عاصف عمران, Environmental Specialist

عاصف عمران

Environmental Specialist

China Railway Major Bridge Engineering Group Co. Ltd.

البلد
بنجلاديش
التعليم
ماجستير, Environmental Science and Management
الخبرات
11 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :11 years, 9 أشهر

Environmental Specialist في China Railway Major Bridge Engineering Group Co. Ltd.
  • بنجلاديش
  • أشغل هذه الوظيفة منذ ديسمبر 2015

On behalf of Main Contractor: (Padma Multipurpose Bridge Project, PMBP). 3 B $.
• Conduct environmental monitoring as per CEAP- Construction Environment Action Plan, which is formulated from the findings of project’s EIA and EMP in the phase of feasibility study.
• Monitoring off-shore marine construction as well as ground working group and workshops.
• Qualitative monitoring; management of general waste from vessel and ground, oil and grease storing and handling, storing and recycling of Grouting materials, collection and treatment of Piling soil, management of bentonite treatment facility, chemical storage, hazardous waste storage and general waste disposal pit, maintain log book for waste generation and accidental spillage.
• Disposal of dredged materials, management of Containment bund, internal sewerage management, Camp compliance condition, landscape rehabilitation after construction.
• Monitor off shore construction activities; concreting, load test, base grouting, PD test and hammering of pile driving operation etc.
• Test supervision and analyze of Quantitative parameters; Ambient Air Quality, Indoor Air Quality, Surface - Ground and Drinking water, Dredge spoils, Dredge effluent Noise measurement (above and under water), bathymetric survey and weather data.
• Erosion Control, protection of private land, Wetland protection regarding fisheries and wildlife.
• Participate bimonthly all stakeholder progress meeting and bimonthly HSE meeting.
• Prepare monthly report, power point presentation based on monitoring.

Environmental Specialist في IRCON International Ltd. (Govt. of India Undertaking).
  • بنجلاديش
  • أشغل هذه الوظيفة منذ يناير 2016

On behalf of main contractor: (S&T Project ISD - DSN of Bangladesh Railway); Client: ADB
• Monitor and supervise the civil work in regard to contract’s environmental clauses. Ensure contractor’s responsibility of health and environmental safety as per ADB’s requirements.
• Supervise and analyze the quantitative testing; Drinking water, Ground water, and Noise level. Other parameters include waste management, oil handling, site clean-up, and structural slope protection.
• Follow the safety procedure of installing of signaling and OFC cable with minimum impact to nature.
• As per monitoring specified in project EMP, prepare monthly environmental progress report with EMWS, attend monthly progress meeting.

Environmental Specialist في China Railway Group Ltd. CREC
  • بنجلاديش
  • أبريل 2013 إلى مارس 2016

Main Contractor: (Tongi to Bhairab Bazar Double Line Project, TBDLP); 320 M $.
• All kinds of technical decision making, budgeting and financial planning of “CREC- Safety and Environment” department and supervising the sub-contractors.
• Maintain an “Emergency Response Plan” and “Investigation and Reporting” in any incident occur.
• Participate every technical meeting with officials of stakeholders; Bangladesh Railway, CSC, and ADB.
• Prepare monthly environmental report based on inspection on several environmental parameters that specified in EMP; hydrology and flood pattern, navigation routes, drainage congestion, erosion protection, landscape rehabilitation, worker’s health and safety, workforce camp condition, waste management, wildlife availability, fish migration, and quantitative testing.
• Analyze and supervise quantitative Testing; AAQ, surface and ground water and noise level.
• Conduct annual environmental audit with International environmental specialists of different stakeholders. Analyze the situation in the aspect of Baseline condition mentioned in IEE and EIA.
• Finalizing contract/bidding document - environmental safeguard part for other possible projects.

Consultant - Environment في Environment and Resource Analysis Center (ENRAC) Ltd.
  • بنجلاديش
  • ديسمبر 2015 إلى يناير 2016

1.Conduct reconnaissance survey - physical environment part for Dhaka to Chittagong Expressway project. 2. Guide and monitor Environment and GIS team for primary data collection from field. 3. Analyse primary and secondary data for physical environment. 4. Prepare Leopold matrix, Construction monitoring checklist, EMWS Checklist. 5. Review and finalize the Feasibility Study Report, Environment Part.

Environmental Survey Team Member في Green World Communication Ltd.
  • بنجلاديش
  • يناير 2013 إلى مارس 2013

• Carry out a survey on environmental degradation due to plastic wastes at Hatirjheel Lake dumped by the visitors. Find out the sources of various emissions from sewerage lines, residual of constructing activity, emission from traffic etc.
• Identifying the possible environmental impacts like covering of lake bed with plastics, rise of water logging at connecting point with other lakes. Identifying degree of magnitude like calculate water holding capacity of the lake, approximate time for bed covering with plastics, difficulties that come in monsoon period. The litter deposited at the lake and embankment runs a high risk to connect water in monsoon.
• Prepare a management plan to protect Hatirjheel Lake resulting from plastic wastes. This include identify critical spot, study and evaluate the maintenance program. Formulate a time frame to collect wastes from lake bed and embankment before monsoon.

Internship في Ace Consultants Ltd, A subsidiary farm of SMEC International Pty Ltd, Australia
  • بنجلاديش
  • فبراير 2012 إلى مايو 2012

• Assist the team members to conduct EIA (Environmental Impact Assessment) of the “Majhgram to Dhalarchar via Pabna New Rail Line Project”.
• Conducting interviews and Focus Group Discussions (FGD) among the stakeholders to inform about the possible environmental constrain that would follow by the project and the strategies taken to lessen the effects. The impacts are land acquisition, heavy construction works, heavy equipment mobilization, air and water emission as residual of construction, noise pollution in operational phase etc. Managing strategies included monetary compensation, providing sound barrier, air and water quality monitoring etc.
• Assist team members in conducting baseline survey of the Socio-economic status of project area. That includes primary data collection of land use pattern and demography of project area. Land use patterns define agricultural field, public land, private land, forest and water body of the area. Data used for calculating the compensation pattern and amount given to the affected people.
• Preparing graphs, charts using the data collected from the baseline survey

الخلفية التعليمية

ماجستير, Environmental Science and Management
  • في North South University
  • أبريل 2016
بكالوريوس, Environmental Science
  • في North South University
  • نوفمبر 2012
الثانوية العامة أو ما يعادلها, Business Studies
  • في Notre Dame College
  • يونيو 2007

Specialties & Skills

Environmental Consulting
Environment Modeling
Environmental Monitoring
Safety Management
Environmental Impact Assessment
SPSS statistics V 17, ARC GIS 9.2
Weight Scaling Checklist, Matrix diagram, Environmental management work schedule, Network diagram
Formulate IEE , EIA , EMP, EMWS Report of a project
• Microsoft Office applications (Word, Excel, Power point, Outlook)
decision making with analytically reasoning

اللغات

الانجليزية
متمرّس
الفرنسية
مبتدئ
العربية
مبتدئ

العضويات

NSU Environmentalists
  • Member
  • January 2012

الهوايات

  • Reading book of various subjects.
    participating many debates, published many article through electronic media regarding environment, politics, international relation, religion etc.