Technical manager
Advanced Electric Factory
Total des années d'expérience :12 years, 3 Mois
Project: Waste water Treatment Plant in Reghaia Algeria
Water treatment plant in Maouane
- Study, design and manufacturing of LV distribution panel boards
- Study, design and manufacturing of motor control center
- Study of power factor correction
- Development balance of power, multi-wire diagrams, single line diagrams, calculation notes,
design and layout electrical room, layout cable ways.
- Transformer substation technical files
Project: Seawater desalination plant in Djerba with capacity 50000m3/day
- Study, design and manufacturing of LV distribution panel boards
- Study, design and manufacturing of motor control center
- Planning, coordination and monitoring of electrical work on site
- Testing and commissioning of variable speed drive, soft starter, medium voltage
switchgear, MV / LV power transformer
- Engineering and installation of MV / MV and MT / LV transformer stations
Project costing
- Study and design of electrical installations according to specifications
- Analysis of customer specifications and manage the technical specifications suppliers
- Study and elaboration of the execution files
- Technical coordination with the customer and subcontractor
Tunisia
- Study and design of electrical installation
- Study and design of electrical boards
- Study and design of fire safety system
- Preparation of study plans
- Writing of the written documents (CCTP, CCAP, Border Price)
- Monitoring the execution of projects
Study and elaboration of the execution files
- CFO and CFA execution plan
- Single-line diagram and design of LV distribution panel boards
- Calculation note voltage drop, short-circuit current, cable cross-section, selectivity
- Illumination calculation note