Quality control Expert
AAW Consulting Engineers
Total years of experience :27 years, 6 Months
Quality control Expert
Main Office
Responsibilities: Review AAW projects specifications & BOQ, design drawing and tender documents
2011 2015
Project High Priority Projects (EUM/ALEX HPP) (AWGA) In AWCO Project,
USAID Grant No. 263-0270.02
Location : ALX . Egypt
Project consists of:-
Water Transmission Pipelines 35Km, Residual Pipelines 5Km installation of valves, service connections and fire hydrants.
Water distribution pipelines 72Km& water treatment plants modification to 7 water treatment plants.
Control 7plants by SCADA system
Construct a central bulk storage facility and 3 new raw water intakes, upgrade 2 water intake Structures & grabber system
Replace 3 diesel generators .
Responsibilities
Manage and prepared all equipments and systems to turn over to employer and planning to finish from punch list items in project
Coordinate with engineer and employer to:
Turn over equipments and systems in plants
Do on job training for operation and maintenances
Solve any problem in operation, maintenances and Spare part for repair
Manage and planning on job training for operation and maintenances
Follow up sub contractor to finish their job
Study spare part with local market to decided if can use
Coordination In Start Up and Operation phase
Responsibilities
Follow up with contractor and quality control team with issues such as installation, visual Functional for new equipment
Coordination with employer and contractor for planning outage of existing system and Equipment to install new instrument and equipments
Participated in review of all record drawings (as built drawing).
Coordinate with employer for preparing to start up new equipment and systems.
Coordinate with employer for preparing team for operation and maintenance
2004 2005 Position: Contract
Design phase and preparing to Construction phase
Responsibilities
Participated in updating the WTP Site plans to show existing physical features and yard piping, updating the 7 WTPs Survey and design 3 residual lines with their pumps units
Participated in design of all systems in the WTP 2 new intakes and upgrade of 3 existing to installed grabber system
Participated in calculation and specification of Chlorine, Alum Ventilation, scrubber systems, all control systems and selecting equipment and instruments in the WTP
Participated in calculation and specification of 3 new generator set, upgrade for control system of 4 generators set and soft starter for medium volt motors.
Participated in calculation and design of modifications of hydraulic weir mixers.
Participated in design of upgrade filters including valves, air system, control disc and filter control System
Participated in writing of scope of work of contractor and scope of work of AWGA
Participated in preparation of bid documents, answering any question from Contractors
Participated in preparing addendums in contract documents, evaluation of contractors and preparation of Contract Documen
Private Company for Contractor and Supply
Responsibilities
Management starting from studying, evaluating &pricing for contractors
Evaluating & pricing for contractors and follow - up the suppliers
Planning and responsibility for credit, banking and transferring
Supplying materials, machinery spare parts-workshop equipments and tools
Repair, Overhaul for electrical station & pumping station and Service for Construction Buildings.
Supplying and installation & Operating fuel lines and pumps
Design and fabricate steel structure and tank
Design and Fabricated hydraulic equipment's
Planning and design of irrigation system and for green houses
Design compact water treatment units and wastewater treatment units
Design and construction of service center and garages for Agriculture equipment
From To
1968 1988
planning, design, construction, operation, service and maintenance of all food security systems
Including Irrigation system, agricultural equipment, dairy, hatchery systems green houses, milk project, laying projects, and feed mill.
Evaluating the preliminary cost of all new project
Project : main workshop for major repair of Generator sets)
Responsibilities
The scope of work includes planning, management and full responsibilities for overhaul of the engines such as diesel, gasoline and turbine and maintenance for all electric equipment
1978 1982
Position : Chief of Generators sets Branch
Project : Armament and ammunition Department
Responsibilities
Planning for maintenance, repair of Generators Sets and lifting equipment
Participation to prepare specification for new equipments
Participation in tender evaluation
Participation contract negotiations
Preparation of required spare parts and equipment
1973 1978
Position : Chief Section of Planing, Inspection, maintenance, repair,
Project : main workshop for major repair of Generator sets
Responsibilities
Training, planning supply and storage of spare Parts and equipments.
Participation to prepare specification for new equipments
- Participation in tender evaluation
- Participation contract negotiations.
- Preparation of required spare parts and equipment
Project : Alexandria Water Master Plan Project - USAID fund
Responsibilities
Field work & analysis and update the existing hydraulic grade line for peak summer
Participated in updating the WTP Site plans and the Booster Pumps Site plans to show existing physical features and yard piping upgrades.
Prepared preliminary design criteria for the high priority projects
Data collection & evaluation of all type of pumps, Reservoirs, Booster Pumps, and Pipe line connections for treated water, raw water & residual water in all WTP's plant and boosters .
Participated in preparing the preliminary design criteria for the high priority projects (HPP) that will correct water quality, production or safety deficiencies at Alexandria WTPS.
Project : El Amiraya Pumping Station
Responsibilities
Chief of Egyptian team to operate and maintain El Amiraya Pumping Station
After Completion & before delivery of the station to the Sewage Auth as a transfer period For training the staff and testing
Project : Air defiance
Responsibilities
Maintenance, repair of Generators Set and lift equipment in sit
From To
1966 1968
Participated in the design and erection of sewage treatment plants
Erection of irrigation pumping stations in Upper Egypt
Professional training forums on manufacturing, maintenance and quality control:
§ Rolls Royce-England (1977)
Operation, repair and Maintenance of Rolls Royce "C"
§ Perkins Engines-England (1977)
Operation, repair and Maintenance of Perkins engines
§ Petter Generators-England (1977)
Operation, repair and Maintenance of Petter engines and generators
§ Deutz Engines-West Germany (1982)
Operation, repair and Maintenance of diesel engines and generators
training for Farms
-
-
-
.