Total Years of Experience: 22 Years, 6 Months
November 2018
To Present
Senior Electrical Engineer &Acting MEP Project Manager
at M/s. Delta Al Emarate Building Contracting LLC, Dubai.
Location :
United Arab Emirates - Dubai
The projects that shared it for execute : -
** Full Package of the Project I Love Florence Tower (Commercial &Residential B+G+3P+34+R.F) - Main
Contract Works, Plot No. BB.A02.016, Business Bay, Dubai, UAE, Consultant: M/s. LACASA Architects and
Engineering, Client: - M/S Dar A; Arkan Properties LLC.
*Full Package of the 413 Villas at Cluster “Centaury” (VP7) and 35 Villas at Cluster “Acuna” in Phase 2 of
the “AKOYA Oxygen” Master Development located on Plot No. 9160101, Al Yufrah 2, Dubai, UAE, (Plot
numbers as per attached list) @ Akoya Oxygen, Consultant: M/s. ACE International consultant Engineering,
Client: - M/S Front Line investment Management Co. DAMAC .
* Full Package of the (G+3) Primary School Building on Plot no. 424-4461, Eid Musallah on Plot no. 424-4462 and the Public Parking Area on Plot No. 424-4467 at Al Warqa’a Fourth, Dubai - with LACASA design Consultant &M/s. Sustainable Architectural & Engineering Consultants
, Client: - M/s. The School of Research Science .
** Full Package of the Project I Love Florence Tower (Commercial &Residential B+G+3P+34+R.F) - Main
Contract Works, Plot No. BB.A02.016, Business Bay, Dubai, UAE, Consultant: M/s. LACASA Architects and
Engineering, Client: - M/S Dar A; Arkan Properties LLC.
*Full Package of the 413 Villas at Cluster “Centaury” (VP7) and 35 Villas at Cluster “Acuna” in Phase 2 of
the “AKOYA Oxygen” Master Development located on Plot No. 9160101, Al Yufrah 2, Dubai, UAE, (Plot
numbers as per attached list) @ Akoya Oxygen, Consultant: M/s. ACE International consultant Engineering,
Client: - M/S Front Line investment Management Co. DAMAC .
* Full Package of the (G+3) Primary School Building on Plot no. 424-4461, Eid Musallah on Plot no. 424-4462 and the Public Parking Area on Plot No. 424-4467 at Al Warqa’a Fourth, Dubai - with LACASA design Consultant &M/s. Sustainable Architectural & Engineering Consultants
, Client: - M/s. The School of Research Science .
July 2013
To November 2018
Senior Electrical Engineer & MEP Construction Manger
at M/s. Sedico General Contracting L.L.C, Dubai.
Location :
United Arab Emirates - Dubai
The projects that shared it for execute: -
1- G+9 GOLF Apartments (3 clusters) Akoya by Damac. At Dubai - Motor City with AECOM
Consultant &ATK Consultant, Client: - Damac .
2- Clubhouse -Trump international Golf club - At Dubai - Motor City with Dynamic Engineering
Consultant, Client: - Damac .
3- Falcon City of Wonders Project for Construction of Hyper market, Medical center, Mosque, nursery At Dubai - Falcon City.
4- Residential Building, G.F + 5 Parking + 32 Floors Typical (MAG-230), At Dubai - City of
ARABIA with Design Engineering Consultant, Client: - MAG Group.
1- G+9 GOLF Apartments (3 clusters) Akoya by Damac. At Dubai - Motor City with AECOM
Consultant &ATK Consultant, Client: - Damac .
2- Clubhouse -Trump international Golf club - At Dubai - Motor City with Dynamic Engineering
Consultant, Client: - Damac .
3- Falcon City of Wonders Project for Construction of Hyper market, Medical center, Mosque, nursery At Dubai - Falcon City.
4- Residential Building, G.F + 5 Parking + 32 Floors Typical (MAG-230), At Dubai - City of
ARABIA with Design Engineering Consultant, Client: - MAG Group.
November 2011
To June 2013
1- Electrical Project Engineer 2- Electrical Project Manager
at M/s. Emirates Code Contracting L.L.C, Dubai.
Location :
United Arab Emirates - Abu Dhabi
The projects that shared it for execute: -
1- Infrastructure, Roads, Landscaping & External Works Contract No. MW-OU-081-2010, Abu Dhabi Air Base - United Arab Emirates (3 Nos. Of Electrical Substations) .
2- Construction of 22 nos. of buildings for General Command of the Military Works, Contract No. MW-OU-057-2010.
3- Supply & Installation of 11kV Cable Works for Bawabat Al Sharq Commercial & Residential
Complex- Phase 1 (Villas & Blocks)
& Phase 2 (Villas /School /Temporary Chillers).
With M/S Banyias development & investment Co. .
1- Infrastructure, Roads, Landscaping & External Works Contract No. MW-OU-081-2010, Abu Dhabi Air Base - United Arab Emirates (3 Nos. Of Electrical Substations) .
2- Construction of 22 nos. of buildings for General Command of the Military Works, Contract No. MW-OU-057-2010.
3- Supply & Installation of 11kV Cable Works for Bawabat Al Sharq Commercial & Residential
Complex- Phase 1 (Villas & Blocks)
& Phase 2 (Villas /School /Temporary Chillers).
With M/S Banyias development & investment Co. .
March 2009
To November 2011
1- Electrical Project Engineer 2- construction Manager
at M/S Matrix Construction
Location :
United Arab Emirates - Abu Dhabi
The projects that shared it for execute:-
1- ADCO Contract NO: 7470.01/EC 10750, CONSTRUCTION WORKS FOR NEB TIE-INS AND CLUSTER MODIFICATIONS
2- ADCO Contract No. 7489.01/EC 10752, Enhancement of Corrosion Injection at ASR Gas Production Wells at BAB.
3- ADCO Contract No. 7489.01/EC 90141, Construction Work for 12 Gas Producer Tie-ins and Flow Line Segregation for Units 6 & 7 Wells at BAB.
4- ADWEA Contract No. G3923 - Supply and Installation of the Automated Meter Reading (AMR) Technology System in Abu Dhabi & Al Ain Area ( Responsible for Al Ain Area ).
- 5- ADWEA Contract No. G4204 - Amplight Expansion project for ADDC and AADC (Responsible for Al Ain Area).
1- ADCO Contract NO: 7470.01/EC 10750, CONSTRUCTION WORKS FOR NEB TIE-INS AND CLUSTER MODIFICATIONS
2- ADCO Contract No. 7489.01/EC 10752, Enhancement of Corrosion Injection at ASR Gas Production Wells at BAB.
3- ADCO Contract No. 7489.01/EC 90141, Construction Work for 12 Gas Producer Tie-ins and Flow Line Segregation for Units 6 & 7 Wells at BAB.
4- ADWEA Contract No. G3923 - Supply and Installation of the Automated Meter Reading (AMR) Technology System in Abu Dhabi & Al Ain Area ( Responsible for Al Ain Area ).
- 5- ADWEA Contract No. G4204 - Amplight Expansion project for ADDC and AADC (Responsible for Al Ain Area).
May 2007
To March 2009
Senior Electrical Engineer
at M/S Emaret Al Sharq Architeure Consultant
Location :
United Arab Emirates - Dubai
The projects that shared it for execute: -_
1- Commercial and Office building plot no. (214-657) Al Garhoud, Dubai.
2B+G.F+ 10 Floors Building (13 M.Watts) with AWQAF and Minors Affairs
Foundation Client& BU Haleeba (BHC) cont.co. Main Contractor.
2- Commercial Residential Villas plot no. (251-4697 ) Mirdif, Dubai
G. + 1 Floors (30 Nos.) With AWQAF and Minors Affairs Foundation Client &CONDOR cont.co. Main Contractor.
3-Commercial Residential building for GERMAN SPORTS TOWER plot no. (682-1293) NAD AL SHIBBA (DUBAI SPORTS CITY)
B. +Gr. +14 Floors Building with PAXINO INTERNATIONAL (FZE) Client,
MAJED HILAL Cont. co. Main Contractor.
1- Commercial and Office building plot no. (214-657) Al Garhoud, Dubai.
2B+G.F+ 10 Floors Building (13 M.Watts) with AWQAF and Minors Affairs
Foundation Client& BU Haleeba (BHC) cont.co. Main Contractor.
2- Commercial Residential Villas plot no. (251-4697 ) Mirdif, Dubai
G. + 1 Floors (30 Nos.) With AWQAF and Minors Affairs Foundation Client &CONDOR cont.co. Main Contractor.
3-Commercial Residential building for GERMAN SPORTS TOWER plot no. (682-1293) NAD AL SHIBBA (DUBAI SPORTS CITY)
B. +Gr. +14 Floors Building with PAXINO INTERNATIONAL (FZE) Client,
MAJED HILAL Cont. co. Main Contractor.
March 2004
To May 2007
Electrical Project Engineer
at M/S AL Basha palace Est.for Eng. Construction
Location :
United Arab Emirates - Abu Dhabi
_ Project Responsibilities and Authorities:-
* Preparing and designing the Shop Drawings, Arranging the submittals for all the materials which we need in the projects & getting approval from the Clint, consultant & Authorized government Dept., Establishment & Handing over for all electrical works & low current systems and Systems , Maintenance during Maintenance period.
*Authorized as Electrical engineer from all Government Dept. like as Abu Dhabi Distribution Company, Al Ain Distribution Company, Abu Dhabi Municipality & Town Planning Dept.Consultants, Private Department, Dealing with them.
The projects that shared it for execute:-
1- Residential & Commercial for Seven to Twelve Floors Building & Villas Complex for Private Clients with Mass Consultant, Construction Engineering Consultants , Architectural & Engineering Consultants & Al Batten Engineering Consultant & &Ahmed Salem Suwaidan cont.co. , Al Shuwehat General Cont. co. Main Contractor.
2- National Bank of Abu Dhabi (E25, Plot 31) Eight Floors Building with Arab Consultant Architects Engineering, Gulf Number Cont. Main Contractor.
3- Mosque & Shopping Complex in (M16, M21, M32, and M37) Musafah Abu Dhabi
With Abu Dhabi Municipality & Town Planning Dept. Consultants, Gulf Pioneer General Cont.Co., Spark General Cont.Co. Main Contractor. .
4- SH.Mariam Palace (W50, Pot Palace)With Private Department for H.H Sheikh Zayed Bin Sultan Al Nahyan Works Department, Pact General Cont. Main Contractor.
5- Al ZAYTONA SCHOOL (ALMarfaa -Abu Dhabi) With Altorath Engineering Consultants, Gulf Pioneer Main Contractor. 6- Al Bashair Private School (Musafah Abu Dhabi ME12-Plot-11) with Architects Interior Designers Architectural Consultancy Project Manager, Lines & Dimensions Consultant . AL HUDA - Main Contractor .
7- Maintenance of Electrical equipments in an electrical power substation at AL Ain city near Al Noor Hospital.
* Preparing and designing the Shop Drawings, Arranging the submittals for all the materials which we need in the projects & getting approval from the Clint, consultant & Authorized government Dept., Establishment & Handing over for all electrical works & low current systems and Systems , Maintenance during Maintenance period.
*Authorized as Electrical engineer from all Government Dept. like as Abu Dhabi Distribution Company, Al Ain Distribution Company, Abu Dhabi Municipality & Town Planning Dept.Consultants, Private Department, Dealing with them.
The projects that shared it for execute:-
1- Residential & Commercial for Seven to Twelve Floors Building & Villas Complex for Private Clients with Mass Consultant, Construction Engineering Consultants , Architectural & Engineering Consultants & Al Batten Engineering Consultant & &Ahmed Salem Suwaidan cont.co. , Al Shuwehat General Cont. co. Main Contractor.
2- National Bank of Abu Dhabi (E25, Plot 31) Eight Floors Building with Arab Consultant Architects Engineering, Gulf Number Cont. Main Contractor.
3- Mosque & Shopping Complex in (M16, M21, M32, and M37) Musafah Abu Dhabi
With Abu Dhabi Municipality & Town Planning Dept. Consultants, Gulf Pioneer General Cont.Co., Spark General Cont.Co. Main Contractor. .
4- SH.Mariam Palace (W50, Pot Palace)With Private Department for H.H Sheikh Zayed Bin Sultan Al Nahyan Works Department, Pact General Cont. Main Contractor.
5- Al ZAYTONA SCHOOL (ALMarfaa -Abu Dhabi) With Altorath Engineering Consultants, Gulf Pioneer Main Contractor. 6- Al Bashair Private School (Musafah Abu Dhabi ME12-Plot-11) with Architects Interior Designers Architectural Consultancy Project Manager, Lines & Dimensions Consultant . AL HUDA - Main Contractor .
7- Maintenance of Electrical equipments in an electrical power substation at AL Ain city near Al Noor Hospital.
September 2001
To March 2004
Electrical Engineer
at Electrical Engineer in Arabian Reclemination Fields Co. (Construction Branch).
Location :
Egypt - Cairo
The projects that shared it for execute:-
1- Road Infrastructure (Street light Electrical cable laying and intercommunication network cable laying, street light poles installation).
2- Building for MR.Ahmed Amer Egypt-Al Bhara Five Floors. 3- Operation & Maintenance of Plant Asphalt Mixing.
1- Road Infrastructure (Street light Electrical cable laying and intercommunication network cable laying, street light poles installation).
2- Building for MR.Ahmed Amer Egypt-Al Bhara Five Floors. 3- Operation & Maintenance of Plant Asphalt Mixing.
Share on Facebook
Share on Twitter
Share Via Email