Senior Electrical Engineer
Saudi Architects Consultants
مجموع سنوات الخبرة :10 years, 4 أشهر
Projects:
• WWE Experience, BLVD City Riyadh - Client SELA
• PlayLand, BLVD City Riyadh - Client SELA
Responsibilities and Achievements:
• Monitored construction contractors work and electrical installations and testing activities.
• Monitored and reported contractors performance on all aspects of the constructor works to include health and safety, KPI compliance and any other duties assigned by senior management.
• Witnessed contractors quality control inspection to ensure that the permanent work is constructed
according to the contract, applicable codes, standards, approved drawings and standards.
• Witnessed all testing, pre-commissioning, commissioning and startup activities to assure contractors
compliance with the approved plans and procedures.
• Reviewed contractors submitted shop and as built drawings, material submittals, tie-in procedures,
project schedules and work permit and coordinate with the concerned department for obtaining their
approval and/or comments.
• Reviewed contractors electrical quality assurance and quality control programs, ITPs, installation,
testing, pre commissioning and commissioning procedures for electrical works and cable works and
provide comments for transmittal to the contractor.
• Arranged meetings between contractor and concerned department to resolve interfacing problems
during construction.
• Organized, coordinated and conducted in conjunction with the concerned departments acceptance
inspection and re inspections of the completed permanent work until all deficiencies are corrected and
signed off.
• Reviewed contractor invoices for correctness of installed quantities for the electrical portion of
permanent works.
Projects: UDECO, VERONA, MDCP, Multan International Airport, Sukkur International Airport
Responsibilities and Achievements:
• Designed Power and electrical systems for underground facilities, buildings and Tunnels.
• Designed 2.5 MW Standby Diesel power plants specifically tailored for Tunnel facility
• Designed 11 KV Area Substations for various tunnel facilities, buildings and underground facilities.
• Conducted electrical calculations and made precise components selections
• Coordinated effectively with architects, structural engineers and mechanical engineers as well as other
design consultants.
• Provided supervision and guidance to Electrical Engineers and AutoCAD Technicians.
• Checked and verified CAD works under my supervision
• Performed arithmetical checks and independent design reviews to ensure accuracy and compliance.
• Ensured the correctness and accuracy of work and the teams output.
• Successfully completed engineering work within the agreed-upon timelines
• Maintained strict adherence to QA procedures and advised Engineers/Technicians accordingly.
• Collaborated closely on a day-to-day basis with other members of the design team for seamless coordination.
• Compiled and meticulously evaluated tender documents.
• Witnessed Factory Acceptance tests (FATs) of Power Transformers, HV and LV Control Panels, Relay panels and LV Switchgear.
• Provided detailed reports to higher management on the performance of management systems and recommended improvements
• Successfully managed interface meetings with different stakeholders
• Demonstrated problem-solving abilities and developed innovative solutions.
• Proficient in minute and report writing, ensuring clear communication and documentation.
Projects:
• Obayer Residential Complex, Obayer Resid. Complex Co.-KSA
• Arab National Bank, Head Quarters-KSA
• Jeddah Modon Projects-Jeddah, Client: Saudi Industrial Property Authority.
Responsibilities and Achievements:
• Supervised installation and commissioning of different electrical systems such as Fire Detection and
Suppression Systems (FDSS), Access Control Systems (ACS), CCTV Systems and
• Provided on-site supervision and technical support for electrical construction activities, including installation, testing and commissioning of electrical systems and equipment.
• Collaborated with Project managers, contractors and subcontractor to ensure that electrical works are
executed according to project plans, schedules, and budget constraints.
• Conducted regular site inspections to monitor progress, identify potential issues and ensured
compliances with project specifications, quality standards and safety regulations.
• Reviewed and approved electrical shop drawings, material submittals and method statements submitted by contractors and subcontractors.
• Coordinated with other disciplines such as Civil, Mechanical and Architecture to ensure integration and coordination of electrical works with overall project requirements.
• Resolved technical issues, discrepancies and conflicts related to electrical design and construction activities and provided timely solutions to keep the project on track.
• Prepared daily weekly and monthly progress reports, highlighting key accomplishments, challenges and upcoming activities.
• Conducted Site meetings with project stakeholders, including clients, contractors and regulatory authorities, to discuss project progress, issues and resolutions.
• Ensured adherence to relevant codes, standards and regulations governing electrical construction works in KSA
• Mentored and trained junior engineers and site staff, providing guidance, support and technical
expertise to enhance their skills and performance.
Projects: Substations, Buildings, and infrastructure projects
Responsibilities and Achievements:
• Supervised all Electrical, ELV, & ICT works to ensure they were carried out as per approved shop drawing and within the time frame and budget of the approved construction program.
• Estimated quantity for electrical services as per contract and site requirement.
• Managed subcontractors and vendors for different projects.
• Reviewed shop drawings for accuracy and compliance with the specification, design.
• Planned day-to-day work that needed to be carried out by subordinates including Scheduling of activities, assigning tasks to groups or individuals.
• Inspected material and workmanship quality to satisfy that work is completed with given standards.
• Coordinated with QA/QC department acceptance of the executed work.
• Witness and verified different cable and substation tests.
• Supervised installation and commissioning of different electrical systems such as Fire Detection and
Suppression Systems (FDSS), Access Control Systems (ACS), CCTV Systems and Public Address
Systems (PAS).
• Coordinated with the consultant for the close out documents (RFI, RFIA, MIR, SOR, NCR).
220KV Grid Station Jalozai, Peshawar
Responsibilities and Achievements:
• Supervised and lead a team of 10 to 15 members and collaborated for scheduled electrical Testing and
Maintenance work involving sequential shutdown of substation and switching operations ensuring that load gets supply from an alternate or standby substations; performed equipment testing and
replaced faulty components/equipment.
• Utilized test tools, technical manuals, system drawings and electrical schematics for troubleshooting equipment while communicating with NPCC (National Grid) team for excellent collaboration.
• Improved performance by providing training to the technical team and implementing strict internal
control
• Troubleshooting faults in electrical DBs, HVAC control system & power supply
• Preventive maintenance of transformers, generators and UPS
• All types of motor protection circuit breakers (MPCBs), contactors, relays & HVAC control circuits
• Maintenance of distribution HT lines, LV lines, proper load distribution and maintaining proper
voltage regulation for consumers
• Maintenance of battery banks and PF correction panels
• Supervision of Unit Lighting installation and Electrical power monitoring system
• Calibration and Testing of Meters (Ammeters, Voltmeters, Power Meters, Energy Meters and other
Instruments)
• Preventive maintenance of VCBs, ACBs, Sync Panels and ATS
• Commissioning of UPS and Battery System
Multi Agent coordinated Control of Power System to enhance Power System Stability
Load Automation Using Pic Microcontroller
لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.