Project Manager
ORTEC Group
مجموع سنوات الخبرة :10 years, 11 أشهر
Location: TAKORADI (ONSHORE) - GHANA
Client: SAIPEM / ENI
Project: Takoradi Tema Interconnexion Project (TTIP)
Location: Cabinda (ONSHORE) - ANGOLA
Client: CHEVRON
Project: Malongo Existing dock replacement
Responsability:
Manage and plan the work of 120 persons including 15 Expat and 105 locals.
Realization :
Realization of the new dock with a structure that has the same level of structural integrity, durability, maintenance and operation as the old dock including the associated service lines and 2 pumping stations (250m3 / h and 600m3 / h)
Location: Port Gentil (OFFSHORE) - Gabon
Client: TOTAL GABON
Project: Metal contract - Maintenance platform Torpille with these 12 satellites
Responsibility:
Respect and ensure the respect of HSE regulations and procedures.
Follow evolution of the manufacturing and prepare the planning to follow to
respect the contractual deadlines.
Monitor and control the quality / NDT
Conducted operational sites (meetings, visits),
Managing a study ( 2 Persons) and an installation team ( 30 Persons)
Monitoring of the project and preparation daily, weekly and monthly statistical
progress.
Coordinate internal and external stakeholders (BE and Subcontractors)
Analyzes risks related to the work,
Conduct audits and animate conferences.
· Location: Pointe-Noire CONGO Brazzaville
· Client: SCLOG
· Project: rehabilitation fire fighting system for two oil storage sites at Pointe Noire and Brazzville
· Responsibility:
Supervise the progress of two projects: design, manufacturing, assembly, budget monitoring and preparation of weekly statistical progress
Responding to tenders and constitute technical and business issues
Managing a study ( 5 Persons) and an installation team ( 61 at PNR & 53 at BZV)
Coordinate internal and external stakeholders (BE and Subcontractors)
Ensure the proper execution of the tasks assigned to the HSE Officer and Quality Controller.
Establish and follow the commissioning, performance tests and checklists
SITE MANAGER at Friedlander (ORTEC Group)
· Location: Gold Mine in Mauritania Tasiast
· Client: HATCH / KINROSS
· Project: Construction of new gold plant
· Responsibility:
Complete management of the project (Prospecting, implementation, monitoring)
Conducted operational sites (meetings, visits),
Planning and implementation of installation teams (60 persons),
Analyzes risks related to the work,
Performs audits and animates lectures,
Trigger risk analyzes necessary for the safety of the work,
Ensure the proper execution of the tasks assigned to the HSE Officer and Quality Controller.
Monitoring of the project and preparation of statistical progress weekly.
Assistance to construction sites by technical support in terms of preparation of calculations to solve problems with Bearings or choice of appropriate firestop system by using HILTI softwares and engineering products.
Location: Sousse, Tunisia, Herga sousse
Company Industry: Construction
Job Role: Engineering
February 2010 - Present
Projects:
1. From April 2012 to August 2012:
• Function: Engineer foreman - construction supervisor
• Location: Gold Mine in Mauritania Tasiast
• Client: FRIEDLANDER / HATCH / KINROSS
• Project: Implementation of GRE pipes of 24 wellheads supplying water to the gold mine (more than 15, 000 inches).
• Roles:
Complete management of the case (Prospecting, implementation, monitoring)
Conducted operational sites (meetings, visits)
Planning and implementation of installation teams (12 persons)
Monitoring of the project and preparation of statistical progress weekly.
2. From April 2010 to March 2012:
• Function: Engineer Account Manager
• Location: phosphoric acid plant Skhira - Tunisia
• Client: TIFERT (Tunisian Indian Fertilizers) + TECHNIP
• Project: Design works and installation of pipes, tanks and plastic sheaths GRP, PVC & HDPE relating to the storage area of phosphoric acid and the network of sea water(more than 67, 000 inches).
• Roles:
Full management of the business (Exploration, study, implementation, monitoring and delivery).
Conducted operational sites (meetings, visits)
Writing and contracting.
Preparation of the installation schedule.
Management of an administrative department (5 employees) and service fabrication and installation (32 people)
Planning and implementation of installation teams.
Animation of technical meetings and Commercial weekly
Tracking of the project and prepare monthly progress statistics
Monitoring the evolution of the project costs
Design and development of 3D models station oil and gas using the CAD software MicroStation V8 and Catia V5
Mechanical Engineering diploma from the National School of Engineers of MONASTIR (ENIM – Tunisia)
لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.