أشرف الزهيري, infrastructure Project  manager

أشرف الزهيري

infrastructure Project manager

Dar Al riyadh Consultants

البلد
كندا - Burlington
التعليم
ماجستير, ادرة المشاريع
الخبرات
31 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :31 years, 9 أشهر

infrastructure Project manager في Dar Al riyadh Consultants
  • المملكة العربية السعودية
  • أشغل هذه الوظيفة منذ يناير 2014
Senior Project في Dar Al Handasah Consultants
  • المملكة العربية السعودية
  • يناير 2009 إلى ديسمبر 2013

Decide and develop the most appropriate and economically feasible engineering and construction practices for projects.
Agree upon, monitor, and follow up with the plans and schedules.
Involve throughout the development stages and present on-site during the build to oversee procedures.
Estimating a timeline for a given project and ensuring that the outlined deadlines are met as per the schedule.
Correspondence with Consultant engineer as per PM Guidance.
Provide active support to the project team in the review of finalization of various project documents and record templates.
Planning, Scheduling, Estimation and monitoring for Civil and Electrical and mechanical activity on the project

Assistant Resident Engineer
  • يناير 2006 إلى يونيو 2008
Construction Manager
  • أكتوبر 1999 إلى أغسطس 2006
Project Engineer في Ministry of Housing
  • مصر
  • أبريل 1997 إلى أكتوبر 1999
Project Manager في Abaja Trading & Construction Es
  • المملكة العربية السعودية
  • ديسمبر 1994 إلى يناير 1997

Reported to the Manager & led a Construction team

Traffic Engineer في Mr George
  • يناير 1992 إلى ديسمبر 1994

led a Traffic Team

area Manager
  • إلى

managing civil constructions & overseeing project control functions to meet project stakeholder expectations as per defined Key Performance Indicators-
Specifying project tasks & objectives including delineation of scope, budgeting, scheduling, setting performance requirements, and selecting the project participants to execute plans.
Highlighting potential delays in construction due to lack of resources such as equipment, material, shop drawings, etc and assisting in formulation of corrective actions.
Developing project schedules, finalising weekly plans for the site engineers, as well as controlling project execution.
Managing project planning & project schedules, as well as assessing the project risks.
Making manpower & equipment requests, preparing monthly logistics plan for requirements of material supplies.
Reviewing the drawing and submitting to the consultant for approval.
Attending QA-QC meetings on a rotational basis as directed by the Construction Manager & identifying potential issues, & driving the implementation process.
Monitoring safety officers for enforcing safety norms and following up on the safety rules as required to ensure that all project participants remain committed to achieving HS&E excellence in all business practices and operations.
Developing project manpower requirements & continually reviewing project progress, & recommending changes in structure and personnel, if necessary.
Optimizing the manpower, material, and equipment allocation for assigned projects, meeting budgets, & minimizing deviations between resource requirements and project forecasts.
Participating in review of mock up construction activities, generating & circulating work flow chart, authority matrices and procedures to ensure clarity of responsibility and accountability.
Managing project deliverables in line with set budgets in terms of costs, time, quality within the agreed on resources.
Coordinating site resources for better equipment throughput and designing effective strategy to improve the performance standards.
Assessing monthly performance report, verifying progress after comparing with the scheduled project plan, & resolving shortcomings if any.

Senior Project في El Seif, CCC, Saudi Bin Laden Group Al Muhandis Nizarkurdi Consulting Engineers
  • المملكة العربية السعودية
  • إلى

managing civil constructions & overseeing project control functions to meet project stakeholder expectations as per defined Key Performance Indicators-
Specifying project tasks & objectives including delineation of scope, budgeting, scheduling, setting performance requirements, and selecting the project participants to execute plans.
Highlighting potential delays in construction due to lack of resources such as equipment, material, shop drawings, etc and assisting in formulation of corrective actions.
Developing project schedules, finalising weekly plans for the site engineers, as well as controlling project execution.
Managing project planning & project schedules, as well as assessing the project risks.
Making manpower & equipment requests, preparing monthly logistics plan for requirements of material supplies.
Reviewing the drawing and submitting to the consultant for approval.
Attending QA-QC meetings on a rotational basis as directed by the Construction Manager & identifying potential issues, & driving the implementation process.
Monitoring safety officers for enforcing safety norms and following up on the safety rules as required to ensure that all project participants remain committed to achieving HS&E excellence in all business practices and operations.
Developing project manpower requirements & continually reviewing project progress, & recommending changes in structure and personnel, if necessary.
Optimizing the manpower, material, and equipment allocation for assigned projects, meeting budgets, & minimizing deviations between resource requirements and project forecasts.
Participating in review of mock up construction activities, generating & circulating work flow chart, authority matrices and procedures to ensure clarity of responsibility and accountability.
Managing project deliverables in line with set budgets in terms of costs, time, quality within the agreed on resources.
Coordinating site resources for better equipment throughput and designing effective strategy to improve the performance standards.
Assessing monthly performance report, verifying progress after comparing with the scheduled project plan, & resolving shortcomings if any.
Reviewing, evaluating, and commenting on means and methods of construction of Contractors.
Undertaking revision of billing quantity before submitting to the consultant.
Observing, reviewing, & implementing method statements.
Attending weekly client meeting to discuss work progress & performance up to final hand over inspection of works.
Organising & attending project review progress meetings to cover all relevant issues as well as reviewing daily work reports for tracking project progress, preparing snagging and outstanding work lists.
Following up on daily/ weekly work plans with the team and resolving all outstanding site issues & conflicts.
Contributions:
Spearheaded the project completion as per project specifications, and ensured customers satisfaction
Effectively filled in for other Resident Project Engineer/ Construction Manager when on leave/ vacation & achieved the project objectives within the planned time, resources, & quality parameters.
Successfully identified resources to optimize costs & ensured timely & adequate completion of all phases of following projects-
Project: Princess Noura Bint Abd Alrahman project for women in Riyadh north near King Khalid International Airport total site area around 9000000 m2 & consisted of four packages & tasked to monitor & report on two packages 3 & 4 project value SR 44 billion -
Package 3-
Elevated tank (1500 m3) irrigation water tank (80*60 m) potable water tank (60*40) drinking water tank, pump station & water treatment solid waste transfer station chiller plant boiler plant, pump room, Generator plant warehouse (120*500) data center (60*56) mosque administration & engineering office, car port & vehicle maintenance, plant nursery, l .p.g station, with Driver mess & dormitory.
Flyover bridge above airport road, underpass at main entrance, utility tunnel (4.5 km), Sewage lifting station (no 1, 2, 3), Academic bridge type (1, 2, 3), pedestrian bridge to library, Gate no, 1, 2, 3 culvert structure (no1_ no16) mssh utility buildings, fence, storm water pump station, electrical distribution (no 1_no 6) electrical culvert, & washout lifting station
Package 4- Train bridge with 16 stations each 2400m2 three floors, three pedestrian bridges, two bus terminals, & depot area with total site area 8500000 M2
Contractors

Resident Engineer في Salco El Harby Co. Petrogas
  • مصر
  • إلى

handled resources & ensured general infrastructure project completion as per the Key Performance Matrices-
Defined project scope, goals, & project deliverables in collaboration with senior management
Monitored performance of the project team as per developed indicators.
Identified resources to optimize costs & ensured timely and adequate completion of all phases of the project.
Reviewed status reports of the performance of project team members & assessed safety violations on site
Reported to design team any conflicts between the drawings and site
Implemented various operations through proper coordination and control of planning, design, estimating, contracting, and construction process.
Supervised project controls teams in the preparation and presentation of cost and schedule forecasts & all special project performance / status reviews as required.
Identified and resolved issues and conflicts within the project team.
Reviewed contractor payments as well as monitored contractor equipment to control project cost
Provided direct input to proposals, client presentations and contract negotiations
Reviewed status reports of the performance of project team members & assessed results achieved.
Attended project review meeting & reported to Construction Manager on the daily progress on site
Contributions:
Introduced best practices in the construction work and successfully met the stringent quality standards.
Introduced initiatives to ensure proper project progress with increased productivity.
Made significant contribution in successfully completing following project as per the performance parameters-
Project: storm drains in Riyadh east, north, & south, project value: SR 45 Million, Contractors

Project Manager
  • إلى
Construction Manager في Construction of tamouh factory, Cairo Construction of qana factory
  • الإمارات العربية المتحدة
  • إلى

supervised, monitored, and reported project progress throughout the project cycle as per the specific Key Result Areas-
Coordinated with stakeholders before starting project implementation & managed works throughout various phases including, construction documents, construction administration and closeout.
Developed method statement for project execution & prepared schedule plan for project execution.
Reviewed and submitted designs for consultant for approval.
Prepared manpower and equipment request and also materials request for work.
Organised meeting with staff and ensured that equipments, tools and work practises meet safety norms.
Responsibilities included reviewing contractor daily works and give comments.
Coordinated with the other disciplines and prepared snag lists for the work finished.
Allocated & followed up daily/ weekly plan with the team work and resolved problems if any.
Contributions:
Introduced initiatives to ensure proper project progress with increased productivity to manage large scale fit out works within time & as per cost control as fast as possible being considered fast track project.
Implemented steps in effective optimization of project costs using available resources
Successfully executed following projects within the set budgets and in time-
Construction of moustord factory, Cairo

Executive Director
  • إلى
Project Engineer
  • إلى

prepared schedules & executed El Shrouk city project in accordance with contract requirements & as per defined Key Performance Parameters-
Managed all company operations by directing and coordinating activities consistent with established goals, objectives, & policies.
Handled project resources- machinery & manpower on site to maximize resource efficiency & restrict costs of labor, materials, and equipment.
Coordination with the competent authorities before starting implementation
Prepared weekly plan for site engineers at the end of the week based on project forecasts.
Followed up on weekly plans with the team and resolved project challenges
Made monthly plans for materials and supplies requirements & reported on work progress
Handled design and drawing for profiles of lines and submitted to the consultant.
Prepared the billing and payment certificate.
Monitored and reviewed all aspects of in accordance with the established company procedures and expectations.
Contributions:
Maintained a successful track record to finish project within budget with satisfactory work & punctual delivery-
Project: Construction of 47 buildings, two schools, villas, 2 swimming pools with all related landscape & infrastructure over 1600000 m2 site area, project value: 35 Million Egyptian Pound

Project Manager في International Commercial Centre
  • المملكة العربية السعودية
  • إلى

coordinated project construction & managed time, cost & quality control parameters as per the specific Key Performance Indices-
Implement programs to ensure attainment of business plan for growth and profit.
Coordinated with the competent authorities before starting implementation
Prepared & reviewed weekly plan for site engineers at the end of the week to carry out work next week
Followed up on weekly plan & monitored progress on project matrices.
Made schedule for project execution including, construction documents, construction administration and closeout.
Contributions:
Made noteworthy contributions to execute Al Kahfgi Port Project, in Saudi Arabia
Project: Construction of four steel structures for trucks with area 1000m2 Administration building, supply & install truck parking with 700000 m2 freezing warehouse 600 m2 & cold warehouse 450 m2 all related landscaping & infrastructure with project value of SR 7 Million

Traffic Engineer في KSA
  • العراق
  • إلى

handled design, estimation, & execution of systems as per Key Performance Objectives-
Project: Maintenance for all traffic signals in

الخلفية التعليمية

ماجستير, ادرة المشاريع
  • في كليه الهندسه- جامعة حلوان
  • أكتوبر 2015
بكالوريوس, Construction Management & Building Quality Control
  • في Faculty of Engineering, Al Azhar University
  • يناير 1999

in

ماجستير, Engineering- Projects Management
  • في Al Jazeera International AcademyHelwan University

courses: training & obtained ICDL Certificate (2010) Completed training course modules on Primavera (ver. 2), AutoCAD, & SAP 2000, Computer network engineering lab, faculty of engineering, Cairo University (2005) Undergone training sessions on project management for petroleum (2002). Attended training programme on English language

Specialties & Skills

Management
Data Infrastructure
BRIDGES
ENGINEERING
BILLING
APPROACH
MICROSOFT POWERPOINT
ACADEMIC
BUDGETING
AUTOCAD
MICROSOFT PROJECT
MICROSOFT WINDOWS 2000

اللغات

العربية
متمرّس
الانجليزية
متمرّس