Project Manager à Khatib & Alami Consolidated Engineering Company L.L.C.
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis janvier 2023

• Project: Construction of One Crescent Project, which is a new landmark located at Palm Jumeirah, a refined class development by AHS Properties with 3 to 6-bedroom penthouses, sky villas and sky mansions, Dubai, U.A.E. Construction cost for Enabling Works: AED 1, 200, 000 Client: M/s. AHS Palm Properties Enabling Contractor: M/s. Dutch Foundation & Concrete Processing Co. LLC

Finishing Project Manager à Khatib & Alami Consolidated Engineering Company L.L.C.
  • Émirats Arabes Unis - Dubaï
  • janvier 2022 à décembre 2022

• Project: Construction of The Address Residence Dubai Opera A2/A3/A1a, Dubai, U.A.E. Construction cost: AED 1, 150, 000, 000 Client: M/s. EMAAR Main Contractor: M/s.TAV Tepe Akfen Investment Construction and Operation Company L.L.C. (TAV)

Project Manager à KHATIB & ALAMI CONSOLIDATED ENGINEERING COMPANY L.L.C KALBA
  • Émirats Arabes Unis - Dubaï
  • juillet 2021 à décembre 2021

• Project: Construction of Souq Al Jubail (Plot No. 94-Al Bahais) at Kalba, U.A.E. Construction cost: AED 109, 000, 000 Client: M/s. Directorate of Town Planning and Survey, Government of Sharjah. Main Contractor: M/s. United Engineering Construction L.L.C. (UNEC)

Associate Project Manager à Khatib & Alami Consolidated Engineering Company L.L.C.
  • Émirats Arabes Unis - Dubaï
  • décembre 2018 à juin 2021

• Project: Park Point - EMAAR Properties - MBR Dubai Hills Park Point, Dubai 4 residential Buildings (G+10+Roof) - 333 flats Construction cost: AED 232, 080, 470 Client: M/s. EMAAR Properties - MBR Dubai Hills Project Manager: M/s. EllisDon. PMC Main Contractor: M/s. Parkway international Contracting Co

Responsibilities:
• Support the coordination with client counterparts to finalize project commencement date, as needed.
• Coordinate with local authorities to obtain required approvals, licenses, permits etc. For supervision projects and forward copies of design NOCs and approvals to contractors, as needed.
• Support Senior Project Manager and Project Manager in managing client relations, including managing project expectations, sharing project progress and issues / risks and responding to client clarifications on technical and contractual issues.
• Ensure client satisfaction with construction supervision services.
• Lead internal and external kick-off meetings with clients and contractors to plan commencement of work.
• Review, comment and follow up on finalization of contractors submittals, including staffing proposal, organization charts, shop drawings, method statements, project procedures…etc.
• Monitor contractors daily activities and resource allocation against plan.
• Monitor supervision project schedules and investigate reasons for delay with contractors.

Construction Manager à Amana Contracting And Steel Buildings
  • Émirats Arabes Unis - Dubaï
  • mars 2018 à novembre 2018

March 2018 - November 2018

Construction Manager, AMANA CONTRACTING & STEEL BUILDINGS, Dubai, UAE
 Project: AL Marmoum Sanctuary Development - YOGA & Sunrise / Sunset Observation platform & the ORYX animals Observation platform, Dubai

YOGA & Sunrise / Sunset Observation platform & the ORYX animals Observation platform, Dubai
Project Value = AED 23 million
Client: Dubai Municipality
Consultant: Al Turath Engineering Consultants

Construction Manager à Amana Contracting & Steel Buildings
  • Émirats Arabes Unis - Dubaï
  • mars 2018 à novembre 2018

• Project: AL Marmoum Sanctuary Development - YOGA & Sunrise / Sunset Observation platform & the ORYX animals Observation platform, Dubai

YOGA & Sunrise / Sunset Observation platform & the ORYX animals Observation platform, Dubai Project Value = AED 23 million Client: Dubai Municipality Consultant: Al Turath Engineering Consultants

Construction Manager à Commodore Contracting Company
  • Émirats Arabes Unis - Dubaï
  • septembre 2014 à avril 2018

Sept. 2014 - April 2018

Construction Manager, COMMODORE CONTRACTING COMPANY. LLC, Dubai, UAE
I have started as Sr. Project Engineer from Sep 2014 to May 2016
 Project: AKOYA PARK by DAMAC - Plot No 676-1061, Al Hebiah Third, Dubailand (Mudon), Dubai, UAE

550 Villas (for Rochester, Pelham and Trinity Clusters) at Akoya Park, Dubai, UAE for DAMAC Crescent Properties L.L.C.
Project Value = AED 448 million
Client: DAMAC Crescent Properties L.L.C.
Consultant: Connin

Construction Manager à Commodore Contracting Company. LLC
  • Émirats Arabes Unis - Dubaï
  • septembre 2014 à avril 2018

I have started as Sr. Project Engineer from Sep 2014 to May 2016
• Project: AKOYA PARK by DAMAC - Plot No 676-1061, Al Hebiah Third, Dubailand (Mudon), Dubai, UAE

550 Villas (for Rochester, Pelham and Trinity Clusters) at Akoya Park, Dubai, UAE for DAMAC Crescent Properties L.L.C. Project Value = AED 448 million Client: DAMAC Crescent Properties L.L.C. Consultant: Connin

Section Engineer à Arabian Construction Company - ACC
  • Émirats Arabes Unis - Dubaï
  • novembre 2009 à mai 2014

November 2009 - May 2014

Section Engineer, Arabian Construction Company ACC, UAE

 Project 1: Volante Tower (Business Bay - Dubai- 300 Million Dirhams).
A residential tower composed of a basement, GF and 26 upper floors, accommodating 2 and 4 bedroom flats.
Client: Xtreme Visions
Consultant: FNP

 Project 2: Princess Residence Tower (6B+G+100 Floors) - Dubai Marina- Tallest Residential Tower in the World - 414 meters

The high rise multistory tower consists of 6 B + G.F +100 F is the tallest residential tower in the world is based on a 3500 sq. m area. The height of the tower is 414 meters with 750 luxury residential apartments along with duplex villas. The tower emerges out of 6 basements and 4 podium floors and is also served with health club facilities

Construction cost: AED 687, 000, 000
Client: Ta’meer Holding Investments
Consultant: Engineer Adnan Saffarini

Responsibilities:
• Defined priority of the project and assigning the tasks to all site engineers, foremen and charge hands.
• Managed multiple, variable tasks, activities and processes from commencement date up to completion and handing over of completed works.
• Oversaw the overall site operations and management.
• Allocated resources (manpower and machinery) in line with the priority of grouping and milestones to be achieved.
• Liaised with Project Stakeholders, Consultant, Sub-Contractors and other relevant parties on technical, progress, inspections, testing and physical site works / construction-related matters.
• Liaised with third parties on coordination, interfaces and scheduling of works; all in line with time scales and working practices.
• Imparted and distributed information to site engineers on progressive basis upon receiving any documents i.e. drawing, Field Change Request, variations on works, Consultant’s comments and instructions, etc.
• Checked and analyzed correctness of information and drawings, marking and providing technical comments including providing on-site technical solutions and alternatives for any arising site issues.
• Determined, ascertained, verified and liaised with Engineering and technical team on technical drawings, project specifications and other documents forming part of Project Requirements and the compliance of physical works to all drawings (architectural, structural, construction, MEP drawings, etc.) and applicable international standard as well as code of practice.
• Solved site difficulties, issues, any Change Requests received from the Technical Department and superiors; and made cross-reference on approved drawings to ensure compliance of works as per design requirements and parameters.
• Formulated realistic parameters on sequencing of works based on Work Breakdown Structure.
• Supervised, monitored, controlled the progress of works, compliance and conformity of all works including materials; and identified level of risks which may impact the milestones and established dates.
• Created matrix, coordinated, tracked work progress and evaluated the accomplishment of tasks as per targeted and established milestones dates.
• Implemented standards of quality and workmanship to be achieved and assessed on a daily basis the performance and execution of works by Main Contractor and Sub-Contractors.

Section Engineer à ARABIAN CONSTRUCTION COMPANY (ACC).
  • Émirats Arabes Unis - Dubaï
  • novembre 2009 à mai 2014

• Project 1: Volante Tower (Business Bay - Dubai- 300 Million Dirhams). A residential tower composed of a basement, GF and 26 upper floors, accommodating 2 and 4 bedroom flats. Client: Xtreme Visions Consultant: FNP
• Project 2: Princess Residence Tower (6B+G+100 Floors) - Dubai Marina- Tallest Residential Tower in the World - 414 meters
The high-rise multistory tower consists of 6 B + G.F +100 F is the tallest residential tower in the world is based on a 3500 sq. m area. The height of the tower is 414 meters with 750 luxury residential apartments along with duplex villas. The tower emerges out of 6 basements and 4 podium floors and is also served with health club facilities
Construction cost: AED 687, 000, 000 Client: Tameer Holding Investments Consultant: Engineer Adnan Saffarini
Responsibilities:
• Defined priority of the project and assigning the tasks to all site engineers, foremen and charge hands.
• Managed multiple, variable tasks, activities and processes from commencement date up to completion and handing over of completed works.
• Oversaw the overall site operations and management.
• Allocated resources (manpower and machinery) in line with the priority of grouping and milestones to be achieved.
• Liaised with Project Stakeholders, Consultant, Sub-Contractors and other relevant parties on technical, progress, inspections, testing and physical site works / construction-related matters.
• Liaised with third parties on coordination, interfaces and scheduling of works; all in line with time scales and working practices.
• Imparted and distributed information to site engineers on progressive basis upon receiving any documents i.e. drawing, Field Change Request, variations on works, Consultants comments and instructions, etc.
• Checked and analyzed correctness of information and drawings, marking and providing technical comments including providing on-site technical solutions and alternatives for any arising site issues.
• Determined, ascertained, verified and liaised with Engineering and technical team on technical drawings, project specifications and other documents forming part of Project Requirements and the compliance of physical works to all drawings (architectural, structural, construction, MEP drawings, etc.) and applicable international standard as well as code of practice.
• Solved site difficulties, issues, any Change Requests received from the Technical Department and superiors; and made cross-reference on approved drawings to ensure compliance of works as per design requirements and parameters.
• Formulated realistic parameters on sequencing of works based on Work Breakdown Structure.
• Supervised, monitored, controlled the progress of works, compliance and conformity of all works including materials; and identified level of risks which may impact the milestones and established dates.
• Created matrix, coordinated, tracked work progress and evaluated the accomplishment of tasks as per targeted and established milestones dates.
• Implemented standards of quality and workmanship to be achieved and assessed on a daily basis the performance and execution of works by Main Contractor and Sub-Contractors.
• Evaluation, verification and endorsement against Sub-Contractors monthly progress payment
• Prepared daily site progress reports and others as required.

Civil Site Engineer à Khatib & Alami - K&A
  • Émirats Arabes Unis - Dubaï
  • février 2007 à novembre 2009

Project 1: Green Community - Motor City, Nad Al Shibba, Dubai
Residential Building Comprising

• 286 Villas (Townhouse, Bungalow, Family Villa and Luxury Villa)
• 4 Residential buildings consisting of 160 apartments
• 5 Recreation Centers
• Commercial Center
• Main artificial lake consists of 5 basins
• 3 GSM towers

Client: Union Properties
Project Manager: EDARA
Main Contractor: El-Seif / ESEC Contracting Co.

Project 2: Dubai Jewel Tower, Dubai Media City, Dubai, U.A.E - Residential building comprising 3B+G+3P+39 Floors
• Basement Floors*3Nr. (Car-park and stores)
• Ground Floor (car-park, Entrances, Commercial Spaces, Services rooms)
• First & Second floor: Podium (car-park, department store, toilets, and service rooms)
• Third floors: Podium Health Club Floor (swimming pool and Gymnasium, squash courts, Tennis Courts), Mechanical Floor: Below 4th Floor (Double height)
• 4th to 15th Floors: Offices Floors, 16th to 42nd Floors: Residential Floors (26th Floor Technical Floor, 41st&42nd Floors Penthouses & Mechanical services Rooms)

Client: Sharaf Group
Main Contractor :( ABM) AL Basti & Muktha Contracting Co.
Responsibilities:
• Ensure responsibilities are fulfilled with high quality and in a cost-effective manner.
• Support Resident Engineers with managing client relations and expectations, as needed.
• Support Resident Engineers with organization inspections by third parties, as needed.
• Ensure client satisfaction with construction supervision services.
• Review shop drawings, materials submittals and bills of quantities for accuracy of calculation. Notify the Assistant Resident Engineer of any discrepancies.
• Supervision the installations of equipment on site.
• Closely work with the project team to carry out all inspection subject to daily form submitted by contractor.
• Monitor all safety aspects of the project and ensure strict adherence to safety regulation.

Civil Engineer à Khatib & Alami Consolidated Engineering Company L.L.C.
  • Émirats Arabes Unis - Dubaï
  • février 2007 à novembre 2009

• Ensure responsibilities are fulfilled with high quality and in a cost-effective manner.
• Support Resident Engineers with managing client relations and expectations, as needed.
• Support Resident Engineers with organization inspections by third parties, as needed.
• Ensure client satisfaction with construction supervision services.
• Review shop drawings, materials submittals and bills of quantities for accuracy of calculation. Notify the Assistant Resident Engineer of any discrepancies.
• Supervision the installations of equipment on site.
• Closely work with the project team to carry out all inspection subject to daily form submitted by contractor.
• Monitor all safety aspects of the project and ensure strict adherence to safety regulation.

Civil Site Engineer à Engineering Services Office-
  • Syrie - Soueïda
  • juin 2006 à février 2007

2006-2007

Civil Engineer, Engineering Services Office - Syria

Responsibility:

Designed and supervised structural works for commercial / residential buildings (such as villas, building /B+G+4/)

Civil Engineer à Engineering Services Office
  • Syrie - Soueïda
  • janvier 2006 à janvier 2007

Responsibility:

Designed and supervised structural works for commercial / residential buildings (such as villas, building /B+G+4/)

Éducation

Baccalauréat, BSC in Civil Engineering,
  • à Faculty of Engineering, Damascus University
  • janvier 2006

Specialties & Skills

Civil Engineering
AutoCAD 2D
MS Office tools
Fit out
Construction Management
CONSTRUCTION
DRAWING
OPERA (WEB BROWSER)
CHANGE REQUEST
COMMISSIONING
MECHANICAL ELECTRICAL AND PLUMBING (MEP) SYSTEMS
FINALIZATION
INVESTMENTS
OPERATIONS
CUSTOMER RELATIONS
SUPERVISORY SKILLS
CONSULTING
ENGINEERING
MATERIALS MANAGEMENT
MICROSOFT WORKS
PROGRESS
QUALITY

Profils Sociaux

Site Web Personnel
Site Web Personnel

Le lien a été supprimé pour non-respect des conditions d'utilisation. Veuillez contacter l’équipe d'assistance pour plus d'informations.

Langues

Arabe
Expert
Anglais
Expert
Allemand
Moyen

Adhésions

Society of Engineers – UAE
  • Civil Structural Engineer
  • November 2013
Society of Engineers – SYR
  • Civil Structural Engineer
  • December 2006

Formation et Diplômes

Introduction to Project Management (Certificat)
Date de la formation:
August 2020
Construction Project Management (Certificat)
Date de la formation:
August 2020

Loisirs

  • Sports
    Football and Volleyball