Low Current Site Engineer
Empower Contracting
Total years of experience :9 years, 9 Months
Makkah Holly Mosque Hospital Tower (Third expansion of Makkah Holly Mosque)
Position:Site Low Current Engineer (Coordinator between LV and LC)
Duties: Installation of the following activities:
• Power system.
• Lighting system.
• Cable routing system.
• Low voltage.
Job Description:
• Installation of earthing system.
• Installation of 1st fix, 2nd fix and cable routing on site as per shop drawings.
• Supervise, coordinate, and inspect the work progress on site as per construction schedule.
• Coordinate technically between electrical, mechanical, & low current activities before & during execution at site.
• Draw as-built for any changes on the shop drawing.
• Raise Inspection requests and attend inspection with main contractor and consultant for the job executed.
• Coordinate between other departments on the site (civil, architectural, mechanical, and survey).
• Calculate complete take off for 1st fix, 2nd fix material, and long lead items as per shop drawings and final design (earthing, lightning system, cable routing, and power).
• Write weekly report for the progress of site to higher management.
• Submit payment certificate to higher management.
Educate major courses: - Audio Visual
- Logic Circuit
- Telephony
- Analog Communication
Bachelor Lebanese University Faculty of Science, Computer Science 2005-2010
High School Studied at Mina Official School, 2002-2005 Secondary education