Marine Engineer
sapiem
مجموع سنوات الخبرة :11 years, 5 أشهر
The work items: Rock mounded breakwater, rock revetment, dredging, reclamation, soil improvement, quay walls(gravity caissons type), secant piles wall, floating marines, sheds, jetties, etc.
Role of work :- quality control, reviewing the construction drawing, site inspection and quantities surveying, supervision sub-contractor
=The employer:Speco 3 contractors
Position :marine engineer
The work items: Laying offshore intake pipeline, pump station, dewatering system, desalination plant
Role of work :- quality control, reviewing the construction drawing, site inspection and quantities surveying, supervision sub-contractor
=The employer:intertek engineering
Position :marine engineer
The work items: Quay wall, soil improvement (deep vibration , free impact load ), breakwater, secant piles, dredging and reclamation
Role of work :- quality control, reviewing the construction drawing, site inspection and quantities surveying
Role of work :(Technical department-bid work-Design- contractors billing, quality control, and quantity measuring schedules)
•The work items :-Rock mounded breakwater, rock revetment, dredging, reclamation, soil improvement, quay walls(gravity caissons type), floating marines, sheds, jetties, etc.
Projects: army Terminal bases
== Work Tasks
Prepare work permits needed for the execution of the site works.
Monitors, Coordinate & Control all daily relate manpower and equipment.
Prepare & Submit Request for Inspection (RFI) of completed works.
Conduct routine inspection of the completed works for quality.
Ensure all activities (Rebar, Form, Concrete, Heavy lifting, Steel structure, Etc.) are carried out in accordance with the drawings, specifications, method statement, contracts, etc.
Prepare daily progress report of the project.
Check interface items with the other contractor and coordinate each other.
Check all issued drawings and make a composite drawing to discover drawing error in advance.
Ensure Safety awareness in the work place & in the vicinity all the time.
Takes over-all technical, administrative and Financial responsibility for the project on site.
Sets objectives and prepares programs and schedules of work for construction supervision Organizes the supervision activities on site and manages staff.
Manages site supervision performance and seeks improvements in coordination with head office .
knowledgeable of the details of the contact documents ( Contract conditions, specifications, BOQ, geotechnical and other reports, drawings…).
Ensuring that preparatory engineering works including setting out for alignment and elevation are performed accurately prior to the Contractor’s work.
Liaises and coordinates with the head office, the client, the contractor and other concerned government agencies . Ensures that the contractor maintains a good planning system and that the work program is well phased .
Directs the supervision activities to ensure that the permanent works are carried out to correct line and level and that the materials and workmanship conform to specifications and intervenes to solve problems and resolve obstacles.
Carries out a daily check of the contractor’s Daily Report that shows the planned activities and rejects or accepts the Contractor’s request for work approval. Materials, shop drawings and samples shall be reviewed for approval within two weeks of submittal.
Reviews and approves monthly certificate ensuring that quantities included are correct.
-Meeting(Quality meeting(weekly), time schedule and cost meeting(monthly), client meeting, etc
Project :-SR 600 million ($160 million) for Quay wall600m-long with an alongside depth of 16m and 450, 000 square meters of onshore facilities., Dredging by Hopper Dredger, Suction Dredger -and Grab Dredger, Revising of Existing Breakwater, Reclamation& Ground Improvement with dynamic compaction by vibro-prop., and free impact load to improve the quay rock foundation, Rock revetment and Rock Armor
-Breakwater