Site Engineer
Aces
مجموع سنوات الخبرة :11 years, 8 أشهر
Project: Tawal 5G phase 2, Huawei, Mobily, Aramco projects.
• Scope of Work:
- Supply & installation of DC cabinet power plant with backup batteries & configuration with testing and commissioning
- Prepared and reviewed engineering specifications, scopes of work, schedules of payments and other documents.
- Supervised implementation of work packages, from approval to package closeout and post-maintenance testing.
- Supervised field personnel to achieve project completion to schedule with quality workmanship that conforms to original plans and specifications.
- Checked technical designs and drawings for adherence to standards.
- Inspection site civil, fiber activities for ITC FTTH PROJECT and preparing Daily Activity report.
- Responsible for maintain the quality of work and make daily inspection on site to
make sure contractors are following ITC standard.
- Responsible for on-site installation, testing, commissioning for FTTH project.
- Provide technical support to contractors through remote and on-site trouble-shooting.
- Perform construction and maintenance of OSP infrastructure according to industry standards.
- Maintain safety and security of OSP facility.
- Develop engineering specifications and follow engineering standards for assigned projects.
- Perform route analysis and develop aerial and underground fiber route maps.
- Handle fiber verification and mapping activities.
- Maintain records of fiber splicing and topography.
- Use CAD and other software to develop engineering designs.
- Responsible for inspection for all fiber work installation and cable pulling, splicing, power meter testing, OTDR testing to handover sites to O&M team in ITC company .
- Firefighting and fire alarm system installation, testing and commissioning, and FM200 system and FIRE SUPPRESSION SYSTEMS / NOVEC™.
- Responsible for shop drawing, coordination drawing with main contractor.
- Quantifying the quantities of materials required.
- Low current system installation, testing and commissioning, CCTV and security systems, IPTV, access control.
- Responsible for keeping the communication between water and electricity meters with the server (VPN network).
- Maintaining and programming electricity meters and communication unit using RF module and RS 232 cables and optical cables and Maintaining PCB for electricity meters and communication unit.
- Installing communication units in the site and measuring signal quality to find the best place with highest signal strength.
- Responsible for training engineers and technician to the system and water and electricity meters.
- Responsible for installing and programming flow meters (electromagnetic, ultra sonic from Siemens) and data logger from HALMA water management.
- Responsible for installing new electrical meters and high power meters.
• Accumulative Grade: Satisfactory. • Graduation project grade: Good // • Graduation Project: Laser Communication System, which allow transferring data (audio and voice) in the vacuum using a laser beam.