designed and modeled piping systems, equipment layouts, and ducts for Pump Station, Compressor room, and clean room using PDMS, AutoCAD, and Revit.
● Prepared piping material datasheets, requisitions, and technical bid evaluations in accordance with international standards such as ASME, DIN, & ASTM.
● Generated piping isometric drawings, general arrangements, and piping and duct MTOs based on the model.
● Designed HVAC system for clean room and calculated heat dissipation and thermal loads of factory
● equipment using HAP-Carrier and Psychrometric Analysis.
● Estimated the cost and material usage of the project for the piping and HVAC department.
● Collaborated with team members and stakeholders to meet deadlines and quality standards.
● Learned AVEVA PDMS, piping design techniques, material selection criteria, and spare parts classification and management.
● Applied various software tools such as AVEVA PDMS, Microsoft Office, Revit, AutoCAD,
and Navisworks.
● Engineered and implemented HVAC systems using Revit MEP with approval from the design and engineering unit.
● Designed the system layout including pipework, ducts, and control panels.
● Monitored and reported the progress and status of pipes and duct installation.
● Estimated the cost and material consumption of the project.
● Scheduled and executed the system installation.
● Improved communication and normalization skills, learned AutoCAD and Revit, and gained experience in HVAC system execution and layout design.
● Used Microsoft Office, Revit, and AutoCAD as software tools.
URL removed due to policy violation. Please contact support for further information.