Structural Engineer
Consolidated Contractors Company CCC
مجموع سنوات الخبرة :14 years, 7 أشهر
• Prepared, revised, and issued shop drawings and bar bending schedules.
Projects
• City Centre Almaza at Cairo
More than 100, 000 Km2 of retail space.
• Prepared, revised, and issued shop drawings, as-built drawings and bar bending schedules.
• Performed quantity take-offs.
• Prepared and issued invoices.
• Monitored projects progression and issued status reports.
• Contributed in study and estimation of projects.
• Coordinated with team members drawings and details.
• Responsible for calculations of tendons elongations, and preparation and issuing of tendons stressing reports, for post-tensioned and pre-tensioned concrete systems.
• Supervised stressing and grouting site works.
Projects
• Automated People Mover Viaduct at Cairo International Airport
1.80 Km Viaduct; 150 Pre-cast Post-tensioned Girders, 1040 Pre-cast Cross Girders, 570 Pre-cast Panels and 56 Piers.
• King Abd El-Aziz International Airport Bridges & Interchanges at Jeddah
1.79 Km Bridge; 52 cast in situ Post-tensioned Box Girder Decks and 140 Piers.
• The Holy Mosque at Mecca - Mataf Extension Phase 2
All Beams’ Post-tension works.
• Al-Sail Interchange - Bridges No. 1 & No. 3 at Mecca
160 Pre-cast Post-tensioned Beams.
• Pedestrian Crossing at Muzdalifa Station at Mecca
12 Pre-cast Pre-tensioned Beams.
• Bridge at Intersection of Madinah Road with Halima El-Saadeyya at Mecca
36 Pre-cast Post-tensioned Beams.
• Taibah University - College of Medicine at Madinah
More than 9000 Pre-cast concrete panels for buildings’ facades.
• Supervised execution of Post-tensioned Slabs.
• Supervised and managed preparations, stressing and grouting site works.
• Calculated tendons elongation.
Projects
• Palm Hills Mall at Fifth Settlement at Cairo
• Hanimex Mall at Fifth Settlement at Cairo
• Designed concrete structures, steel structures and curtain walls.
• Modelled structures and analyzed loads applied on it.
• Prepared and issued structural design drawings.
• Performed quantity take-offs.