اشوينAshwin Karia, Engineer

اشوينAshwin Karia

Engineer

Asteco Property Management LLC

البلد
الإمارات العربية المتحدة - دبي
التعليم
دبلوم, Electrical Engineering
الخبرات
30 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :30 years, 5 أشهر

Engineer في Asteco Property Management LLC
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ أكتوبر 2014

Researched best value proposition for Energy Saving of the entire Ibn Batuta Office Building and Serviced apartment to more economical, cost savings through other initiatives.
• Planned and executed initiatives to streamline day to day operation at all site.
• Planned and executed cost saving measures in daily and annual facilities management tasks, in order to reduce expenditure And high standard Services to all factors.
• Initiated standard PPM schedules and KPI’s to ensure works are completed on time and in the correct manner, thus increasing service life of critical equipment.
• Initiated and Completed CCTV and Access control system at projected buildings.
• Initiated to develop and modify communication system by CAT-6 cable to Fiber Optic cable at Office building through DU telecommunication.
• Initiated to modify present Fire alarm system and connected with DCD x 7 online systems.
• Initiated to upgrade of BMS System to utilize maximum Equipments efficiency.
• Initiated to upgrade of RMS System at resident building to improve Energy saving and efficiency.



Proven Job Roles & Responsibilities:

• Currently working for 2 prestigious contracts of ASTECO
• Efficiently handle critical tasks and assignments throughout portfolio.
• Ensure, projects are following agreed timelines and budgets.
• Liaise with Govt. Authorities as required in order obtaining required permit and permissions for works throughout portfolio.
• Recognized as an efficient, analytical, problem solver with excellent Facility management skills and time management.
• Preparation and presentation of annual budget, including capex.
• Supervise and coordinate activities of external contractors, for hard and soft services, and also fit out of commercial spaces.
• Project management for fit out works, which invoices subdividing large offices into small office spaces.
• Preparation of management reports on a monthly basis, which include details of works carried out, adherence to approved budgets, and other relevant details.
• Carry out routine inspection of all areas of property in order to maintain the required level of service.
• All other basic function of a facilities manager and project manager.


Team Management:

• Managing & coordinating with direct & indirect staffs reporting to me & also manage all outsourced services.
• Motivate and Lead employees to execute and perform job responsibilities for effective productivity while maintaining a high degree of moral.
• Ensure routine inspection to sites are carried out in timely manner to ensure quality, schedules & Safety measures are achieved.

Electrical Engineer في Sidhee Cement Ltd
  • الهند - راجكوت
  • مارس 1987 إلى ديسمبر 2007

Handled responsibilities for 5MW X 6 Nos. MWM DG Set installation project, electrification work and centralized AC/ Split AC system with ducting work.
• Involved and contributed in the successful completion of electrification job with power distribution to internal wiring for a residential project including hospital and school.
• Execution of central AC system installation with design & layout of building with offices, training/conference hall including Computer LAN system ( to, Project Value: Rs. 2.3 Corer)
• Ensured compliance with ISO QMS, ISO0 EMS and worked in ERP environment.
• Operation and Maintenance of:
• Centralized AC/Package AC/Window/Split AC and AC/DC Motors.
• VCB, ACB, SF6 Breakers, with all protective systems like earth fault, differential protection, over load, under/ over voltage protection, over frequency short circuiting protection, etc.
• Complete lighting & refrigeration, AC system of plant, lab equipment’s & residential complex.
• Maintenance, breakdown analysis and testing of fraction KW to KW 3-phase motors and various types of single phase motors & pumps in the workshop.
• Testing & maintenance of Power & Distribution Transformers, overhauling of HT/ LT/ Motors, Generators, LRS, GRS.
• Maintenance, erection, commissioning and testing of LT Panel with all protective systems, KVA/ KVA emergency DG Sets.
• Manpower Management:
• Leading a team of supervisors/technicians and ensuring high motivation levels on the floor.
• Coordination with HR functions for training in technical skills and health & safety.

في Better Homes Property Management LLC
  • الإمارات العربية المتحدة
  • إلى

Support the Property Management team in technical matters.
Develop SLA’s and ensure KPI’s are monitored on regular basis.
Analyze data from reports and direct teams in order to improve performance.
Review quotes for refurbishment and other works to be carried out.
Manage turnover of vacant units.
Prepare management reports detailing works completion and adherence to approved budgets.
Clear approvals for payment based on work completion reports etc.

Maintenance Engineer في Asteco Property Management LLC
  • الإمارات العربية المتحدة
  • إلى

Basic Facility Management Tasks
In charge of Managing Buildings in Discovery Gardens, Ibn Battuta Gate Office Building & Residence.
Manage Fit out of Office spaces, to sub divide into smaller offices.
Tendering for service providers.
Liaise with Govt. Authorities as and when required for NOC’s and permits.
Manage Robotic parking facility with a capacity of over cars.

Site In-charge

في ETA (M&E
  • إلى

Managing MEP maintenance of Discovery Garden (Residential/Commercial Buildings).
• Deputed at Burj Khalifa as a Site in-Charge from Feb. to April for all HVAC job for compilation and DLP maintenance in collaboration with Hitachi and Voltas HVAC Team.
• Managing a team of technical workforces with men’s and materials for all building equipment’s Reactive/Preventive maintenance as per manufacturer standards.
• Analyzing major breakdowns & implementing of preventive maintenance finding and corrective action plans.
• Ensuring energy conservation through monitoring consumption and controlling utilities consumption demands.
• Planning the inventory of spares, storage and use of material to reduce expenses & wastage.

الخلفية التعليمية

دبلوم, Electrical Engineering
  • في AIIM
  • يوليو 1984

courses: Certify Facility Manager Program as per IFMA guideline Chicago Institute Dubai-

Specialties & Skills

Facility Management
Maintenance
Chillers
Front Office
ADOBE STREAMLINE
AMBULANCE
BUDGETING
CABLEADO
CONTRACT MANAGEMENT
DECISION MAKING
DISEÑO DE LA DISPOSICIÓN

اللغات

الانجليزية
متمرّس
الهندية
متمرّس

التدريب و الشهادات

First Aid (تدريب)
معهد التدريب:
Government Authority
تاريخ الدورة:
April 1992
المدة:
72 ساعة

الهوايات

  • Wally ball player