Senior Architect
Snc-Lavalin Fayaz engineering
Total des années d'expérience :21 years, 4 Mois
Position: Senior Architect, BIM Specialist & Coordinator
Report to: Department Manager, Project Lead
Responsibilities:
▪ Develop design ideas as per building (IBC 2009) & Saudi Aramco code analysis.
▪ Study feed drawings, develop Revit BIM model, and coordinate with other discipline.
▪ Coordinate design ideas with other professional’s discipline in BIM platform.
▪ Prepare Aramco Revit BIM template, parametric family, Annotations, Schedules, documentations, and MTO.
▪ Collaborate and coordination Revit architecture model with other Engineering disciplines to find out and solve clashes.
Projects:
• King Salman residential complex, maritime (LSTK project): A bunch of 14 no’s buildings prepared as per feed on Revit BIM modeling Collaborate and coordination with other discipline and submit 2D IFC drawing as well 3D model to construction support.
Position: Senior Architect, BIM Specialist & Coordinator
Report to: Department Manager, Project Lead
Responsibilities:
▪ Develop design ideas as per building (IBC 2009) & Saudi Aramco code analysis.
▪ Study feed drawings, develop Revit BIM model, and coordinate with other discipline.
▪ Coordinate design ideas with other professional’s discipline in BIM platform.
▪ Prepare Aramco and Sabic Revit BIM template, parametric family, Annotations, documentations, MTO, and construction support.
▪ Collaborate Revit architecture model with other Engineering disciplines to find out and solve clashes
Projects:
• City Commercial Port, Jazan, (Aramco): A bunch of 27 no’s buildings prepared as per feed on Revit BIM modeling and coordinate with other discipline and submit 2D IFC drawing as well 3D model to construction support.
• Sadaf Centralized Operation Building and Metal & Zone Shop Project, Jubail, (Sabic): one Operation building, one Mosque, two Metal shops building (steel structure base) preparing for IFC submittal on Revit BIM modeling with coordinate to other disciplines and submit 2D IFC drawing as well 3D model.
King Abdullah Financial District (KAFD), Parcel: 5.05 (24 Floor Office & 38 Floor Residential Tower cum G+3 Retail, Gross Floor Area 62550.0 Sq. M.) in Zone 3. Deal with the project specification and designs. Responsible for dealing with all aspects of project construction, approval of contractor and sub-contractor shop drawings, approval of contractor and sub- contractor detailing, inspection and approval of all schedules, inspection and approval of materials, etc., # As a client representative to coordinate & monitor progress and finish works in 5 Star Hotel in Information & Technology communication Complex ( ITCC ), Riyadh
Develop design ideas as per building (IBC 2009) & Saudi Aramco code analysis.
Coordinate design ideas with other professional’s disciplines.
Prepare information regarding design, specifications and materials take off, including schematics and cost estimates.
Develop Design on Revit Architecture BIN modeling & 3D Animation presentation.
Highly concentrate with health & safety base design.
4. Abdullah A. M. Al-Khodari Sons Co., Al-Khobar, Saudi Arabia. (Since 5 Feb. 2009 to 15 May 2011): - I use to deal with the work of coordination of Architectural drawings, Site follow up, Quantity survey, Checking BOQ with specification, prepare Shop drawings etc.
• King Faisal University - Al Ahsa (5 projects)
• Taibah University - Medina. (3 projects)
• Collage of Engineering - Jezan.
• Training Center Facilities of Security Task Forces in Eastern Region - Dammam.
• Airport Um-Al-Melh.
3. Vivek Bhole Group of Company, Borivali (Mumbai), India (2 Sep. 2008 to 31 Jan. 2009):
• Design and proposal of phase wise program for Government Sion Hospital. Mumbai (India)
• Design and proposal of phase wise program for Government Kasturba Hospital. Mumbai (India)
• Design and proposal of Metro Blood Bank of Government Sion Hospital. Mumbai (India)
• A 7th floor Residential Building at Mira Road, Thane (mah.) (India)
• Design and proposal Club house at Pune, Mumbai (India)
2. Ahmed Associates, Bandra (Mumbai), India (15 Dec 2006 to 30 Aug. 2008):
• A 50 bed room 4 star Hotel at Bangalore (Karnataka.)
• An 11th floor Commercial building at chakala, Anderi (E), Mumbai.
• A 75 bed room 4 star Hotel at Pune (Mah.)
• A 145 bed room 5 star Hotel at Hinjewadi, Pune (Mah.)
• A 250 bed Hospital Mira road, Thane (Mah.)
1. Skyline Architects, Neemuch (M.P.), India (2004 to 10 Dec. 2006): - Following projects are my own design projects during when I was handling my own office at Neemuch (m.p.) India.
• New Residential villa
• New Residential Interior
• Apartments building
• Civil Modifications and Interior
• Commercial and Home Interior
8. (2003) Urban Design, Institution Designing - VIII Sem.
9. (2003) Thesis Projects - "MULTIPLEX "at (Indore, M.P.) - IX Sem.
10. (2004) Training under architect in Ashwin Alva Associates, Delhi- X Sem.
My Participation in Competitions during Academic time
Second
B+