Factory Manager
techno coat company for industry(powder coating for aluminum and metal
مجموع سنوات الخبرة :28 years, 2 أشهر
aluminum and metal powder coating
direct supervision of the project and following its developments step by step form start to finish -supervision erection all mechanical equipment (hvac, plumbing)in building and fire fighting systrm -supervision erection 8 water tanks capacity each one 30000 cubic meters . checked received materials (MRI) .follow Steel structure painting of tanks . Pre-engineerd building &huge water tank
Blasting and painting -pump station
following all steel jobs
•The erection and painting of the steel structure works activities are carried out according to specifications and drawings.
•Work progress is carried out according to the planned program and all the equipment required to execute the works are available as per the project planning and are in good condition.
•Coordination with the Consultant, Site Engineer, Safety Engineer and Subcontractors for the safe and proper execution of the work.
•Specific attention is paid to all safety measures and quality control in coordination with Safety Engineer and QC Engineer and in line with HSE plan and Quality plan.
, knowledge in steel structure fabrication, pre-engineerd building, crude oil tank, pressure vessel, knowledge all kind of welding, sand blasting, painting -maintain enforce safe working environment.- plan and schedule labour, material and equipment efficiently and within set times frames.- skilled to solve technical problems
Responsible for managing the construction projects at site which involves overseeing assigned project schedules and project costs, administering contracts, interfacing with contractors and clients, ensures the implementation of quality control and safety programs through proper execution of competencies such as decision making, leadership, and technical skills and management functions to achieve projects completion targets.
PLAN TO VISIT ALL ACTIVE PROJECTS, SUPERVISION ERECTION PRE-ENGINEERD BUILDINGS - SOLVE ALL TECHNICAL PROBLEMS IN SITE
FABRICATION, ERECTION, ALL STEEL WORKS ( HYDROLUIC TEST.SAND blasting, PAINTING CRUDE OIL TANKS, PIPE RACK AND PIPE LINE- installation of ductile and cast iron pipe line.also quality control of batch plant
MANAGER WATER STATION pump and water distribution plant. maintenance pump