Total Years of Experience: 17 Years, 11 Months
January 2023
To Present
Project Manager
at Khatib & Alami Consolidated Engineering Company L.L.C.
Location :
United Arab Emirates - Dubai
• Project: Construction of One Crescent Project, which is a new landmark located at Palm Jumeirah, a refined class development by AHS Properties with 3 to 6-bedroom penthouses, sky villas and sky mansions, Dubai, U.A.E. Construction cost for Enabling Works: AED 1, 200, 000 Client: M/s. AHS Palm Properties Enabling Contractor: M/s. Dutch Foundation & Concrete Processing Co. LLC
January 2022
To December 2022
Finishing Project Manager
at Khatib & Alami Consolidated Engineering Company L.L.C.
Location :
United Arab Emirates - Dubai
• Project: Construction of The Address Residence Dubai Opera A2/A3/A1a, Dubai, U.A.E. Construction cost: AED 1, 150, 000, 000 Client: M/s. EMAAR Main Contractor: M/s.TAV Tepe Akfen Investment Construction and Operation Company L.L.C. (TAV)
July 2021
To December 2021
Project Manager
at KHATIB & ALAMI CONSOLIDATED ENGINEERING COMPANY L.L.C KALBA
Location :
United Arab Emirates - Dubai
• Project: Construction of Souq Al Jubail (Plot No. 94-Al Bahais) at Kalba, U.A.E. Construction cost: AED 109, 000, 000 Client: M/s. Directorate of Town Planning and Survey, Government of Sharjah. Main Contractor: M/s. United Engineering Construction L.L.C. (UNEC)
December 2018
To June 2021
Associate Project Manager
at Khatib & Alami Consolidated Engineering Company L.L.C.
Location :
United Arab Emirates - Dubai
• Project: Park Point - EMAAR Properties - MBR Dubai Hills Park Point, Dubai 4 residential Buildings (G+10+Roof) - 333 flats Construction cost: AED 232, 080, 470 Client: M/s. EMAAR Properties - MBR Dubai Hills Project Manager: M/s. EllisDon. PMC Main Contractor: M/s. Parkway international Contracting Co
Responsibilities:
• Support the coordination with client counterparts to finalize project commencement date, as needed.
• Coordinate with local authorities to obtain required approvals, licenses, permits etc. For supervision projects and forward copies of design NOCs and approvals to contractors, as needed.
• Support Senior Project Manager and Project Manager in managing client relations, including managing project expectations, sharing project progress and issues / risks and responding to client clarifications on technical and contractual issues.
• Ensure client satisfaction with construction supervision services.
• Lead internal and external kick-off meetings with clients and contractors to plan commencement of work.
• Review, comment and follow up on finalization of contractors submittals, including staffing proposal, organization charts, shop drawings, method statements, project procedures…etc.
• Monitor contractors daily activities and resource allocation against plan.
• Monitor supervision project schedules and investigate reasons for delay with contractors.
Responsibilities:
• Support the coordination with client counterparts to finalize project commencement date, as needed.
• Coordinate with local authorities to obtain required approvals, licenses, permits etc. For supervision projects and forward copies of design NOCs and approvals to contractors, as needed.
• Support Senior Project Manager and Project Manager in managing client relations, including managing project expectations, sharing project progress and issues / risks and responding to client clarifications on technical and contractual issues.
• Ensure client satisfaction with construction supervision services.
• Lead internal and external kick-off meetings with clients and contractors to plan commencement of work.
• Review, comment and follow up on finalization of contractors submittals, including staffing proposal, organization charts, shop drawings, method statements, project procedures…etc.
• Monitor contractors daily activities and resource allocation against plan.
• Monitor supervision project schedules and investigate reasons for delay with contractors.
March 2018
To November 2018
Construction Manager
I found this job using Bayt.com
at Amana Contracting And Steel Buildings
Location :
United Arab Emirates - Dubai
March 2018 - November 2018
Construction Manager, AMANA CONTRACTING & STEEL BUILDINGS, Dubai, UAE
Project: AL Marmoum Sanctuary Development - YOGA & Sunrise / Sunset Observation platform & the ORYX animals Observation platform, Dubai
YOGA & Sunrise / Sunset Observation platform & the ORYX animals Observation platform, Dubai
Project Value = AED 23 million
Client: Dubai Municipality
Consultant: Al Turath Engineering Consultants
Construction Manager, AMANA CONTRACTING & STEEL BUILDINGS, Dubai, UAE
Project: AL Marmoum Sanctuary Development - YOGA & Sunrise / Sunset Observation platform & the ORYX animals Observation platform, Dubai
YOGA & Sunrise / Sunset Observation platform & the ORYX animals Observation platform, Dubai
Project Value = AED 23 million
Client: Dubai Municipality
Consultant: Al Turath Engineering Consultants
March 2018
To November 2018
Construction Manager
at Amana Contracting & Steel Buildings
Location :
United Arab Emirates - Dubai
• Project: AL Marmoum Sanctuary Development - YOGA & Sunrise / Sunset Observation platform & the ORYX animals Observation platform, Dubai
YOGA & Sunrise / Sunset Observation platform & the ORYX animals Observation platform, Dubai Project Value = AED 23 million Client: Dubai Municipality Consultant: Al Turath Engineering Consultants
YOGA & Sunrise / Sunset Observation platform & the ORYX animals Observation platform, Dubai Project Value = AED 23 million Client: Dubai Municipality Consultant: Al Turath Engineering Consultants
September 2014
To April 2018
Construction Manager
I found this job using Bayt.com
at Commodore Contracting Company
Location :
United Arab Emirates - Dubai
Sept. 2014 - April 2018
Construction Manager, COMMODORE CONTRACTING COMPANY. LLC, Dubai, UAE
I have started as Sr. Project Engineer from Sep 2014 to May 2016
Project: AKOYA PARK by DAMAC - Plot No 676-1061, Al Hebiah Third, Dubailand (Mudon), Dubai, UAE
550 Villas (for Rochester, Pelham and Trinity Clusters) at Akoya Park, Dubai, UAE for DAMAC Crescent Properties L.L.C.
Project Value = AED 448 million
Client: DAMAC Crescent Properties L.L.C.
Consultant: Connin
Construction Manager, COMMODORE CONTRACTING COMPANY. LLC, Dubai, UAE
I have started as Sr. Project Engineer from Sep 2014 to May 2016
Project: AKOYA PARK by DAMAC - Plot No 676-1061, Al Hebiah Third, Dubailand (Mudon), Dubai, UAE
550 Villas (for Rochester, Pelham and Trinity Clusters) at Akoya Park, Dubai, UAE for DAMAC Crescent Properties L.L.C.
Project Value = AED 448 million
Client: DAMAC Crescent Properties L.L.C.
Consultant: Connin
September 2014
To April 2018
Construction Manager
at Commodore Contracting Company. LLC
Location :
United Arab Emirates - Dubai
I have started as Sr. Project Engineer from Sep 2014 to May 2016
• Project: AKOYA PARK by DAMAC - Plot No 676-1061, Al Hebiah Third, Dubailand (Mudon), Dubai, UAE
550 Villas (for Rochester, Pelham and Trinity Clusters) at Akoya Park, Dubai, UAE for DAMAC Crescent Properties L.L.C. Project Value = AED 448 million Client: DAMAC Crescent Properties L.L.C. Consultant: Connin
• Project: AKOYA PARK by DAMAC - Plot No 676-1061, Al Hebiah Third, Dubailand (Mudon), Dubai, UAE
550 Villas (for Rochester, Pelham and Trinity Clusters) at Akoya Park, Dubai, UAE for DAMAC Crescent Properties L.L.C. Project Value = AED 448 million Client: DAMAC Crescent Properties L.L.C. Consultant: Connin
November 2009
To May 2014
Section Engineer
at Arabian Construction Company - ACC
Location :
United Arab Emirates - Dubai
November 2009 - May 2014
Section Engineer, Arabian Construction Company ACC, UAE
Project 1: Volante Tower (Business Bay - Dubai- 300 Million Dirhams).
A residential tower composed of a basement, GF and 26 upper floors, accommodating 2 and 4 bedroom flats.
Client: Xtreme Visions
Consultant: FNP
Project 2: Princess Residence Tower (6B+G+100 Floors) - Dubai Marina- Tallest Residential Tower in the World - 414 meters
The high rise multistory tower consists of 6 B + G.F +100 F is the tallest residential tower in the world is based on a 3500 sq. m area. The height of the tower is 414 meters with 750 luxury residential apartments along with duplex villas. The tower emerges out of 6 basements and 4 podium floors and is also served with health club facilities
Construction cost: AED 687, 000, 000
Client: Ta’meer Holding Investments
Consultant: Engineer Adnan Saffarini
Responsibilities:
• Defined priority of the project and assigning the tasks to all site engineers, foremen and charge hands.
• Managed multiple, variable tasks, activities and processes from commencement date up to completion and handing over of completed works.
• Oversaw the overall site operations and management.
• Allocated resources (manpower and machinery) in line with the priority of grouping and milestones to be achieved.
• Liaised with Project Stakeholders, Consultant, Sub-Contractors and other relevant parties on technical, progress, inspections, testing and physical site works / construction-related matters.
• Liaised with third parties on coordination, interfaces and scheduling of works; all in line with time scales and working practices.
• Imparted and distributed information to site engineers on progressive basis upon receiving any documents i.e. drawing, Field Change Request, variations on works, Consultant’s comments and instructions, etc.
• Checked and analyzed correctness of information and drawings, marking and providing technical comments including providing on-site technical solutions and alternatives for any arising site issues.
• Determined, ascertained, verified and liaised with Engineering and technical team on technical drawings, project specifications and other documents forming part of Project Requirements and the compliance of physical works to all drawings (architectural, structural, construction, MEP drawings, etc.) and applicable international standard as well as code of practice.
• Solved site difficulties, issues, any Change Requests received from the Technical Department and superiors; and made cross-reference on approved drawings to ensure compliance of works as per design requirements and parameters.
• Formulated realistic parameters on sequencing of works based on Work Breakdown Structure.
• Supervised, monitored, controlled the progress of works, compliance and conformity of all works including materials; and identified level of risks which may impact the milestones and established dates.
• Created matrix, coordinated, tracked work progress and evaluated the accomplishment of tasks as per targeted and established milestones dates.
• Implemented standards of quality and workmanship to be achieved and assessed on a daily basis the performance and execution of works by Main Contractor and Sub-Contractors.
Section Engineer, Arabian Construction Company ACC, UAE
Project 1: Volante Tower (Business Bay - Dubai- 300 Million Dirhams).
A residential tower composed of a basement, GF and 26 upper floors, accommodating 2 and 4 bedroom flats.
Client: Xtreme Visions
Consultant: FNP
Project 2: Princess Residence Tower (6B+G+100 Floors) - Dubai Marina- Tallest Residential Tower in the World - 414 meters
The high rise multistory tower consists of 6 B + G.F +100 F is the tallest residential tower in the world is based on a 3500 sq. m area. The height of the tower is 414 meters with 750 luxury residential apartments along with duplex villas. The tower emerges out of 6 basements and 4 podium floors and is also served with health club facilities
Construction cost: AED 687, 000, 000
Client: Ta’meer Holding Investments
Consultant: Engineer Adnan Saffarini
Responsibilities:
• Defined priority of the project and assigning the tasks to all site engineers, foremen and charge hands.
• Managed multiple, variable tasks, activities and processes from commencement date up to completion and handing over of completed works.
• Oversaw the overall site operations and management.
• Allocated resources (manpower and machinery) in line with the priority of grouping and milestones to be achieved.
• Liaised with Project Stakeholders, Consultant, Sub-Contractors and other relevant parties on technical, progress, inspections, testing and physical site works / construction-related matters.
• Liaised with third parties on coordination, interfaces and scheduling of works; all in line with time scales and working practices.
• Imparted and distributed information to site engineers on progressive basis upon receiving any documents i.e. drawing, Field Change Request, variations on works, Consultant’s comments and instructions, etc.
• Checked and analyzed correctness of information and drawings, marking and providing technical comments including providing on-site technical solutions and alternatives for any arising site issues.
• Determined, ascertained, verified and liaised with Engineering and technical team on technical drawings, project specifications and other documents forming part of Project Requirements and the compliance of physical works to all drawings (architectural, structural, construction, MEP drawings, etc.) and applicable international standard as well as code of practice.
• Solved site difficulties, issues, any Change Requests received from the Technical Department and superiors; and made cross-reference on approved drawings to ensure compliance of works as per design requirements and parameters.
• Formulated realistic parameters on sequencing of works based on Work Breakdown Structure.
• Supervised, monitored, controlled the progress of works, compliance and conformity of all works including materials; and identified level of risks which may impact the milestones and established dates.
• Created matrix, coordinated, tracked work progress and evaluated the accomplishment of tasks as per targeted and established milestones dates.
• Implemented standards of quality and workmanship to be achieved and assessed on a daily basis the performance and execution of works by Main Contractor and Sub-Contractors.
November 2009
To May 2014
Section Engineer
at ARABIAN CONSTRUCTION COMPANY (ACC).
Location :
United Arab Emirates - Dubai
• Project 1: Volante Tower (Business Bay - Dubai- 300 Million Dirhams). A residential tower composed of a basement, GF and 26 upper floors, accommodating 2 and 4 bedroom flats. Client: Xtreme Visions Consultant: FNP
• Project 2: Princess Residence Tower (6B+G+100 Floors) - Dubai Marina- Tallest Residential Tower in the World - 414 meters
The high-rise multistory tower consists of 6 B + G.F +100 F is the tallest residential tower in the world is based on a 3500 sq. m area. The height of the tower is 414 meters with 750 luxury residential apartments along with duplex villas. The tower emerges out of 6 basements and 4 podium floors and is also served with health club facilities
Construction cost: AED 687, 000, 000 Client: Tameer Holding Investments Consultant: Engineer Adnan Saffarini
Responsibilities:
• Defined priority of the project and assigning the tasks to all site engineers, foremen and charge hands.
• Managed multiple, variable tasks, activities and processes from commencement date up to completion and handing over of completed works.
• Oversaw the overall site operations and management.
• Allocated resources (manpower and machinery) in line with the priority of grouping and milestones to be achieved.
• Liaised with Project Stakeholders, Consultant, Sub-Contractors and other relevant parties on technical, progress, inspections, testing and physical site works / construction-related matters.
• Liaised with third parties on coordination, interfaces and scheduling of works; all in line with time scales and working practices.
• Imparted and distributed information to site engineers on progressive basis upon receiving any documents i.e. drawing, Field Change Request, variations on works, Consultants comments and instructions, etc.
• Checked and analyzed correctness of information and drawings, marking and providing technical comments including providing on-site technical solutions and alternatives for any arising site issues.
• Determined, ascertained, verified and liaised with Engineering and technical team on technical drawings, project specifications and other documents forming part of Project Requirements and the compliance of physical works to all drawings (architectural, structural, construction, MEP drawings, etc.) and applicable international standard as well as code of practice.
• Solved site difficulties, issues, any Change Requests received from the Technical Department and superiors; and made cross-reference on approved drawings to ensure compliance of works as per design requirements and parameters.
• Formulated realistic parameters on sequencing of works based on Work Breakdown Structure.
• Supervised, monitored, controlled the progress of works, compliance and conformity of all works including materials; and identified level of risks which may impact the milestones and established dates.
• Created matrix, coordinated, tracked work progress and evaluated the accomplishment of tasks as per targeted and established milestones dates.
• Implemented standards of quality and workmanship to be achieved and assessed on a daily basis the performance and execution of works by Main Contractor and Sub-Contractors.
• Evaluation, verification and endorsement against Sub-Contractors monthly progress payment
• Prepared daily site progress reports and others as required.
• Project 2: Princess Residence Tower (6B+G+100 Floors) - Dubai Marina- Tallest Residential Tower in the World - 414 meters
The high-rise multistory tower consists of 6 B + G.F +100 F is the tallest residential tower in the world is based on a 3500 sq. m area. The height of the tower is 414 meters with 750 luxury residential apartments along with duplex villas. The tower emerges out of 6 basements and 4 podium floors and is also served with health club facilities
Construction cost: AED 687, 000, 000 Client: Tameer Holding Investments Consultant: Engineer Adnan Saffarini
Responsibilities:
• Defined priority of the project and assigning the tasks to all site engineers, foremen and charge hands.
• Managed multiple, variable tasks, activities and processes from commencement date up to completion and handing over of completed works.
• Oversaw the overall site operations and management.
• Allocated resources (manpower and machinery) in line with the priority of grouping and milestones to be achieved.
• Liaised with Project Stakeholders, Consultant, Sub-Contractors and other relevant parties on technical, progress, inspections, testing and physical site works / construction-related matters.
• Liaised with third parties on coordination, interfaces and scheduling of works; all in line with time scales and working practices.
• Imparted and distributed information to site engineers on progressive basis upon receiving any documents i.e. drawing, Field Change Request, variations on works, Consultants comments and instructions, etc.
• Checked and analyzed correctness of information and drawings, marking and providing technical comments including providing on-site technical solutions and alternatives for any arising site issues.
• Determined, ascertained, verified and liaised with Engineering and technical team on technical drawings, project specifications and other documents forming part of Project Requirements and the compliance of physical works to all drawings (architectural, structural, construction, MEP drawings, etc.) and applicable international standard as well as code of practice.
• Solved site difficulties, issues, any Change Requests received from the Technical Department and superiors; and made cross-reference on approved drawings to ensure compliance of works as per design requirements and parameters.
• Formulated realistic parameters on sequencing of works based on Work Breakdown Structure.
• Supervised, monitored, controlled the progress of works, compliance and conformity of all works including materials; and identified level of risks which may impact the milestones and established dates.
• Created matrix, coordinated, tracked work progress and evaluated the accomplishment of tasks as per targeted and established milestones dates.
• Implemented standards of quality and workmanship to be achieved and assessed on a daily basis the performance and execution of works by Main Contractor and Sub-Contractors.
• Evaluation, verification and endorsement against Sub-Contractors monthly progress payment
• Prepared daily site progress reports and others as required.
February 2007
To November 2009
Civil Site Engineer
at Khatib & Alami - K&A
Location :
United Arab Emirates - Dubai
Project 1: Green Community - Motor City, Nad Al Shibba, Dubai
Residential Building Comprising
• 286 Villas (Townhouse, Bungalow, Family Villa and Luxury Villa)
• 4 Residential buildings consisting of 160 apartments
• 5 Recreation Centers
• Commercial Center
• Main artificial lake consists of 5 basins
• 3 GSM towers
Client: Union Properties
Project Manager: EDARA
Main Contractor: El-Seif / ESEC Contracting Co.
Project 2: Dubai Jewel Tower, Dubai Media City, Dubai, U.A.E - Residential building comprising 3B+G+3P+39 Floors
• Basement Floors*3Nr. (Car-park and stores)
• Ground Floor (car-park, Entrances, Commercial Spaces, Services rooms)
• First & Second floor: Podium (car-park, department store, toilets, and service rooms)
• Third floors: Podium Health Club Floor (swimming pool and Gymnasium, squash courts, Tennis Courts), Mechanical Floor: Below 4th Floor (Double height)
• 4th to 15th Floors: Offices Floors, 16th to 42nd Floors: Residential Floors (26th Floor Technical Floor, 41st&42nd Floors Penthouses & Mechanical services Rooms)
Client: Sharaf Group
Main Contractor :( ABM) AL Basti & Muktha Contracting Co.
Responsibilities:
• Ensure responsibilities are fulfilled with high quality and in a cost-effective manner.
• Support Resident Engineers with managing client relations and expectations, as needed.
• Support Resident Engineers with organization inspections by third parties, as needed.
• Ensure client satisfaction with construction supervision services.
• Review shop drawings, materials submittals and bills of quantities for accuracy of calculation. Notify the Assistant Resident Engineer of any discrepancies.
• Supervision the installations of equipment on site.
• Closely work with the project team to carry out all inspection subject to daily form submitted by contractor.
• Monitor all safety aspects of the project and ensure strict adherence to safety regulation.
Residential Building Comprising
• 286 Villas (Townhouse, Bungalow, Family Villa and Luxury Villa)
• 4 Residential buildings consisting of 160 apartments
• 5 Recreation Centers
• Commercial Center
• Main artificial lake consists of 5 basins
• 3 GSM towers
Client: Union Properties
Project Manager: EDARA
Main Contractor: El-Seif / ESEC Contracting Co.
Project 2: Dubai Jewel Tower, Dubai Media City, Dubai, U.A.E - Residential building comprising 3B+G+3P+39 Floors
• Basement Floors*3Nr. (Car-park and stores)
• Ground Floor (car-park, Entrances, Commercial Spaces, Services rooms)
• First & Second floor: Podium (car-park, department store, toilets, and service rooms)
• Third floors: Podium Health Club Floor (swimming pool and Gymnasium, squash courts, Tennis Courts), Mechanical Floor: Below 4th Floor (Double height)
• 4th to 15th Floors: Offices Floors, 16th to 42nd Floors: Residential Floors (26th Floor Technical Floor, 41st&42nd Floors Penthouses & Mechanical services Rooms)
Client: Sharaf Group
Main Contractor :( ABM) AL Basti & Muktha Contracting Co.
Responsibilities:
• Ensure responsibilities are fulfilled with high quality and in a cost-effective manner.
• Support Resident Engineers with managing client relations and expectations, as needed.
• Support Resident Engineers with organization inspections by third parties, as needed.
• Ensure client satisfaction with construction supervision services.
• Review shop drawings, materials submittals and bills of quantities for accuracy of calculation. Notify the Assistant Resident Engineer of any discrepancies.
• Supervision the installations of equipment on site.
• Closely work with the project team to carry out all inspection subject to daily form submitted by contractor.
• Monitor all safety aspects of the project and ensure strict adherence to safety regulation.
February 2007
To November 2009
Civil Engineer
at Khatib & Alami Consolidated Engineering Company L.L.C.
Location :
United Arab Emirates - Dubai
• Ensure responsibilities are fulfilled with high quality and in a cost-effective manner.
• Support Resident Engineers with managing client relations and expectations, as needed.
• Support Resident Engineers with organization inspections by third parties, as needed.
• Ensure client satisfaction with construction supervision services.
• Review shop drawings, materials submittals and bills of quantities for accuracy of calculation. Notify the Assistant Resident Engineer of any discrepancies.
• Supervision the installations of equipment on site.
• Closely work with the project team to carry out all inspection subject to daily form submitted by contractor.
• Monitor all safety aspects of the project and ensure strict adherence to safety regulation.
• Support Resident Engineers with managing client relations and expectations, as needed.
• Support Resident Engineers with organization inspections by third parties, as needed.
• Ensure client satisfaction with construction supervision services.
• Review shop drawings, materials submittals and bills of quantities for accuracy of calculation. Notify the Assistant Resident Engineer of any discrepancies.
• Supervision the installations of equipment on site.
• Closely work with the project team to carry out all inspection subject to daily form submitted by contractor.
• Monitor all safety aspects of the project and ensure strict adherence to safety regulation.
June 2006
To February 2007
Civil Site Engineer
at Engineering Services Office-
Location :
Syria - As-Suwayda
2006-2007
Civil Engineer, Engineering Services Office - Syria
Responsibility:
Designed and supervised structural works for commercial / residential buildings (such as villas, building /B+G+4/)
Civil Engineer, Engineering Services Office - Syria
Responsibility:
Designed and supervised structural works for commercial / residential buildings (such as villas, building /B+G+4/)
January 2006
To January 2007
Civil Engineer
at Engineering Services Office
Location :
Syria - As-Suwayda
Responsibility:
Designed and supervised structural works for commercial / residential buildings (such as villas, building /B+G+4/)
Designed and supervised structural works for commercial / residential buildings (such as villas, building /B+G+4/)