project manager
HADEEL AL JAZERRA TRADING & COTRACTING CO.
Total des années d'expérience :17 years, 5 Mois
Work as Facility management for
Al BARKA Chalet (benader )
Plot No. 1729 Chalet (benader)
SABAH AL-SALEM UNIVERSITY CITY - KUWAIT UNIVERSITY
Administration Facilities (ADFA)
Determine and define project scope and objectives
• Predict resources needed to reach objectives and manage resources in an effective and efficient manner
• Prepare budget based on scope of work and resource requirements
• Track project costs in order to meet budget
• Develop and manage a detailed project schedule and work plan
• Provide project updates on a consistent basis to various stakeholders about strategy, adjustments, and progress
• Manage contracts with vendors and suppliers by assigning tasks and communicating expected deliverables
• Utilize industry best practices, techniques, and standards throughout entire project execution
• Monitor progress and make adjustments as needed
• Measure project performance to identify areas for improvement
• Adherence to our Quality Management System procedures and its performance.
• Ensure proper tools and testing devices used at site and safe keeping of all testing devices
• Preparing the shop DRW and material submittal
• Scope of work
Power disruptions system, UPS, diesel Generators, fuel system
Lighting system, Lighting control system
Theater light control system
Fire alarm system and voice evacuation system
Car park management system
Data center
Rigger system
Solar system (photovoltaic panel )
A) GREEN ENERGY Electrical & Electronics Equipment (Kuwait)
From March 2012 till date
Marketing and sales manager for LED light and Solar system
B) Green line (Engineering Contracting & trading) (Kuwait)
From October 2010 to February 2012
Position- Electrical Engineer
Project garden discrete (GD 2) maintenance of the 41 gardens and 4 walk
ways for the area of GD2
C) Wadi Matrah EST for contracting (Riyadh, KSA)
From August 2009 to July 2010
Position- Electrical Engineer
Task- Project coordination with Client to finalize the schedule, forms, QA/QC
requirements as per project requirement and company policy, Make the quotations for submission, preparing the requirements for the new project
D) Al Gurg Consultants (UAE-DUBAI)
From November 2006 to July 2009
Position- Electrical Engineer
Task- Project coordination with Client/Contractor to finalize the schedule, forms,
QA/QC requirements as per project requirement and company policy.
Contractors complete activities tracking, material approvals, shop drawings
approvals, method statements, QA/QC manuals, inspection approvals. Time to time follow up and conducting meeting for progress review and complete
activities monitor and proper contractual correspondence to track the delays and savings.
Projects-
1) 2B+G+8 West office Building project for Dubai Airport Free Zone
Authorities (DAFZA) at Dubai Airport Free Zone, Dubai
2) 2B+G+3 Typical + 1 Business Floor office Building project for Dubai Airport Free Zone
Authorities (DAFZA) at Dubai Airport Free Zone, Dubai
E) M/S Gemac (General Engineering & Management Consultants)
From November 2004 till November 2006
Position- Electrical Engineer
Task- Supervising the Installations carried out by Electrical Contractors. Inspecting
Material received at site for compliance with the approved submittals. Giving Non
Confirmation Report for any bad installation and follow it up that the same is
rectified and NCR closed. Pre-closing inspection of the Electrical works above false
ceiling. Inspecting the material used at site to comply with the approved material.
Preparing the final snag lists for the project on receipt of completion notice from contractor.
Projects- IBN BATTUTA MALL
Witnessing the Testing of all the electrical services commissioning and handing over to the client of the all services
Bachelor Degree of Electrical and Electronics Engineering Near East University North Cyprus, Turkey