AVIK داتا غوبتا, OPERATIONS MANAGER

AVIK داتا غوبتا

OPERATIONS MANAGER

ASYAD QATAR

البلد
قطر - الدوحة
التعليم
بكالوريوس, Electrical & Electronics Eng
الخبرات
31 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :31 years, 1 أشهر

OPERATIONS MANAGER في ASYAD QATAR
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ يوليو 2018

STRATEGIES TO GIVE SUSTAINED OVERALL BUSINESS GROWTH FOR AN ORGANISATION
OVERALL SUMMARY:
 GRADUATE ELECTRICAL & ELECTRONICS ENGINEER MAJORING IN HIGH VOLTAGE
ENGINEERING, ILLUMINATION ENGINEERING & BIOMEDICAL ENGINEERING
 POST GRADUATE DIPLOMA IN COMPUTER APPLICATIONS
 26 YEARS OF WORK EXPERIENCE
 PLANT ENGINEERING, INSTRUMENTATION, PROJECT IMPLEMENTATION, INDUSTRIAL
AUTOMATION, CAPTIVE GENERATION, ELECTRICAL SUBSTATION, POWER DISTRIBUTION ENGG.
 ERP IMPLEMENTATION( BPCS, ORACLE)
 SPEARHEADING MARKETING/BUSINESS DEVELOPMENT/SALES OPERATIONS OF LOW VOLTAGE
SWITCHGEAR, CABLES, AIRCONDITIONING SYSTEMS AND CONCEPTS
 EXPERIENCE IN CUSTOMISING AND IMPLEMENTATION OF ERP PACKAGES
 CREATING RETAIL OUTLETS, SALES HUBS FOR SWITCHGEAR AND AICONDITIONERS AND ALLIED
ACCESSORIES

MANAGER
  • نوفمبر 2017 إلى يوليو 2018

AL HASHAR ELECTRONICS MUSCAT OMAN
DIVISONAL

MANAGER في GULF INCON W.L.L. DOHA
  • الهند
  • يونيو 2009 إلى أكتوبر 2017

The Company: An ISO 9001:2015 compliant Organisation certified by BVQI
 Distributor for VOLTAS AIRCONDITIONERS, PHOTOCATLYTIC AIRPURIFIER
SYSTEMS FROM ULTRASUN TECHNOLOGIES AND ASPEN CONDENSATE DRAIN
PUMP SYSTEMS FROM U.K.

HEAD في ADVENT INFINITY GROUP
  • الهند
  • يناير 2003 إلى يناير 2009

 Customer data base increased by 37%
Some Major Projects Won:
 ASHGHAL ( SEWAGE PUMPING STATION PROJECT) -QAR 7.5MILLION
 CCIC ( QRCM/WMRCA & WMRCC, DHP, MDP4)- QAR 7 MILLION
 L&T( ELECTRICAL SUBSTATION PROJECTS/SEWAGE TREATMENT PLANTS) -QAR 3.5MILLION
 QATAR GERMAN MEDICAL DEVICES ( WAREHOUSE PROJECT) -QAR 2 MILLION
 MEDCO COMO SITE AT NEW DOHA PORT MESSAID - QAR 2 MILLION
 HBK ENGINEERING LUSAIL STADIUM PROJECT -QAR 2 MILLION
 G+7 Buildings at Mughalina/Al Wakhra/Airport Road(SOVEREIGN INTERNATIONAL) - QAR 1.5 MILLION
 NDIA Project (CP15, CP18, CP27) - QAR 2.1MILLION
 Tekfen (QAPCO LDPE3 Project-Messaid) - QAR1.23 MILLION
 Doha Cable Factory Project (Messaid) - QAR 0.5MILLION
Job Profile:
 Spearheading the Sales Projects and Servicing Operations of the Airconditioning Division
 Liasoning with Architects/HVAC Consultants/KDM’s of Business Houses
 Meeting HVAC, MEP and Construction Contractors
 Inventory Planning
 Estimation Planning Tendering
 Ensure Compliance with Statutory Regulations
 Training of Sales and Service Personnel of Products and Concepts
 Development of Technical Installation & Service Associates
 Development of Dealers, Retailers and Resellers
 Providing ERP and ISO Linkage for the Airconditioning Division from Time to Time

Head في Anchor Electricals & Electronics NEW DELHI
  • يناير 2001 إلى يناير 2003

BUSINESSDEVELOPMENTMANAGER -NORTHINDIA
 Regional Technical

TEAM LEADER في Oriflame(Silver Oak Laboratories)
  • يناير 1999 إلى يناير 2001

Development and implementation of Plant Maintenance Software by Creating
Database
ofLocations, Groups, Categories, Budgetheads, Equipments, Components, Suppliers, Employees and PM
Actions, to record Transactions related to Issue of Itemsand it’s Updation, Procurement Material Receipts, Quality
Check and ScrapGeneration so as to generate reports on Material Issue, Procurements, QualityChecks, Item
Movement, Stock Reconciliation and Equipment History along with analysis
 Water Treatment Plant Installation & Commissioning with Reverse Osmosis from OsmonicsInc.USA, along with
it’s Distribution and Dispensing System consisting of Universal Flow Meters(USA) Mass Flow Meters, Nov
Asceptic valves from Nov Asceptic Sweden, LKA LT Valves from Alfa Laval Saunders, which are controlled by
3nos Mitsubishi Make AnS Series PLC Systems, and Beijers Make MAC90 MMI(Man Machine Interface) at
three different locations interconnected by network.
* Plant Engineering of 625KVA, 437.5KVA DG Sets, 88CFM Atlas Copco Screw Compressor, RXA 06 and
RXA 02 Thermax Boilers, Blue Star Central A.C. Plants ( 2 x 110 TR, 3 x 10 TR, 3 x 7.5 TR ), 60 TR Blue
Star Chillers and 10 x 3 TR Blue Star Split A.C

MAINTENANCE ENGINEER في Reckitt &Colman of India Ltd KOLKATA
  • يناير 1997 إلى يناير 1999

Engineering Linkage to BPCS Implementation
* Installation and commissioning of 2nos automated Production Lines for
Mortein Mosquito Coil production machinery, using Pneumatic
Conveying System with Flow Monitoring, Extrusion & Stamping Processing and Packaging, using GE Fanuc
& Festo Make PLC, Festo makePneumatics, Batch Pressing by weight using Philips PR1615 Batching
Controllers
* Installed Harpic, Lizol Pineol Shakti, Robin Bleach Filling & Packaging Lines
* Installation of 750KVA Transformer and 2x350KVA DG Sets in Parallel
* Installation and commissioning of Electrical LT Distribution panel with DGSet Interlocking
* Installation and commissioning of 200 CFM Gardner Denver (USA) Screw Type Air Compressor alongwith
Dry Energy(Denmark) make Refrigerated Air Drier
* Installation of Multipack Systems Make Horizontal Flowrap Machine, and tuning the same to meet the
Production targets
 Plant Enginnering of Process & Packaging Machinery and related utilities for
* Boot Polish(Cherry Blossom/Cobra/Mansion Polish)
* Dettol Line(Dettol, Detollin, DettolAntiseptic Cream, Lizol)
* Tablet(Disprin/Epilex/Gaviscon)
* MetalPolish(Brasso/Silvo/MinCream) in Addition to the self installed Production Lines

Officer في Britannia Industries Ltd
  • الهند
  • يناير 1993 إلى يناير 1997

-Electrical Maintenance
* Relocation of Electrical Substation without any Production
Downtime
* Accountability of Breakdown in Production due to Electrical Failures
of all Production and packaging machines, and it’s failure due
failure of Utility Equipments
* Utility Engineering for 3x310KVA DG Sets, 2x750KVA
Transformers and 6KV HT VCB, LT Distribution Panel
* Preventive Maintenance of 50TRx2 Worthington Chiller
Plant, 60TRx2 Sabro and 75TR Blue Star Chiller Plant
* Industrial Automation of an entire Production Line with VVVF Drives from Eddy Current Coupling Drives

الخلفية التعليمية

بكالوريوس, Electrical & Electronics Eng
  • في La Martiniere For BoysManipal Institute Of Technology(Mangalore University)
  • يناير 2020

Major : High Voltage Engineering Illumination Engineering Biomedical Instrumentation

بكالوريوس, Computer Applications
  • في Regional Computer Centre,Jadavpur
  • يناير 2020

In

الثانوية العامة أو ما يعادلها, Computer Applications
  • في Regional Computer Centre,Jadavpur
  • يناير 2020

In

Specialties & Skills

Engineering
Project Work
Sales Growth
Project Bidding
CUSTOMER RELATIONS
TECHNICAL TRAINING
AUTOMATION
CABLING
CONCEPT DEVELOPMENT

اللغات

الالمانية
متمرّس
البولندية
متمرّس